EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE EXECUTIVE GOVERNOR |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11001001 |
OFFICE OF THE EXECUTIVE GOVERNOR |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11001001/ 23010105/ 13000001 |
Purchase of 30 No vehicles for Government House:
i. 10No. Amord vehicle
ii. 10No. Pardo Jeep
iii. 10No Toyota Camry for the Principal Officers. |
1301 |
300,000,000 |
304,476,500 |
200,000,000 |
0 |
97,500,000 |
303,000,000 |
303,000,000 |
703,500,000 |
2,011,477,801.00 |
11001001/ 23010108/ 13000002 |
Purchase of 1No Toyota Coaster bus for Government House staff. |
1301 |
0 |
0 |
40,000,000 |
0 |
16,250,000 |
25,000,000 |
25,000,000 |
66,250,000 |
|
11001001/ 23010128/ 13000003 |
Purchase and installation of security equipment:
i. Bullet proof vests
ii. Helmets
iii. CCTV etc. |
1301 |
100,000,000 |
0 |
10,000,000 |
0 |
78,650,000 |
0 |
0 |
78,650,000 |
|
11001001/ 23010122/ 13000004 |
Purchase of Diagnostic equipment for Government House Clinic:
i. Auto clave machine
ii. Ent diagnostic equipment
iii. Ocular microscope
vi. Auto analyzer.
|
1301 |
50,000,000 |
0 |
5,000,000 |
0 |
6,500,000 |
12,100,000 |
6,600,000 |
25,200,000 |
|
|
11001001/ 23020105/ 13000005 |
Construction of motorize borehole with overhead tanks at Presidential Lodge. |
1301 |
2,000,000 |
0 |
2,000,000 |
0 |
2,145,000 |
0 |
0 |
2,145,000 |
|
|
SUB-TOTAL |
|
452,000,000 |
304,476,500 |
257,000,000 |
0 |
201,045,000 |
340,100,000 |
334,600,000 |
875,745,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE EXECUTIVE GOVERNOR |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11001001 |
OFFICE OF THE EXECUTIVE GOVERNOR |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
|
|
11001001/ 23020105/ 13000006 |
Construction of 6No. Visitor restroom inside Government House premises
i. 3 for male
ii. 3 for female |
1301 |
1,100,000 |
0 |
3,000,000 |
0 |
2,145,000 |
0 |
0 |
2,145,000 |
|
11001001/ 23020118/ 13000007 |
Rehabilitation, asphalting and repair of SA's Secretariat COS & PS parking
lots/walk ways (old Governor's Office) |
1301 |
1,000,000 |
0 |
5,000,000 |
0 |
15,730,000 |
0 |
0 |
15,730,000 |
|
11001001/ 23060200/ 13000008 |
Grant to agencies: Police, Army, SSS. |
1301 |
100,000,000 |
0 |
55,000,000 |
0 |
0 |
0 |
0 |
0 |
|
11001001/ 23010113/ 13000009 |
Renovation of Governor’s Office, Governor’s Lodge and Presidential Lodge. |
1301 |
0 |
0 |
200,000,000 |
40,609,300 |
32,500,000 |
0 |
0 |
32,500,000 |
|
11001001/ 23010139/ 13000010 |
Purchase of communication equipment for communication department:
i. Cutis cable
ii. PABS cable
iii. Walking talkie etc. |
1301 |
0 |
0 |
5,000,000 |
0 |
7,865,000 |
0 |
0 |
7,865,000 |
|
11001001/ 23020105/ 13000011 |
Construction and equipment of an ultra modern mechanic workshop in Government House. |
1301 |
0 |
0 |
0 |
0 |
13,000,000 |
40,000,000 |
0 |
53,000,000 |
|
11001001/ 23050103/ 13000012 |
Purchase of 34Nos Hilux vehicles for 34 SSAs and SAs to the Governor |
1301 |
0 |
0 |
80,000,000 |
0 |
0 |
22,666,000 |
22,666,000 |
45,332,000 |
|
|
SUB-TOTAL |
|
102,100,000 |
0 |
348,000,000 |
40,609,300
|
71,240,000 |
62,666,000
|
22,666,000 |
156,572,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE EXECUTIVE GOVERNOR |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11001001 |
OFFICE OF THE EXECUTIVE GOVERNOR |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
|
|
11001001/ 23010115/ 13000013 |
Purchase of Office Equipments:
i. Upholstery
ii. Refrigerator
iii. Photocopying Machines
iv. Television sets and DSTV Installation
etc. for 34 SSAs & SAs to the Governor. |
1301 |
0 |
0 |
1,000,000 |
0 |
19,500,000 |
22,000,000 |
22,000,000 |
63,500,000 |
|
11001001/ 23010105/ 13000014 |
Purchase of operational vehicles for departments special advisers. |
1301 |
0 |
0 |
50,000,000 |
0 |
97,500,000 |
0 |
0 |
97,500,000 |
|
11001001/ 23010128/ 13000015 |
Development of internal security (Purchase of security equipment) |
1301 |
0 |
0 |
366,000,000 |
0 |
130,000,000 |
0 |
0 |
130,000,000 |
|
11001001/ 23010105/ 13000016 |
Rehabilitation of armoured personnel carrier. |
1301 |
0 |
0 |
50,000,000 |
0 |
32,500,000 |
0 |
0 |
32,500,000 |
|
11001001/ 23010105/ 13000017 |
Equity contribution, licenses fee for year 2017, geological study for our salt
deposit for the Department of Cement and Salt Production |
1301 |
0 |
0 |
1,000,000,000 |
0 |
130,000,000 |
0 |
0 |
130,000,000 |
|
|
SUB-TOTAL |
|
|
0 |
1,467,000,000 |
0 |
409,500,000 |
22,000,000 |
22,000,000 |
453,500,000 |
|
TOTAL CAPITAL EXPENDITURE GOVERNMENT HOUSE |
554,100,000 |
304,476,500 |
2,072,000,000 |
40,609,300 |
681,785,000 |
424,766,000
|
379,266,000 |
1,854,732,666 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE DEPUTY GOVERNOR |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11001002 |
DEPUTY GOVERNOR'S OFFICE |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11001002/
23040101/
13000001 |
Complete Asphalt overlay of the premises of Deputy Governor. |
1319 |
30,000,000 |
7,535,000 |
10,000,000 |
7,535,000 |
15,000,000 |
10,000,000 |
5,000,000 |
30,000,000 |
|
11001002/
23040101/
13000002 |
Boundary Demarcation |
1319 |
- |
- |
50,000,000 |
- |
10,500,000 |
100,000,000 |
50,000,000 |
110,500,000 |
|
11001002/
23030101/
13000003 |
Rehabilitation/Repairs of Office Building |
1319 |
20,000,000 |
18,953,933 |
30,000,000 |
- |
20,000,000 |
80,000,000 |
50,000,000 |
150,000,000 |
|
11001002/
23030127/
13000004 |
Internet connectivity and full computerization of the Deputy Governor's
Office/Boundary Secretariat. |
1319 |
- |
- |
2,000,000 |
- |
0 |
3,000,000 |
2,000,000 |
5,000,000 |
|
11001002/
23020118/
13000005 |
Construction of Office Garage and Gate House. |
1319 |
20,000,000 |
- |
6,000,000 |
- |
4,000,000 |
8,000,000 |
6,000,000 |
18,000,000 |
|
|
SUB-TOTAL |
|
70,000,000
|
26,488,933
|
98,000,000
|
7,535,000
|
49,500,000
|
201,000,000
|
113,000,000
|
313,500,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE DEPUTY GOVERNOR |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11001002 |
DEPUTY GOVERNOR'S OFFICE |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11001002/
23010106/
13000006 |
Purchase of 1No. Hilux pick-up Van for
State Boundary Committee. |
1319 |
0 |
0 |
8,000,000 |
0 |
15,000,000 |
- |
- |
15,000,000 |
|
11001002/
23010112/
13000007 |
Purchase of furniture and fittings for Office and lodge. |
1319 |
0 |
0 |
2,500,000 |
0 |
15,000,000 |
10,000,000 |
5,000,000 |
30,000,000 |
|
11001002/
23010115/
13000008 |
Purchase of giant Photocopying machine for State Boundary Secretariat. |
1319 |
300,000 |
0 |
250,000 |
0 |
500,000 |
300,000 |
200,000 |
1,000,000 |
|
11001002/
23020118/
13000009 |
Rehabilitation of Deputy Governor's Lodge |
1319 |
|
|
|
- |
0 |
- |
- |
0 |
|
|
SUB-TOTAL |
|
300,000 |
|
10,750,000 |
0 |
30,500,000 |
10,300,000 |
5,200,000 |
46,000,000 |
|
TOTAL CAPITAL EXPENDITURE OFFICE OF THE DEPUTY GOVERNOR |
70,300,000
|
26,488,933 |
108,750,000
|
7,535,000
|
80,000,000
|
211,300,000
|
118,200,000
|
359,500,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
DEPARTMENT OF BORDER, PEACE AND CONFLICT RESOLUTION |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11004001 |
DEPARTMENT OF BORDER, PEACE AND CONFLICT RESOLUTION |
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11004001/
23010108/
13000001 |
Purchase of (1) Utility Bus |
1319 |
7,000,000 |
0 |
8,000,000 |
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
11004001/
23010106/
13000002 |
Purchase of (2) Hilux Vehicles |
1319 |
0 |
0 |
22,000,000 |
0 |
30,000,000 |
0 |
0 |
30,000,000 |
|
11004001/
23010139/
13000003 |
Purchase of other office equipments:
(2) Two set of computer for video editing. |
1319 |
0 |
0 |
2,000,000 |
0 |
2,600,000 |
0 |
0 |
2,600,000 |
|
11004001/
23010139/
13000004 |
(ii). Video editing Machine (1) |
1319 |
0 |
0 |
2,000,000 |
0 |
3,000,000 |
0 |
0 |
3,000,000 |
|
11004001/
23010139/
13000005 |
(iii). One canon Photo Machine |
1319 |
0 |
0 |
1,500,000 |
0 |
1,000,000 |
0 |
0 |
1,000,000 |
|
11004001/
23010139/
13000006 |
(iv). One DVD recorder |
1319 |
0 |
0 |
700,000 |
0 |
500,000 |
0 |
0 |
500,000 |
|
11004001/
23010139/
13000007 |
(v). One Digital Video player |
1319 |
0 |
0 |
300,000 |
0 |
200,000 |
0 |
0 |
200,000 |
|
11004001/
23010139/
13000008 |
Purchase of (1) photocopying machine |
1319 |
0 |
0 |
300,000 |
0 |
500,000 |
0 |
0 |
500,000 |
|
11004001/
23010139/
13000009 |
Provision & Installation of Six (6) Bill Boards on Peace and Security designated
flash points across geo-political zones of the State. |
1319 |
0 |
0 |
2,000,000 |
0 |
2,000,000 |
0 |
0 |
2,000,000 |
|
11004001/
23010139/
13000010 |
Purchase of 1No. Motorcycle |
1319 |
0 |
0 |
150,000 |
0 |
200,000 |
0 |
0 |
200,000 |
|
TOTAL CAPITAL EXPENDITURE DEPART OF BORDER, PEACE & |
|
7,000,000 |
0 |
38,950,000 |
0 |
50,000,000 |
0 |
0 |
50,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
DEPARTMENT OF GRANTS, DONOR AND PARTNERSHIP |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11007001 |
DEPARTMENT OF GRANTS, DONOR AND PARTNERSHIP |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE EMERGENCY MGT AGENCY (SEMA) |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11008001 |
EBONYI STATE EMERGENCY MGT AGENCY (SEMA) |
|
|
|
|
|
|
|
|
|
SOCIETAL RE-ORIENTATION |
|
|
|
|
|
|
|
|
|
|
11008001/
23020118/
02000001 |
DISASTER RESPONSE
Provision and stock piling of relief materials for victims of various disaster
in the State such as foam, mattress, plates, spoons, Nylon mats, blankets,
insecticide treated mosquito nets, roofing sheets, roofing nails, planks etc. |
0207 |
0 |
0 |
20,000,000 |
0 |
56,800,000 |
22,000,000 |
19,000,000 |
97,800,000 |
|
11008001/
23010106/
02000002 |
Procurement of 1No. Hilux Van and 1No Ambulance |
0207 |
0 |
0 |
0 |
0 |
25,000,000 |
0 |
0 |
25,000,000 |
|
11008001/
23010112/
02000003 |
Procurement of 4No. Steel cabinets for files storage. |
0207 |
0 |
0 |
0 |
0 |
500,000 |
0 |
0 |
500,000 |
|
11008001/
23010139/
02000004 |
Procurement and installation of 5No. Air conditioner for HOD's Offices. |
0207 |
0 |
0 |
0 |
0 |
1,000,000 |
0 |
0 |
1,000,000 |
|
11008001/
23010119/
02000005 |
Purchase of 1No. Power Generating Set. |
0207 |
150,000 |
0 |
150,000 |
0 |
1,200,000 |
0 |
0 |
1,200,000 |
|
|
SUB-TOTAL |
|
150,000 |
0 |
20,150,000 |
0 |
84,500,000 |
22,000,000 |
19,000,000 |
125,500,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE EMERGENCY MGT AGENCY (SEMA) |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11008001 |
EBONYI STATE EMERGENCY MGT AGENCY (SEMA) |
|
|
|
|
|
|
|
|
|
SOCIETAL RE-ORIENTATION |
|
|
|
|
|
|
|
|
|
|
11010001/ 23010113/ 13000006 |
Procurement of other office equipment
a. 2No. Duplicating machine
b. 1No. Video
c. 1No. Digital Camera
d. 5No. Radio sets
e. Flash Drive
f. 5No. DVD set
g. DSTV
h. No LED TV set |
0207 |
0 |
0 |
0 |
0 |
2,000,000 |
0 |
0 |
2,000,000 |
|
11010001/ 23010114/ 13000007 |
Procurement of 3No. Printer |
0207 |
0 |
0 |
0 |
0 |
500,000 |
0 |
0 |
500,000 |
|
11008001/
23010119/
02000008 |
Advocacy, Enlightenment |
0207 |
0 |
0 |
0 |
0 |
3,000,000 |
0 |
0 |
3,000,000 |
|
11008001/
23010119/
02000009 |
Field work & Research |
0207 |
0 |
0 |
0 |
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
15,500,000 |
0 |
0 |
15,500,000 |
|
TOTAL CAPITAL EXPENDITURE SEMA |
30,150,000 |
0 |
150,000 |
0 |
100,000,000 |
22,000,000 |
19,000,000 |
141,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE COUNCIL ON PUBLIC PROCUREMENT |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11010001 |
EBONYI STATE COUNCIL ON PUBLIC PROCUREMENT |
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11010001/ 23010124/ 13000001 |
Preparation, production and printing of contract documents biddings, laws bills
and uniform template in the award and execution of cotracts in recurrent and
capital budget of the MDAs in the State. |
1301 |
0 |
0 |
0 |
0 |
2,600,000 |
0 |
2,000,000 |
4,600,000 |
|
11010001/ 23050103/ 13000002 |
Monitoring and Evaluation of Capital Budget in both MDAs and LGAs |
1301 |
0 |
0 |
0 |
0 |
650,000 |
0 |
0 |
650,000 |
|
11010001/ 23010112/ 13000003 |
Purchase of Office Furniture and fittings like cushions, chairs, table,
curtains. |
1301 |
7,000,000 |
300,000 |
1,230,000 |
0 |
650,000 |
0 |
0 |
650,000 |
|
11010001/ 23010105/ 13000004 |
Purchase of 1No. Motor Vehicle (Hilux Toyota) |
1301 |
0 |
0 |
8,000,000 |
0 |
15,000,000 |
0 |
0 |
12,500,000 |
|
11010001/ 23010104/ 13000005 |
Purchase of 1No. Motorcycles |
1301 |
0 |
0 |
120,000 |
0 |
150,000 |
0 |
0 |
150,000 |
|
11010001/ 23050102/ 13000006 |
Computerization of public procurement office. |
1301 |
0 |
0 |
20,000,000 |
0 |
6,072,500 |
0 |
0 |
6,072,500 |
|
11010001/ 23010114/ 13000007 |
Purchase of 2No. Computer Printer |
1301 |
200,000 |
200,000 |
100,000 |
0 |
65,000 |
0 |
0 |
65,000 |
|
11010001/ 23010115/ 13000008 |
Purchase of 1No. Photocopying machines. |
1301 |
300,000 |
0 |
150,000 |
0 |
325,000 |
0 |
0 |
325,000 |
|
|
SUB-TOTAL |
|
7,500,000
|
500,000
|
29,600,000
|
0 |
25,512,500
|
0 |
2,000,000
|
25,012,500
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE COUNCIL ON PUBLIC PROCUREMENT |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11010001 |
EBONYI STATE COUNCIL ON PUBLIC PROCUREMENT |
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11010001/ 23010118/ 13000009 |
Purchase of 1No. Scanners |
1301 |
0 |
0 |
100,000 |
0 |
65,000 |
0 |
0 |
65,000 |
|
11010001/ 23010139/ 13000010 |
Purchase of:
1No.Public Address system
1No. Projector with complete set
1No. Video censor camera
1No. Computer video production equipment editing machines and accessories
|
1301 |
0 |
0 |
0 |
0 |
650,000 |
0 |
0 |
650,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
100,000 |
0 |
715,000 |
0 |
0 |
715,000 |
|
TOTAL CAPITAL EXPENDITURE STATE COUNCIL ON PUBLIC PROCUREMENT |
1,200,000 |
500,000 |
29,700,000 |
0 |
26,227,500 |
0 |
2,000,000 |
28,227,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE SECRETARY TO THE STATE GOVERNMENT |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11013001 |
OFFICE OF THE SECRETARY TO THE STATE GOVERNMENT |
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11013001/ 23040101/ 13000001 |
Landscaping services at Cabinet Office. |
1319 |
15,000,000 |
0 |
10,000,000 |
0 |
9,750,000 |
0 |
0 |
9,750,000 |
|
11013001/ 23020105/ 13000002 |
Reticulation of water in Cabinet Office. |
1319 |
3,000,000 |
0 |
5,000,000 |
0 |
4,550,000 |
1,000,000 |
0 |
5,550,000 |
|
11013001/ 23010113/ 13000003 |
Purchase of 10Nos Computers
ii. Purchase of 10Nos HPD 13 Lap top computers. |
1319 |
500,000 |
0 |
1,700,000 |
0 |
1,950,000 |
0 |
0 |
1,950,000 |
|
11013001/ 23010115/ 13000004 |
Purchase of 5Nos photocopying machines |
1319 |
750,000 |
0 |
750,000 |
0 |
1,462,500 |
0 |
0 |
1,462,500 |
|
11013001/ 23010115/ 13000005 |
Provision of assistance to purchase monetized vehicles for government officers
to enable them pay back installmently. |
1319 |
0 |
0 |
0 |
1,200,000,000 |
1,700,000,000 |
0 |
0 |
1,700,000,000 |
|
11013001/ 23010114/ 13000006 |
Purchase of 5Nos Printers. |
1319 |
500,000 |
0 |
250,000 |
0 |
247,000 |
0 |
0 |
247,000 |
|
11013001/ 23010108/ 13000007 |
Purchase of
i.2No. 18 seater Bus (CVU)
ii. 3No. Hiace Bus |
1319 |
35,000,000 |
0 |
21,000,000
|
0 |
42,900,000 |
0 |
0 |
42,900,000 |
|
11013001/ 23010106/ 13000008 |
Purchase of 1Nos Hilux Vans |
1319 |
21,000,000 |
0 |
16,000,000 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
11013001/ 23050108/ 13000009 |
Consultancy on capital projects. Ebonyi State Assets inventory control
management. |
1319 |
0 |
0 |
10,000,000 |
0 |
6,825,000 |
0 |
0 |
6,825,000 |
|
11013001/ 23050108/ 13000010 |
Consultancy on capital project production of standard Ebonyi State Business
information catalogue. |
1319 |
0 |
0 |
15,000,000 |
0 |
10,075,000 |
0 |
0 |
10,075,000 |
|
|
SUB-TOTAL |
|
40,785,000 |
0 |
100,000,000 |
1,200,000,000 |
1,792,759,500 |
1,000,000
|
0 |
1,793,759,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE SECRETARY TO THE STATE GOVERNMENT |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11013001 |
OFFICE OF THE SECRETARY TO THE STATE GOVERNMENT |
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11013001/ 23010112/ 13000011 |
Renovation of Multi-purpose Hall |
1319 |
0 |
0 |
0 |
0 |
13,325,000 |
0 |
0 |
13,325,000 |
|
11013001/ 23010112/ 13000012 |
Purchase of office furniture and fittings:
i. 20Nos steel cabinet
ii. 1No. Sonny video camera
|
1319 |
0 |
0 |
0 |
0 |
455,000 |
0 |
0 |
455,000 |
|
11013001/ 23010139/ 13000013 |
Purchase of 10No. Plasma Television for cabinet office.
|
1319 |
0 |
0 |
0 |
0 |
975,000 |
0 |
0 |
975,000 |
|
11013001/ 23010105/ 13000014 |
Renovation of Cabinet Office (Paint, curtains/accessories for the ECA, Accts,
Admin, EXCO/PSSD Departments |
1319 |
0 |
0 |
0 |
0 |
1,950,000 |
0 |
0 |
1,950,000 |
|
11013001/ 23010118/ 13000015 |
Procurement and installation of 10Nos Iron doors in all main entrance leading to
each Department of SSG's Office |
1319 |
0 |
0 |
0 |
0 |
780,000 |
0 |
0 |
1,200,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
17,485,000
|
0 |
0 |
17,485,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE SECRETARY TO THE STATE GOVT. (CREDIT INTERVENTION FUND MANAGEMENT
OFFICE) |
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11013001 |
CREDIT INTERNEVTION FUND MANAGEMENT OFFICE |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11013001/ 23010115/ 13000001 |
Purchase of Office furniture and fittings
i. Purchase of 2Nos of semi Executive tables
ii. 2Nos Arm back chair
iii. 2Nos Computer table
iv. 2Nos Armless visitors' chair |
1319 |
0 |
0 |
0 |
0 |
1,755,000 |
0 |
0 |
1,755,000 |
|
11013001/ 23010115/ 13000002 |
Purchase of office equipment
i. 1No Television
ii. 1No. Refrigerator
iii. 1No. Ac Split unit
iv. 3Nos stabilizer 3000 wts
v. 2Nos of steel cabinet
vi. 1No. Safe |
1319 |
0 |
0 |
0 |
0 |
591,500 |
0 |
0 |
591,500 |
|
11013001/ 23010115/ 13000003 |
Purchase of computer machine
i. 2Nos of computer set
ii. 2Nos UPS
iii. 2Nos of Laptop |
1319 |
0 |
0 |
0 |
0 |
351,000 |
0 |
0 |
351,000 |
|
11013001/ 23010115/ 13000004 |
Purchase of 2Nos of Computer printers |
1319 |
0 |
0 |
0 |
0 |
65,000 |
0 |
0 |
65,000 |
|
11013001/ 23010115/ 13000005 |
Purchase of 1No. Photocopying machine. |
1319 |
0 |
0 |
0 |
0 |
292,500 |
0 |
0 |
292,500 |
|
11013001/ 23010106/ 13000006 |
Purchase of 1No. Toyota Hilux Vehicle |
1319 |
0 |
0 |
0 |
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
SUB-TOTAL |
0 |
0 |
0 |
0 |
13,055,000 |
0 |
0 |
13,055,000 |
|
TOTAL CAPITAL EXPENDITURE SSG'S OFFICE |
40,785,000
|
0 |
100,000,000
|
1,200,000,000 |
1,823,299,500 |
1,000,000 |
0 |
1,824,299,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE SPECIAL ASSISTANT ON SPECIAL PROJECTS |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11013001 |
OFFICE OF THE SPECIAL ASSISTANT ON SPECIAL PROJECTS |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11013001/ 23010115/ 13000001 |
500 Hectare pineapple plantation in Ebonyi North Zone. |
1319 |
0 |
0 |
0 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
11013001/ 23010115/ 13000002 |
Provision of Irrigation facility (Ebonyi North Zone) |
1319 |
0 |
0 |
0 |
0 |
8,125,000 |
0 |
0 |
8,125,000 |
|
11013001/ 23010115/ 13000003 |
Construction of farm house/ storage at the zone. |
1320 |
0 |
0 |
0 |
0 |
3,250,000 |
0 |
0 |
3,250,000 |
|
11013001/ 23010115/ 13000004 |
Perimeter fencing with wire guards, gate and gate house (Ebonyi North Zone) |
1320 |
0 |
0 |
0 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
11013001/ 23010115/ 13000005 |
500 Hectare pineapple plantation in Ebonyi Central Zone. |
1321 |
0 |
0 |
0 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
11013001/ 23010115/ 13000006 |
Provision of Irrigation facility (Ebonyi central Zone) |
1321 |
0 |
0 |
0 |
0 |
8,125,000 |
0 |
0 |
8,125,000 |
|
11013001/ 23010115/ 13000007 |
Farm house/storage (Ebonyi Central) |
1322 |
0 |
0 |
0 |
0 |
3,250,000 |
0 |
0 |
3,250,000 |
|
11013001/ 23010115/ 13000008 |
Perimeter fencing with wire guards, gate and gate house (Ebonyi Central). |
1322 |
0 |
0 |
0 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
11013001/ 23010115/ 13000009 |
500 Hectare pineapple plantation in Ebonyi South Zone |
1322 |
0 |
0 |
0 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
11013001/ 23010115/ 13000010 |
Provision of Irrigation facility (Ebonyi South zone) |
1323 |
0 |
0 |
0 |
0 |
8,125,000 |
0 |
0 |
8,125,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
76,375,000 |
0 |
0 |
76,375,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE SPECIAL ASSISTANT ON SPECIAL PROJECTS |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11013001 |
OFFICE OF THE SPECIAL ASSISTANT ON SPECIAL PROJECTS |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11013001/ 23010115/ 13000011 |
1 Unit farm house/storage (Ebonyi South) |
1319 |
0 |
0 |
0 |
0 |
3,250,000 |
0 |
0 |
3,250,000 |
|
11013001/ 23010115/ 13000022 |
Perimeter fencing with wire guards, gate and gate house (Ebonyi South) |
1319 |
0 |
0 |
0 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
11013001/ 23010115/ 13000013 |
Procurement of 1No. Hilux pick up truck |
1320 |
0 |
0 |
0 |
0 |
9,750,000 |
0 |
0 |
9,750,000 |
|
11013001/ 23010115/ 13000014 |
PROVISION OF OFFICE EQUIPMENT |
|
|
|
|
|
|
|
|
|
|
11013001/ 23010115/ 13000015 |
Procurement of 1 set of upholstered chairs |
1321 |
0 |
0 |
0 |
0 |
195,000 |
0 |
0 |
195,000 |
|
11013001/ 23010115/ 13000016 |
Purchase of 1No. Refrigerator |
1321 |
0 |
0 |
0 |
0 |
65,000 |
0 |
0 |
65,000 |
|
11013001/ 23010115/ 13000017 |
Purchase of 1No. Executive table |
1322 |
0 |
0 |
0 |
0 |
97,500 |
0 |
0 |
97,500 |
|
11013001/ 23010115/ 13000018 |
Purchase of 1No. Swivel chair |
1322 |
0 |
0 |
0 |
0 |
45,500 |
0 |
0 |
45,500 |
|
11013001/ 23010115/ 13000019 |
Purchase of 2No. Visitor's chair |
1322 |
0 |
0 |
0 |
0 |
52,000 |
0 |
0 |
52,000 |
|
11013001/ 23010115/ 13000020 |
Purchase of 2No. Table for general office |
1323 |
0 |
0 |
0 |
0 |
52,000 |
0 |
0 |
52,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
26,507,000 |
0 |
|
26,507,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE SPECIAL ASSISTANT ON SPECIAL PROJECTS |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11013001 |
OFFICE OF THE SPECIAL ASSISTANT ON SPECIAL PROJECTS |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11013001/ 23010115/ 13000021 |
Purchase of 2No. Air conditioner (shet unit) |
1319 |
0 |
0 |
0 |
0 |
19,500 |
0 |
0 |
19,500 |
|
11013001/ 23010115/ 13000022 |
3Nos Steel cabinet |
1319 |
0 |
0 |
0 |
0 |
97,500 |
0 |
0 |
97,500 |
|
11013001/ 23010115/ 13000023 |
3Nos ceiling fan |
1320 |
0 |
0 |
0 |
0 |
19,500 |
0 |
0 |
19,500 |
|
11013001/ 23010115/ 13000024 |
2No. Desk top calculator |
1320 |
0 |
0 |
0 |
0 |
9,750 |
0 |
0 |
9,750 |
|
11013001/ 23010115/ 13000025 |
6Nos arm chairs |
1321 |
0 |
0 |
0 |
0 |
26,000 |
0 |
0 |
26,000 |
|
11013001/ 23010115/ 13000026 |
2No. Wall clock |
1321 |
0 |
0 |
0 |
0 |
3,900 |
0 |
0 |
3,900 |
|
11013001/ 23010115/ 13000027 |
2No. Radio set |
1322 |
0 |
0 |
0 |
0 |
1,950 |
0 |
0 |
1,950 |
|
11013001/ 23010115/ 13000028 |
1 set of computer printers and accessories |
1322 |
0 |
0 |
0 |
0 |
2,600 |
0 |
0 |
2,600 |
|
11013001/ 23010115/ 13000029 |
2Nos. Photocopier |
1322 |
0 |
0 |
0 |
0 |
3,900 |
0 |
0 |
3,900 |
|
11013001/ 23010115/ 13000030 |
3Nos stabilizers |
1323 |
0 |
0 |
0 |
0 |
1,950 |
0 |
0 |
1,950 |
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
186,550 |
0 |
0 |
186,550 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE SPECIAL ASSISTANT ON SPECIAL PROJECTS |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11013001 |
OFFICE OF THE SPECIAL ASSISTANT ON SPECIAL PROJECTS |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11013001/ 23010115/ 13000031 |
50 Hectare tomato plantation |
1319 |
0 |
0 |
0 |
0 |
9,750,000 |
0 |
0 |
9,750,000 |
|
11013001/ 23010115/ 13000032 |
Provision of irrigation facility |
1319 |
0 |
0 |
0 |
0 |
3,900,000 |
0 |
0 |
3,900,000 |
|
11013001/ 23010115/ 13000033 |
Fencing with wire guards, gate and gate house |
1320 |
0 |
0 |
0 |
0 |
3,250,000 |
0 |
0 |
3,250,000 |
|
11013001/ 23010115/ 13000034 |
100 Hectare Cashew plantation |
1320 |
0 |
0 |
0 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
11013001/ 23010115/ 13000035 |
Fencing with wire guards, gate and gate house |
1321 |
0 |
0 |
0 |
0 |
1,950,000 |
0 |
0 |
1,950,000 |
|
11013001/ 23010115/ 13000036 |
Provision of irrigation facility |
1321 |
0 |
0 |
0 |
0 |
6,857,500 |
0 |
0 |
6,857,500 |
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
38,707,500 |
0 |
0 |
38,707,500 |
|
TOTAL CAPITAL EXPENDITURE OFFICE OF THE SAS ON SPECIAL PROJECTS |
0 |
0 |
0 |
0 |
141,776,050 |
0 |
0 |
141,776,050 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE SENIOR SPECIAL ASST. TO THE GOVERNOR ON INTERNAL SECURITY |
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11013001 |
OFFICE OF THE SENIOR SPECIAL ASST. TO THE GOVERNOR ON INTERNAL SECURITY |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11013001/ 23010115/ 13000001 |
Smart City Project Phase I (Safe Abakaliki. Security for Capital City. |
1319 |
0 |
0 |
0 |
0 |
600,000,000 |
0 |
0 |
600,000,000 |
|
TOTAL CAPITAL EXPENDITURE OFFICE OF THE SSA TO THE GOVERNOR ON INTERNAL SECURITY |
0 |
0 |
0 |
0 |
600,000,000 |
0 |
0 |
600,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF ECONOMIC EMPOWERMENT AND JOB CREATION |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11020001 |
MINISTRY OF ECONOMIC EMPOWERMENT AND JOB CREATION |
|
|
|
|
|
|
|
|
POVERTY ALLEVIATION |
|
|
|
|
|
|
|
|
|
|
11020001/
23020113/ 03000001 |
Empowerment of 1000 Ebonyians hawking in major cities of the Country @ N250,000
each |
1301 |
0 |
0 |
0 |
0 |
162,500,000 |
0 |
0 |
162,500,000 |
|
11020001/
23020113/ 03000002 |
Micro Credit Scheme:
Empowering Ebonyians through Micro Credit Loans from the Micro Credit Scheme
for:
i. Small Scale Entrepreneur
ii. Farming
iii.Artisans etc. |
1301 |
30,000,000 |
149,740,000 |
50,000,000 |
0 |
39,000,000 |
30,000,000 |
20,000,000 |
89,000,000 |
|
11020001/
23020113/ 03000003 |
Re-activation of seven catfish ponds in the State. |
1301 |
0 |
0 |
50,000,000 |
0 |
32,500,000 |
0 |
0 |
32,500,000 |
|
11020001/
23010106/ 03000004 |
Purchase of 1No. Toyota Hilux Van. |
1301 |
0 |
0 |
8,000,000 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
11020001/
23010108/ 03000005 |
Purchase of 1No. 18 seater Toyota Bus. |
1301 |
0 |
0 |
8,000,000 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
11020001/
23020113/ 03000006 |
Purchase of Agricultural machines like
(i) Purchase of palm oil/kernel extractor
(ii) Purchase of 15Nos. Garri Processing Machines all to be shared across the
three Senatorial zones |
1301 |
0 |
0 |
33,000,000 |
0 |
39,000,000 |
20,000,000 |
20,000,000 |
79,000,000 |
|
|
SUB-TOTAL |
|
30,000,000 |
149,740,000 |
149,740,000 |
0 |
303,000,000 |
50,000,000 |
20,000,000 |
393,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF ECONOMIC EMPOWERMENT AND JOB CREATION |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11012001 |
MINISTRY OF ECONOMIC EMPOWERMENT AND JOB CREATION |
|
|
|
|
|
|
|
11020001/
23020113/ 03000007 |
FGN Cash transfer programme |
1301 |
0 |
0 |
0 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
11020001/
23020113/ 03000008 |
Sponsoring of CBN Entrepreneur Programme |
1301 |
0 |
0 |
0 |
0 |
2,275,000 |
0 |
0 |
2,275,000 |
|
11020001/
23010129/ 03000009 |
Re-activiation of Community Empowerment Scheme/skill acquisition centres and
fish ponds in each of the three senatorial zones.
b. Training of Ebonyians in different skills |
1301 |
0 |
0 |
30,000,000 |
0 |
32,500,000 |
10,000,000 |
10,000,000 |
42,500,000 |
|
11020001/
23050101/
03000010 |
YouWin Programme for Youth Empowerment. |
1301 |
0 |
0 |
200,000,000 |
1,000,000 |
650,000,000 |
0 |
0 |
650,000,000 |
|
11020001/
23050101/
03000011 |
State Government Economic Empowerment of Ebonyi Women and Youths (3000
beneficiaries @ N250,000 each) |
1301 |
0 |
0 |
750,000,000 |
0 |
1,300,000,000 |
0 |
0 |
1,300,000,000 |
|
|
SUB-TOTAL |
1301 |
0 |
0 |
988,251,000 |
9,251,000 |
1,997,775,000 |
10,000,000
|
10,000,000 |
2,007,775,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF ECONOMIC EMPOWERMENT AND JOB CREATION |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11012001 |
MINISTRY OF ECONOMIC EMPOWERMENT AND JOB CREATION |
|
|
|
|
|
|
|
11020001/
23050101/
03000012 |
Training of 150 Ebonyiancs on skill actuision. 150 per senatorial zone.
i. Cost of settling the trainees 450 persons @ N300,000 each
ii. Payment of Trainers 36 persons @ N30,000 per month for 12 months.
Iii. Cost of materials
iv. Logistics/administrative cost. |
1301 |
0 |
0 |
0 |
0 |
87,750,000
8,424,000
1,950,000
3,250,000 |
50,000,000
10,000,000
1,000,000
2,000,000 |
0
0
0
0 |
137,750,000
18,242,000
10,950,000
5,250,000 |
|
11020001/
23050101/
03000013 |
Biometric Data Capture & Management System (electronic based) |
1301 |
0 |
0 |
0 |
0 |
2,275,000 |
0 |
0 |
2,275,000 |
|
11020001/
23050101/
03000014 |
Monitoring and Evaluation of Economic Empowerment programme. |
1301 |
0 |
0 |
0 |
0 |
3,250,000 |
2,000,000 |
0 |
5,250,000 |
|
11020001/
23050101/
03000015 |
Bottling/sachet water plants (5) @ N35m each |
1301 |
0 |
0 |
0 |
0 |
103,250,000 |
0 |
0 |
103,250,000 |
|
11020001/
23050101/
03000016 |
Block molding using local materials one for each senatorial Zone. |
1305 |
0 |
0 |
0 |
0 |
9,750,000 |
0 |
0 |
9,750,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
1,000,000 |
0 |
219,899,000 |
65,000,000 |
0 |
292,717,000 |
|
TOTAL CAPITAL EXPENDITURE MINISTRY OF ECONOMIC EMPOWERMENT AND JOB CREATION |
30,000,000 |
149,740,000 |
1,138,251,000 |
9,251,000 |
2,520,674,000 |
125,000,000 |
50,000,000 |
4,052,960,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
LIAISON OFFICE, LAGOS |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11021001 |
LIAISON OFFICE, LAGOS |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11021001/
23010106/
13000001 |
Purchase of 1No. Hilux Van |
1301 |
0 |
0 |
0 |
0 |
15,000,000 |
0 |
0 |
15,000,000
|
|
11021001/
23010108/
13000002 |
Purchase of 1No. 18 seater Bus and two other vehicles. |
1301 |
28,000,000 |
0 |
8,000,000 |
0 |
25,000,000 |
0 |
0 |
25,000,000
|
|
11021001/
23010112/
13000003 |
Purchase of office furniture and fittings |
1301 |
544,600 |
2,000,000 |
8,000,000 |
0 |
10,000,000 |
0 |
0 |
10,000,000
|
|
11021001/
23010119/
13000004 |
Purchase of 2No.Generator Set. (100KVA & 50KVA) |
1301 |
0 |
7,000,000 |
10,000,000 |
0 |
16,000,000 |
0 |
0 |
16,000,000
|
|
11021001/
23010120/
13000005 |
Purchase of kitchen Equipment
|
1301 |
0 |
1,500,000 |
5,000,000 |
0 |
6,000,000 |
0 |
0 |
6,000,000
|
|
11021001/
23010123/
13000006 |
Purchase of Fire fighting equipments (fire Extinghishers) |
1301 |
0 |
0 |
3,000,000 |
0 |
4,000,000 |
0 |
0 |
4,000,000
|
|
11021001/
23010139/
13000007 |
Purchase of office equipments 3 set of computer, 3No. UPS, stabilizer, etc.
|
1301 |
0 |
0 |
6,000,000 |
0 |
5,000,000 |
0 |
0 |
5,000,000
|
|
11021001/
23030101/
13000008 |
Rehabilitation of Office building:
i. Adjustment of Structural Pattern
ii. Re-roofing of building
iii.Changing of corrugated iron water pipes. PVC pipes etc.
iii. Repainting of building |
1301 |
0 |
0 |
20,000,000 |
0 |
69,000,000 |
0 |
0 |
69,000,000
|
|
TOTAL CAPITAL EXPENDITURE LIAISON OFFICE, LAGOS |
28,544,600 |
10,500,000 |
60,000,000
|
0 |
150,000,000 |
0 |
0 |
150,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
LIAISON OFFICE, ABUJA |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
|
LIAISON OFFICE, ABUJA |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11021002/
23030102/
13000001 |
Renovation of Lodge and Liaison Office Buildings at Maitama, Abuja
|
1301 |
0 |
0 |
0 |
0 |
100,000,000 |
0 |
0 |
100,000,000 |
|
11021002/
23020102/
13000002 |
Construction/provision of Residential buildings
i. Procurement of Land
ii. Processing and Registration
iii. Landscaping for the erection of bungalows.
|
1301 |
0 |
0 |
0 |
0 |
65,000,000 |
0 |
0 |
65,000,000 |
|
11021002/
23010121/
13000003 |
Purchase of Residential furniture for Governor's Lodge:
(i) Four (4) Sets of Executive
upholstery Chairs.
(ii) Four units of centre table
(iii) Sixteen units of side stools.
(iv) High quality curtains
(v) Five units of twin size beds and good
quality foams
etc. |
1301 |
1 |
0 |
10,000,000 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
11021002/
23010139/
13000004 |
Purchase of other Office Equipment
(i) 10units of TV sets.
(ii) 8 units of refridgerator
(iii) 4 units of Air Conditioners
(v) 5 units of Radio sets
(vi) 4 units ofsteel cabinet
etc. |
1301 |
0 |
0 |
0 |
0 |
3,250,000 |
0 |
0 |
3,250,000 |
|
11021002/
23010112/
13000005 |
Installation and reactivation of Intercom system in the Lodge and Office
buildings |
|
0 |
0 |
0 |
0 |
1,300,000 |
0 |
0 |
1,300,000 |
|
|
SUB-TOTAL |
|
|
|
10,000,000
|
-
|
182,550,000
|
0 |
0 |
182,550,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
LIAISON OFFICE, ABUJA |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
|
LIAISON OFFICE, ABUJA |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11021002/
23010112/
13000006 |
Rehabilitation/Repair of CCTV facilities and smoke detector in the lodge. |
1301 |
0 |
0 |
0 |
0 |
3,250,000 |
0 |
0 |
3,250,000 |
|
11021002/
23010108/
13000007 |
Purchase of Motor Vehicle
(i) One unit of suv Jeep
(ii) One unit of Toyota Camry Car
iii. One unit of eighteen seater Bus |
1301 |
21,000,000 |
0 |
21,000,000 |
0 |
32,500,000 |
0 |
0 |
32,500,000 |
|
11021002/
23010119/
13000008 |
Purchase of Power Generating set
(i) Purchase of one power generating
plant and installation cost. |
1301 |
7,000,000 |
0 |
7,000,000 |
0 |
5,200,000 |
0 |
0 |
5,200,000 |
|
11021002/
23030101/
13000009 |
Building of Abuja Liaison office and development of Abuja Lodge. |
1301 |
0 |
0 |
162,000,000 |
0 |
78,000,000
|
0 |
0 |
78,000,000
|
|
|
SUB-TOTAL |
|
28,000,000 |
0 |
190,000,000 |
0 |
118,950,000 |
0 |
0 |
118,950,000 |
|
TOTAL CAPITAL EXPENDITURE LIAISON OFFICE, ABUJA |
28,000,000 |
0 |
200,000,000 |
0 |
301,500,000 |
0 |
0 |
301,500,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
LIAISON OFFICE, ENUGU/ANAMBRA |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11021004 |
LIAISON OFFICE, ENUGU/ANAMBRA |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11021004/
23010139/
13000001 |
Purchase of Office Equipment |
1319 |
0 |
0 |
15,000,000 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
TOTAL CAPITAL EXPENDITURE LIAISON OFFICE ENUGU/ANAMBRA |
0 |
0 |
15,000,000 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
LIAISON OFFICE, ABA/PORT HARCOURT |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11021005 |
LIAISON OFFICE, ABA/PORT HARCOURT |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11021005/
23010139/
13000001 |
Purchase of Office Equipment |
1319 |
0 |
0 |
15,000,000 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
TOTAL CAPITAL EXPENDITURE LIAISON OFFICE ABA/PORT HARCOURT |
0 |
0 |
15,000,000 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
NORTHERN LIAISON OFFICE, KADUNA |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11021006 |
NORTHERN LIAISON OFFICE, KADUNA |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11021006/
23010139/
13000001 |
Purchase of Office Equipment |
1319 |
0 |
0 |
15,000,000 |
0 |
7,000,000 |
0 |
0 |
7,000,000 |
|
11021006/
23010112/
13000002 |
Purchase of Office Furniture |
1319 |
0 |
0 |
15,000,000 |
0 |
7,000,000 |
0 |
0 |
7,000,000 |
|
TOTAL CAPITAL EXPENDITURE NORTHERN LIAISON OFFICE, KADUNA |
0 |
0 |
30,000,000 |
0 |
14,000,000 |
0 |
0 |
14,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
LIASION OFFICE, OWERRI |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
. |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11021007 |
LIASION OFFICE, OWERRI |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11021007/
23010139/
13000001 |
Purchase of Office Equipment |
1319 |
0 |
0 |
0 |
0 |
5,500,000 |
0 |
0 |
5,500,000 |
|
TOTAL CAPITAL EXPENDITURE LIASION OFFICE OWERRI |
0 |
0 |
0 |
0 |
5,500,000 |
0 |
0 |
5,500,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF RELIGIOUS WELFARE |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11021007 |
OFFICE OF RELIGIOUS WELFARE |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11021006/
23010112/
13000002 |
Medical intervention to indegent citizens through religious bodies |
1319 |
0 |
0 |
0 |
0 |
500,000,000 |
0 |
0 |
500,000,000 |
|
TOTAL CAPITAL EXPENDITURE OFFICE OF RELIGIOUS WELFARE |
0 |
0 |
0 |
0 |
500,000,000 |
0 |
0 |
500,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE COMMUNITY AND SOCIAL DEV. AGENCY (EB-CSDA) |
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11012002 |
EBONYI STATE COMMUNITY AND SOCIAL DEV. AGENCY (EB-CSDA)
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
11020001/
23010118/
13000001
|
Counterpart Funding for the Agency. |
1301 |
200,000,000 |
25,000,000 |
100,000,000 |
25,000,000 |
65,000,000 |
65,000,000 |
65,000,000 |
195,000,000 |
|
TOTAL CAPITAL EXPENDITURE EBONYI STATE COMMUNITY AND SOCIAL DEV. AGENCY
(EB-CSDA) |
200,000,000 |
25,000,000 |
100,000,000 |
25,000,000 |
65,000,000 |
65,000,000 |
65,000,000 |
195,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
WOMEN DEVELOPMENT CENTRE |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11021003 |
WOMEN DEVELOPMENT CENTRE |
|
|
|
|
|
|
|
|
|
|
GENDER |
|
|
|
|
|
|
|
|
|
|
11021003/
23020118/
07000001 |
Construction of Hall, 2000 seats Capacity. |
713 |
0 |
0 |
50,000,000 |
0 |
30,000,000 |
0 |
10,000,000 |
40,000,000
|
|
11021003/
23020118/
07000002 |
Construction of Kitchen |
713 |
0 |
0 |
20,000,000 |
0 |
20,000,000 |
0 |
0 |
20,000,000
|
|
11021003/
23010106/
07000003 |
Purchase of 1No. Double Cabin Hilux Van |
713 |
0 |
0 |
0 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
11021003/
23010105/
07000004 |
Purchase of 1No.Toyota Corolla |
713 |
0 |
0 |
0 |
0 |
5,000,000 |
0 |
0 |
5,000,000 |
|
11021003/
23010119/
07000005 |
Purchase of 200KVA Electricity Generating Plant and installation of street
light. |
713 |
3,000,000 |
0 |
15,000,000 |
0 |
10,000,000 |
0 |
0 |
10,000,000
|
|
11021003/
23030118/
07000006 |
Renovation of WDC and Guest Houses |
713 |
0 |
0 |
20,000,000 |
0 |
20,000,000 |
0 |
0 |
20,000,000
|
|
TOTAL CAPITAL EXPENDITURE WOMEN DEVELOPMENT CENTRE |
3,000,000
|
0 |
105,000,000 |
|
100,000,000 |
0 |
10,000,000 |
110,000,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
SUSTAINABLE DEVELOPMENT GOALS (SDGs)/PROJECT SUPPORT UNIT (PSU) |
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL
2017 - 2019 |
|
|
11185001 |
SUSTAINABLE DEVELOPMENT GOALS (SDGs)/PROJECT SUPPORT UNIT (PSU) |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
|
|
11185001/ 23020118/ 13000001 |
2015 SDG State Water project. |
1301 |
10,000,000 |
0 |
2,000,000,000 |
0 |
971,920,000 |
0 |
0 |
971,920,000 |
|
11185001/ 23030101/ 13000002 |
Provision of Furniture |
1301 |
0 |
0 |
0 |
0 |
1,950,000 |
0 |
0 |
1,950,000 |
|
11185001/ 23010108/ 13000003 |
Purchase of 1No 18 seater Toyota bus for office use |
1301 |
0 |
0 |
0 |
0 |
8,800,000 |
0 |
0 |
8,800,000 |
|
11185001/ 23050103/ 13000004 |
Monitoring and evaluation of SOGs/CGs projects |
1301 |
1,000,000 |
0 |
1,000,000 |
0 |
650,000 |
0 |
0 |
650,000 |
|
11185001/ 23010113/ 13000005 |
Procurement of Office equipment:
i. 4No Laptops
ii. Camcorder
iii. Desk top computer |
1301 |
0 |
0 |
0 |
0 |
552,500 |
850,000 |
0 |
1,402,500 |
|
TOTAL CAPITAL EXPENDITURE, SUSTAINABLE DEVELOPMENT GOALS (SDGS)/(PROJECT SUPPORT
UNIT (PSU) |
11,000,000 |
0 |
2,001,000,000 |
0 |
983,872,500 |
850,000 |
0 |
984,722,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
DEPARTMENT OF INTER-PARTY AFFAIR |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11187001 |
DEPARTMENT OF INTER-PARTY AFFAIR
REFORM OF GOVERNMENT AND GOVERNANCE |
|
11187001/
23010106/
13000001 |
Purchase of 1No. Hilux Van |
1301 |
0 |
0 |
8,000,000 |
0 |
12,000,000 |
0 |
0 |
12,000,000 |
|
11187001/
23010112/
13000002 |
Purchase of Office Furniture 2 sets of uphostry. |
1301 |
0 |
0 |
200,000 |
0 |
300,000 |
0 |
0 |
300,000 |
|
11187001/
23050104/
13000003 |
Grants and Supports to political parties |
1301 |
10,000,000 |
0 |
41,500,000 |
0 |
36,700,000 |
10,000,000 |
10,000,000 |
56,700,000 |
|
11187001/
23010115/
13000004 |
Purchase of 1No. Photocopying machine |
1301 |
0 |
0 |
150,000 |
0 |
500,000 |
0 |
0 |
500,000 |
|
11187001/
23010139/
13000005 |
Purchase of other office equipment
i. 1No. Refridgerator
ii. 2No TV sets and DSTV Installation. |
1301 |
0 |
0 |
200,000 |
0 |
500,000 |
0 |
0 |
500,000 |
|
TOTAL CAPITAL EXPENDITURE, INTER-PART AFFAIRS |
10,000,000 |
0 |
50,000,000 |
0 |
50,000,000 |
10,000,000.00
|
10,000,000.00
|
70,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
DIRECTORATE OF ATTITUDINAL CHANGE |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11188001 |
DIRECTORATE OF ATTITUDINAL CHANGE |
|
|
|
|
|
|
|
|
|
|
|
SOCIETAL RE-ORIENTATION |
|
|
|
|
|
|
|
|
|
|
11188001/
23010105/
02000001 |
Purchase of Utility Vehicles. 1No. Hiace Bus |
201 |
8,000,000 |
0 |
16,840,000 |
|
16,000,000 |
0 |
0 |
16,000,000 |
|
11188001/
23010113/
02000003 |
Purchase of Office Equipment/Computer
i. Purchase of 3Nos computer sets for the three (3) zonal offices
ii. Purchase of 1No Digital Video Camera
iii. 4Nos Steel Cabinet for head office and 6Nos for zonal office.
Iv. 2Nos Television (plasma) for head office, 6Nos for zonal offices.
v. 2Nos medium refrigerators for head office,6 Nos for zonal offices.
vi. Air conditioner (1.5HP) 6nos for head office, 12nos for zonal offices.
vii. 4nos Ceiling fans SMC for head office, 12nos for zonal offices. |
201 |
0 |
0 |
2,500,000 |
|
4,000,000 |
0 |
0 |
4,000,000 |
|
TOTAL CAPITAL EXPENDITURE DIRECTORATE OF ATTITUDINAL CHANGE |
8,000,000
|
|
19,340,000
|
|
20,000,000 |
|
|
20,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
DEPARTMENT OF TALENT DEVELOPMENT |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL
2017 - 2019 |
|
|
|
11189001 |
DEPARTMENT OF TALENT DEVELOPMENT |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
11189001/
23050101/
13000001 |
Data Collection |
201 |
0 |
0 |
0 |
0 |
500,000 |
0 |
0 |
500,000 |
|
11189001/
23050107/
13000002 |
Training |
201 |
0 |
0 |
0 |
0 |
5,000,000 |
0 |
0 |
5,000,000 |
|
11189001/
23050103/
13000003 |
Monitoring |
201 |
0 |
0 |
0 |
0 |
1,500,000 |
0 |
0 |
1,500,000 |
|
11189001/
23050110/
13000004 |
Evaluation |
201 |
0 |
0 |
0 |
0 |
1,000,000 |
0 |
0 |
1,000,000 |
|
11189001/
23050171/
13000005 |
Empowerment |
201 |
0 |
0 |
0 |
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
11189001/
23010139/
13000006 |
Procurement of equipment |
201 |
0 |
0 |
0 |
0 |
2,000,000 |
0 |
0 |
2,000,000 |
|
TOTAL CAPITAL EXPENDITURE DEPARTMENT OF TALENT DEVELOPMENT |
0 |
0 |
0 |
0 |
20,000,000 |
0 |
0 |
20,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE HOUSE OF ASSEMBLY |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
12003001 |
EBONYI STATE HOUSE OF ASSEMBLY |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
12004001/
23020102/
13000001 |
Construction of Speaker's Quarters. |
1301 |
40,000,000 |
12,000,000 |
30,000,000 |
0 |
50,000,000 |
0 |
0 |
50,000,000 |
|
12004001/
23010105/
13000002 |
Procurement of 1No Ambulance vehicle for emergency and field works |
1301 |
0.00 |
0 |
35,000,000 |
0 |
20,000,000 |
0 |
0 |
20,000,000 |
|
12004001/
23050102/
13000003 |
Design and launching of EBHA detailed and standard Website containing all the
activities of the House since inception. |
1301 |
0.00 |
0 |
1,750,000 |
0 |
3,000,000 |
0 |
0 |
3,000,000 |
|
12004001/
23010118/
13000004 |
Procurement of 3Nos outfit scanners object at the entrance of EBHA, Speaker's
office, Deputy Speaker and Clerk's office. |
1301 |
0.00 |
0 |
20,000,000 |
0 |
7,000,000 |
0 |
0 |
7,000,000 |
|
12004001/
23010112/
13000005 |
Purchase of office furniture and fitting for the newly constructed Admin/clinic
block. |
1301 |
20,000,000
|
0 |
20,000,000 |
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
12004001/
23010105/
13000006 |
Purchase of 1Nos of coaster buses for Staff and over sight function. |
1301 |
0.00 |
0 |
30,000,000 |
0 |
20,000,000 |
0 |
0 |
20,000,000 |
|
12004001/
23010122/
13000007 |
Procurement of Drugs for House of Assembly Clinic |
1301 |
0 |
0 |
5,000,000 |
0 |
5,000,000 |
5,000,000 |
0 |
10,000,000 |
|
12004001/
23020118/
13000008 |
Construction of 24Hrs Security Light in EBHA Complex |
1302 |
0 |
0 |
5,000,000 |
0 |
10,000,000 |
5,000,000 |
0 |
15,000,000 |
|
12004001/
23010112/
13000009 |
Provision of furniture and fittings for the newly reconstructed legislative
chambers |
1306 |
0 |
0 |
0 |
0 |
30,000,000 |
0 |
0 |
30,000,000 |
|
|
SUB-TOTAL |
|
20,000,000
|
0 |
146,750,000 |
0 |
155,000,000 |
0 |
0 |
165,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE HOUSE OF ASSEMBLY |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
12003001 |
EBONYI STATE HOUSE OF ASSEMBLY |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
12004001/
23020101/
13000010 |
Purchase of power generating set for speaker's quarters |
1301 |
0.00 |
0.00 |
0.00 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
12004001/
23020101/
13000011 |
Purchase of 2No. 18 seater Buses, 1No. For speakers media/protocol and 1No. For
committee work |
1302 |
0.00 |
0.00 |
0.00 |
0 |
30,000,000 |
0 |
0 |
30,000,000 |
|
|
SUB-TOTAL |
|
0.00 |
0.00 |
0.00 |
0 |
45,000,000 |
0 |
0 |
45,000,000 |
|
TOTAL CAPITAL EXPENDITURE EBONYI HOUSE OF ASSEMBLY |
0.00 |
0.00 |
0.00 |
0 |
200,000,000 |
0 |
0 |
200,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE HOUSE OF ASSEMBLY SERVICE COMMISSION |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
12004001 |
EBONYI STATE HOUSE OF ASSEMBLY SERVICE COMMISSION |
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
12004001/
23030101/
13000001 |
Rehabilitation and repair of EBHASC building |
1301 |
0.00 |
0.00 |
0.00 |
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
12004001/
23020101/
13000002 |
Purchase of furnitures and fittings such as cushions, chairs tables, curtain
etc. |
1301 |
0.00 |
0.00 |
0.00 |
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
12004001/
23020101/
13000003 |
Purchase of 6No computer sets |
1301 |
0.00 |
0.00 |
0.00 |
0 |
1,000,000 |
0 |
0 |
1,000,000 |
|
12004001/
23020101/
13000004 |
Purchase of 6No Computer Printers |
1301 |
0.00 |
0.00 |
0.00 |
0 |
1,000,000 |
0 |
0 |
1,000,000 |
|
12004001/
23010115/
13000005 |
Purchase of 3No. Photocopying machines |
1301 |
0.00 |
0.00 |
0.00 |
0 |
1,500,000 |
0 |
0 |
1,500,000 |
|
12004001/
23020101/
13000006 |
Purchase of 3No.typewriter for Office use. |
1301 |
0.00 |
0.00 |
0.00 |
0 |
500,000 |
0 |
0 |
500,000 |
|
12004001/
23020101/
13000007 |
Purchase of other office equipment such as 10 Refriderators, 10Nos AC split
unit, 10No Television sets, 5Nos Video camera, 1No Sunny digital recorder, 7Nos
stabilizers and 5 steel cabinet files, 2Radio recorder. |
1301 |
0.00 |
0.00 |
0.00 |
0 |
8,000,000 |
0 |
0 |
8,000,000 |
|
|
SUB-TOTAL |
|
0.00 |
0.00 |
0.00 |
|
32,000,000 |
0 |
0 |
32,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE HOUSE OF ASSEMBLY SERVICE COMMISSION |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
12004001 |
EBONYI STATE HOUSE OF ASSEMBLY SERVICE COMMISSION |
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
12004001/
23020101/
13000008 |
Purchase of 1no. Hilux Van for operational works in EBHASC |
1301 |
0.00 |
0.00 |
0.00 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
12004001/
23020101/
13000009 |
Purchase of fire extinguishers |
1301 |
0.00 |
0.00 |
0.00 |
0 |
1,000,000 |
0 |
0 |
1,000,000 |
|
12004001/
23020101/
13000010 |
Purchase of quarterly operational manuals |
1301 |
0.00 |
0.00 |
0.00 |
0 |
1,000,000 |
0 |
0 |
1,000,000 |
|
12004001/
23020101/
13000011 |
Construction of EBHA Chapel |
1301 |
0.00 |
0.00 |
0.00 |
0 |
30,000,000 |
0 |
0 |
30,000,000 |
|
12004001/
23020101/
13000010 |
Establishment /provision of ICT infrastructure for both the Chairman,
Commissioners and ICT office of base in era |
1301 |
0.00 |
0.00 |
0.00 |
0 |
6,000,000 |
0 |
0 |
6,000,000 |
|
12004001/
23020101/
13000011 |
Purchase of 1No. Toyota Coasta Bus for EBHA Staff |
1301 |
0.00 |
0.00 |
0.00 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
|
SUB-TOTAL |
|
0.00 |
0.00 |
0.00 |
0 |
68,000,000 |
0 |
0 |
68,000,000 |
|
TOTAL CAPITAL EXPENDITURE EBONYI STATE HOUSE OF ASSEMBLY SERVICE COMMISSION |
0.00 |
0.00 |
0.00 |
0 |
100,000,000
|
0 |
0 |
100,000,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF INFORMATION AND STATE ORIENTATION |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
23001001 |
MINISTRY OF INFORMATION AND STATE ORIENTATION |
|
|
|
|
|
|
|
|
|
|
|
INFORMATION COMMUNICATION AND TECHNOLOGY |
|
|
|
|
|
|
|
|
|
|
23001001/
23020126/
11000001 |
Construction of 4No. Electronic Bill Boards at 6 strategic points in the State
Capital.
|
1101 |
30,000,000
|
30,000,000
|
30,000,000 |
34,650,000
|
35,125,000 |
0 |
0 |
35,125,000 |
|
23001001/
23010108/
11000002 |
Purchase of 1No. 18-Seater bus |
1101 |
0.00 |
0.00 |
8,000,000 |
0.00 |
15,000,000 |
0 |
0 |
15,000,000 |
|
23001001/
23010106/
11000003 |
Purchase of 1No. Hilux Vans. |
1101 |
8,000,000
|
8,000,000
|
24,000,000
|
0.00 |
12,000,000 |
0 |
0 |
12,000,000 |
|
23001001/
23010108/
11000004 |
Establishment of viewing Centers in the Cultural Centers in the 3 Zones:
i. Cinemas
ii. TV Sets 13No. |
1101 |
0.00 |
0.00 |
0.00 |
0.00 |
4,500,000
|
0 |
0 |
4,500,000
|
|
23001001/
23010125/
11000005 |
Establishment of Library Non-Linear Editing Suite. |
1101 |
0.00 |
0.00 |
5,000,000
|
0.00 |
3,250,000 |
0 |
0 |
3,250,000 |
|
23001001/
23020126/
11000006 |
Establishment of Information Technology and Archive units. |
1101 |
0 |
0 |
5,000,000
|
0.00 |
3,250,000 |
0 |
0 |
3,250,000 |
|
23001001/
23010139/
11000007 |
i. Purchase of 1No. Mini & 1No. Large Public Address equipment
ii. 2No. Video Cameras with tripods
iii. 2No. Still cameras with lens |
1101 |
0.00 |
0.00 |
3,000,000
|
0.00 |
3,250,000 |
0 |
0 |
3,250,000 |
|
23001001/
23010139/
11000008 |
Communication equipment for 13 LGA offices of Information officers. |
1101 |
0.00 |
0.00 |
6,500,000
|
0.00 |
4,225,000 |
0 |
0 |
4,225,000 |
|
|
SUB-TOTAL |
|
38,000,000
|
38,000,000
|
81,500,000
|
34,650,000
|
80,600,000 |
0 |
0 |
80,600,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF INFORMATION AND STATE ORIENTATION |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
23001001 |
MINISTRY OF INFORMATION AND STATE ORIENTATION |
|
|
|
|
|
|
|
|
INFORMATION COMMUNICATION AND TECHNOLOGY |
|
|
|
|
|
|
|
|
23001001/
23020126/
11000009 |
Creation of website for the Ministry. |
1101 |
0.00 |
0.00 |
2,000,000
|
2,000,000 |
1,200,000 |
0 |
0 |
1,200,000 |
|
23001001/
23050104/
11000010 |
Anniversaries/Celebrations during Democracy & Independence Day. |
1101 |
0.00 |
0.00 |
5,000,000
|
5,000,000 |
6,500,000 |
0 |
0 |
6,500,000 |
|
23001001/
23010113/
11000011 |
Purchase of computer sets. |
1101 |
0.00 |
0.00 |
5,000,000
|
5,000,000 |
6,500,000 |
0 |
0 |
6,500,000 |
|
23001001/
23050104/
11000012 |
Installation of 300KVA dedicated transformer & supply of light in the Cabinet
Office. |
1101 |
0.00 |
0.00 |
0 |
0 |
5,200,000 |
0 |
0 |
5,200,000 |
|
|
SUB-TOTAL |
|
0.00 |
0.00 |
280,500,000
|
205,000,000 |
19,400,000 |
0 |
0 |
19,400,000 |
|
TOTAL CAPITAL EXPENDITURE MINISTRY OF INFORMATION AND STATE ORIENTATION |
38,000,000
|
38,000,000
|
372,500,000
|
239,650,000
|
100,000,000 |
0 |
0 |
100,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI BROADCASTING COOPERATION (EBBC) |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
23003001 |
EBONYI BROADCASTING COOPERATION (EBBC) |
|
|
|
|
|
|
|
|
|
INFORMATION, COMMUNICATION AND TECHNOLOGY |
|
|
|
|
|
|
|
|
23003001/
23020118/
11000001 |
Construction of underground Diesel dump 33,000 litres Tank, for the two giant
plants. |
1101 |
0.00 |
0.00 |
4,000,000 |
0 |
4,000,000 |
0 |
0 |
4,000,000 |
|
23003001/
23020126/
11000002 |
Statutory payment to NBC for yearly renewal of license 2014 - 2017. |
1101 |
18,000,000
|
0.00 |
3,000,000 |
0 |
3,000,000 |
23,000,000 |
23,000,000 |
49,000,000 |
|
23003001/
23020104/
11000003 |
Completion of on-going building to accommodate additional EBBC Digital Studio
Equipment/ programs. |
1101 |
0.00 |
0.00 |
8,000,000
|
0 |
8,000,000 |
5,000,000 |
2,000,000 |
15,000,000 |
|
23003001/
23010129/
11000004 |
Purchase of Industrial (Broad casting) Equipment for the Digital Transition of
(EBBC) Salt TV. |
1101 |
279,500,000
|
0.00 |
152,400,000
|
0 |
120,000,000 |
0 |
0 |
120,000,000 |
|
23003001/
23040102/
11000005 |
Erosion and Flood control at the premises of EBBC |
1101 |
0.00 |
0.00 |
2,000,000 |
0 |
2,000,000 |
5,000,000 |
0 |
7,000,000 |
|
23003001/
23030118/
11000006 |
Construction/Provision of House to accommodate additional EBBC Digital Studio
Equipment/ programme. |
1101 |
0.00 |
0.00 |
0 |
0 |
2,000,000 |
0 |
0 |
2,000,000 |
|
23003001/
23030127/
11000007 |
Procurement of parts as contained in the agreement with Klosa and Staas. |
1101 |
0.00 |
0.00 |
18,600,000 |
0 |
15,000,000 |
1,000,000 |
1,000,000 |
17,000,000 |
|
23003001/
23010105/
11000008 |
Purchase of 7nos Toyota Corolla Cars for Directors. |
1101 |
0.00 |
0.00 |
31,000,000 |
0 |
31,400,000 |
0 |
0 |
31,400,000 |
|
|
SUB-TOTAL |
|
297,500,000
|
0.00 |
219,000,000
|
0 |
185,400,000
|
34,000,000
|
26,000,000
|
245,400,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI BROADCASTING COOPERATION (EBBC) |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
23003001 |
EBONYI BROADCASTING COOPERATION (EBBC) |
|
|
|
|
|
|
|
|
|
|
|
INFORMATION, COMMUNICATION AND TECHNOLOGY |
|
|
|
|
|
|
|
|
|
|
23003001/
23010106/
11000009 |
Purchase of one Hilux Van. |
1101 |
0.00 |
0.00 |
8,000,000 |
0 |
12,000,000 |
0 |
0 |
12,000,000 |
|
23003001/
23020118/
11000010 |
Installation of Thunder protection device. |
1101 |
0.00 |
0.00 |
10,000,000 |
11,500,000 |
1,300,000 |
0 |
0 |
1,300,000 |
|
23003001/
23020118/
11000011 |
Provision of renewable swasy for electricity. |
1101 |
0.00 |
0.00 |
0.00 |
0.00 |
1,300,000
|
0 |
0 |
1,300,000 |
|
|
SUB-TOTAL |
|
0.00 |
0.00 |
0.00 |
11,500,000 |
14,600,000 |
0 |
0 |
14,600,000 |
|
TOTAL CAPITAL EXPENDITURE, EBONYI BROADCASTING CORPORATION |
297,500,000 |
0 |
237,000,000 |
11,500,000 |
200,000,000 |
34,000,000 |
26,000,000 |
260,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
GOVERNMENT PRINTING AND STATIONERY DEPARTMENT |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
23013001 |
GOVERNMENT PRINTING AND STATIONERY DEPARTMENT |
|
|
|
|
|
|
|
|
INFORMATION, COMMUNICATION AND TECHNOLOGY |
|
|
|
|
|
|
|
|
23013001/
23020101/
11000001 |
Design, Construction and equipment of Government Printing Press and Stationary
Department of Abakaliki. |
1101 |
300,000,000
|
0.00 |
3,000,000
|
0 |
338,000,000 |
20,000,000 |
20,000,000 |
378,000,000 |
|
23013001/
23010108/
11000002 |
Purchase of Vehicles Hilux
|
1101 |
0.00 |
0.00 |
16,000,000
|
0 |
12,000,000 |
0 |
0 |
12,000,000 |
|
TOTAL CAPITAL EXPENDITURE, GOVERNMENT PRINTING AND STATIONERY DEPARTMENT |
0.00 |
0.00 |
19,000,000
|
0 |
350,000,000 |
0 |
0 |
390,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF SENIOR ASSISTANT TO GOVERNOR ON ICT |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
23013002 |
OFFICE OF SENIOR ASSISTANT TO GOVERNOR ON ICT |
|
|
|
|
|
|
|
|
|
|
|
INFORMATION, COMMUNICATION AND TECHNOLOGY |
|
|
|
|
|
|
|
|
23013002/
23030102/
11000001 |
Purchase of 1No. Toyota Hilux for ICT Field Operations. |
1101 |
0.00 |
0.00 |
0.00 |
0.00 |
15,000,000 |
0 |
0 |
15,000,000 |
|
23013002/
23030102/
11000002 |
Procurement of 150Nos HP Compaq Desktop Computers and Laptops for Govt.
Officials/EXCO members |
1101 |
0.00 |
0.00 |
0.00 |
0.00 |
0 |
0 |
0 |
0 |
|
23013002/
23030102/
11000003 |
Design/Deployment of Brand New Ebonyi State Websit/Multimedia facility
(E-Conferencing/Internet Facility) |
1101 |
0.00 |
0.00 |
0.00 |
0.00 |
25,000,000 |
0 |
0 |
25,000,000 |
|
23013002/
23030102/
11000004 |
Establishment of call Centre in government House for effective
communication/feed back between government and the public. |
1101 |
0.00 |
0.00 |
0.00 |
0.00 |
5,000,000 |
0 |
0 |
5,000,000 |
|
23013002/
23030102/
11000005 |
Procurement and deployment of ICT Research Centres in the 3 Senatorial Zones. |
1101 |
0.00 |
0.00 |
0.00 |
0.00 |
30,000,000 |
0 |
0 |
30,000,000 |
|
23013002/
23030102/
11000006 |
ICT Training for Ebonyi State Civil/Public Servants |
1101 |
0.00 |
0.00 |
0.00 |
0.00 |
0 |
0 |
0 |
0 |
|
23013002/
23030102/
11000007 |
Technology Department of tomorrow |
1101 |
0.00 |
0.00 |
0.00 |
0.00 |
25,000,000 |
0 |
0 |
25,000,000 |
|
23013002/
23030102/
11000008 |
ICT Electronic Health Care Data Dev. |
1101 |
0.00 |
0.00 |
0.00 |
0.00 |
0 |
0 |
0 |
0 |
|
23013002/
23030102/
11000009 |
Digital ID card for Access control in the State. |
1101 |
0.00 |
0.00 |
0.00 |
0.00 |
5,000,000 |
0 |
0 |
5,000,000 |
|
SUB-TOTAL |
0.00 |
0.00 |
0.00 |
0.00 |
105,000,000 |
0 |
0 |
105,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF SENIOR ASSISTANT TO GOVERNOR ON ICT |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
23013002 |
OFFICE OF SENIOR ASSISTANT TO GOVERNOR ON ICT |
|
|
|
|
|
|
|
|
|
|
|
INFORMATION, COMMUNICATION AND TECHNOLOGY |
|
|
|
|
|
|
|
|
23013002/
23030102/
11000010 |
Time and attendance machine procurement/expansion. |
1101 |
0.00 |
0.00 |
0.00 |
0.00 |
10,000,000 |
0 |
0 |
10,000,000 |
|
23013002/
23030102/
11000011 |
Procurement of office furniture |
1101 |
0.00 |
0.00 |
0.00 |
0.00 |
5,000,000 |
0 |
0 |
5,000,000 |
|
23013002/
23030102/
1100002 |
Procurement of office equipment |
1101 |
0.00 |
0.00 |
0.00 |
0.00 |
10,000,000 |
0 |
0 |
10,000,000 |
|
23013002/
23030102/
1100003 |
Warehousing the enumeration data for Ebonyi State Government in the cloud. |
1101 |
0.00 |
0.00 |
0.00 |
0.00 |
20,000,000 |
0 |
0 |
20,000,000 |
|
|
SUB-TOTAL |
|
0.00 |
0.00 |
0.00 |
0.00 |
45,000,000 |
0 |
0 |
45,000,000 |
|
TOTAL CAPITAL EXPENDITURE OFFICE OF SA TO
GOVERNOR ON ICT |
0.00 |
0.00 |
0.00 |
0.00 |
150,000,000 |
0 |
0 |
150,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
|
|
|
|
|
|
|
|
|
|
|
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE NEWSPAPER AND PUBLISHING CORPORATION |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
23055001 |
EBONYI STATE NEWSPATER AND PUBLISHING CORPORATION |
|
|
|
|
|
|
|
|
INFORMATION, COMMUNICATION AND TECHNOLOGY |
|
|
|
|
|
|
|
|
23055001/
23010113/
11000001 |
Purchase of 5No.Computer set. |
1100 |
100,000 |
0 |
0 |
4,325,000 |
325,000 |
1,000,000 |
1,000,000 |
2,325,000 |
|
23055001/
23010108/
11000002 |
Purchase of 2No. Hilux Van |
1100 |
8,000,000 |
0 |
0 |
15,000,000 |
15,000,000 |
0 |
0 |
15,000,000 |
|
23055001/
23010119/
11000003 |
Purchase of Power Generating Set 60KVA |
1100 |
300,000 |
0 |
0 |
3,900,000 |
3,900,000 |
0 |
0 |
3,900,000 |
|
23055001/
23030101/
11000004 |
Rehabilitation of Office Building. |
1100 |
5,000,000 |
0 |
0 |
3,200,000 |
3,200,000 |
0 |
0 |
3,200,000 |
|
23055001/
23010114/
11000005 |
Purchase of 2No. Printer. |
1100 |
100,000 |
0 |
0 |
130,000 |
130,000 |
0 |
0 |
130,000 |
|
23055001/
23020118/
11000006 |
Construction of Security Fence. |
1100 |
5,000,000 |
0 |
0 |
19,950,000 |
1,950,000 |
7,000,000 |
2,000,000 |
10,950,000 |
|
TOTAL CAPITAL EXPENDITURE - EBONYI STATE NEWSPATER & PUBLISHING COR. |
18,500,000 |
0 |
0 |
46,505,000 |
24,505,000 |
8,000,000 |
3,000,000 |
35,505,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE HEAD OF SERVICE |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
25001001 |
OFFICE OF THE HEAD OF SERVICE |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
25001001/
23030101/
13000001 |
Renovation of Staff Development Centre (SDC) Complex (reroofing, painting and
rewiring) |
1301 |
0 |
0 |
20,000,000 |
0 |
6,500,000 |
10,000,000 |
20,000,000 |
36,500,000 |
|
25001001/
23010139/
13000002 |
Purchase of 2 Nos lamination machine for the office of the Head of Service. |
1301 |
1,000,000 |
0 |
500,000 |
0 |
650,000 |
1,000,000 |
1,000,000 |
2,650,000 |
|
25001001/
23010106/
13000003 |
Installation of Personnel Data Bank/Internet Power Point Projector at the Office
of the HOS. |
1301 |
0 |
0 |
5,000,000 |
0 |
3,250,000 |
5,000,000 |
0 |
8,250,000 |
|
25001001/
23010128/
13000004 |
Purchase of 66 Nos security Biometric capturing machines |
1301 |
13,200,000 |
0 |
10,000,000 |
0 |
9,750,000 |
15,000,000 |
5,000,000 |
29,750,000 |
|
25001001/
23050101/
13000005 |
Printing of Establishment documents e.g Gen. 35, 69 etc |
1301 |
10,000,000 |
0 |
5,000,000 |
0 |
3,250,000 |
5,000,000 |
4,000,000 |
12,250,000 |
|
25001001/
23010112/
13000006 |
Purchase of office furniture and equipment for the entire centenary city |
1301 |
100,000,000 |
0 |
200,000,000 |
0 |
195,000,000 |
300,000,000 |
200,000,000 |
695,000,000 |
|
25001001/
23010123/
13000007 |
Purchase of 2000 Nos fire extinguishers
for the centenary city |
1301 |
5,000,000 |
0 |
20,000,000 |
0 |
3,250,000 |
15,000,000 |
25,000,000 |
43,250,000 |
|
|
SUB-TOTAL |
|
129,200,000 |
0 |
260,500,000 |
0 |
221,650,000 |
351,000,000 |
255,000,000 |
827,650,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE HEAD OF SERVICE |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
25001001 |
OFFICE OF THE HEAD OF SERVICE |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
25001001/
23010135/
13000008 |
Construction of 25 Nos. File Rack |
1301 |
0 |
0 |
0 |
0 |
975,000 |
1,500,000 |
1,000,000 |
3,475,000 |
|
25001001/
23010105/
13000009 |
Purchase of 1No. Hummer bus (utility vehicle) for the office of the HOS |
1301 |
0 |
0 |
0 |
0 |
21,500,000 |
10,000,000 |
5,000,000 |
36,500,000 |
|
25001001/ 23010122/ 13000010 |
Purchase of 300 Nos. Steel cabinet for the storage of files in Government MDAs. |
1301 |
0 |
0 |
0 |
0 |
32,500,000 |
50,000,000 |
80,000,000 |
162,500,000 |
|
25001001/
23010158/
13000011 |
Installation of security wires on the SDC fence |
1301 |
0 |
0 |
0 |
0 |
6,500,000 |
10,000,000 |
20,000,000 |
36,500,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
61,475,000 |
71,500,000 |
106,000,000 |
238,975,000 |
|
TOTAL CAPITAL EXPENDITURE OFFICE OF HEAD OF SERVICE |
|
|
|
|
283,125,000 |
437,500,000 |
371,000,000 |
1,091,625,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE AUDITOR GENERAL STATE |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
40001001 |
OFFICE OF THE AUDITOR GENERAL STATE |
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
40001001/
23050101/
13000001 |
Productionof curriculum for the Audit Research and Training Institute. |
1301 |
0 |
0 |
4,000,000 |
0 |
3,250,000 |
0 |
0 |
3,250,000 |
|
40001001/
23010106/
13000002 |
Purchase of 1Nos Hilux Vans. |
1301 |
0 |
0 |
0 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
40001001/
23010105/
13000003 |
Purchase of 1No. Toyota Corolla for the Auditor General |
1301 |
0 |
0 |
0 |
0 |
7,500,000 |
0 |
0 |
7,500,000 |
|
TOTAL CAPITAL EXPENDITURE OFFICE OF THE AUDITOR GENERAL STATE |
0 |
0 |
4,000,000 |
0 |
25,750,000 |
0 |
0 |
25,750,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE AUDITOR GENERAL LOCAL GOVERNMENT |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
40001002 |
OFFICE OF THE AUDITOR GENERAL LOCAL GOVERNMENT |
|
|
|
|
|
|
|
40001002/
23010139/
13000001 |
Purchase of Office Equipment |
1319 |
0 |
0 |
3,000,000 |
0 |
3,000,000
|
0 |
0 |
3,000,000 |
|
40001002/
23010104/
13000002 |
Purchase 1No, Tricycle |
1319 |
0 |
0 |
0 |
0 |
600,000 |
0 |
0 |
600,000 |
|
40001002/
23010119/
13000003 |
Purchase of 1No. 9KVA Plant |
1319 |
0 |
0 |
0 |
0 |
500,000 |
0 |
0 |
500,000 |
|
40001002/
23010139/
13000004 |
Purchase of IT Equipment |
1319 |
0 |
0 |
0 |
0 |
3,400,000 |
0 |
0 |
3,400,000 |
|
TOTAL CAPITAL EXPENDITURE, OFFICE OF THE AUDITOR GENERAL LOCAL GOVERNMENT |
0 |
0 |
3,000,000 |
0 |
7,500,000
|
0 |
0 |
7,500,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
CIVIL SERVICE COMMISSION |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
47001001 |
CIVIL SERVICE COMMISSION |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
47001001
23010105/
13000001 |
Purchase of monetized official motor vehicles (five) 5 units of Toyota Prado TX
V6/Toyota Camry 2.5) for the Chairman and members. |
1301 |
0.00 |
0.00 |
53,750,000
|
0 |
81,250,000 |
0 |
0 |
81,250,000 |
|
47001001
23050102/
13000002 |
Creation of Website/Automation of Ebonyi State Civil Servants' records for
effective handling of staff's matters. |
1301 |
23,000,000
|
0.00 |
35,000,000
|
0 |
3,250,000 |
15,000,000 |
0 |
18,250,000 |
|
47001001
23010106/
13000003 |
Purchase of 1No. Hilux Van. |
1301 |
0.00 |
0.00 |
7,600,000
|
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
47001001
23010119/
13000004 |
Purchase and installation of power generating set 100KVA perking in the
Commission |
1301 |
0.00 |
0.00 |
0.00 |
0 |
4,550,000 |
0 |
0 |
4,550,000 |
|
47001001
23010113/
13000005 |
Purchase of computers:
1. 15Nos Desktop Computers. |
1301 |
0.00 |
0.00 |
0.00 |
1,200,000 |
975,000 |
0 |
0 |
975,000 |
|
47001001
23010114/
13000006 |
Purchase of Computer Printers:
15Nos Computer printers |
1301 |
0.00 |
0.00 |
650,000
|
0 |
487,500 |
0 |
0 |
487,500 |
|
47001001
23010112/
13000007 |
Purchase of the Office furniture & fittings:
i. 15Nos computer tables
ii. 15Nos Executive tables/15Nos
Executive Chairs
iii. 15Nos semi Executive tables
iv. 15Nos Arm-back chairs
v. 15NosVisitors seats |
1301 |
5,000,000 |
0.00 |
0.00 |
3,000,000 |
1,950,000 |
3,000,000 |
0 |
4,950,000 |
|
TOTAL CAPITAL EXPENDITURE CIVIL SERVICE COMMISSION |
28,000,000 |
0.00 |
97,000,000 |
4,200,000 |
107,462,500 |
18,000,000 |
0 |
107,462,500
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
LOCAL GOVERNMENT SERVICE COMMISSION |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
47001002 |
LOCAL GOVERNMENT SERVICE COMMISSION |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
|
47001002/
23020126/
13000001 |
Construction of 3Nos ICT Centres at Zonal Headquarters of the 3 Zones of the
State. |
1319 |
0 |
0 |
10,000,000 |
0 |
7,800,000 |
18,000,000 |
10,000,000 |
35,800,000 |
|
TOTAL CAPITAL EXPENDITURE, LOCAL GOVERNMENT SERVICE COMM. |
0 |
0 |
10,000,000
|
0 |
7,800,000 |
18,000,000
|
10,000,000
|
35,800,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE INDEPENDENT ELECTORAL COMMISSION |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
48001001 |
EBONYI STATE INDEPENDENT ELECTORAL COMMISSION |
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
48001001/
23010104/
13000001 |
Purchase of 13No Motorcycles for Assistant Electoral Officers. |
1301 |
5,000,000 |
0 |
2,500,000 |
0 |
130,000 |
0 |
0 |
130,000 |
|
48001001/
23010105/
13000002 |
Purchase of 2No Toyota Hilux for Commissioners and Members in the Headquarters. |
1301 |
0 |
0 |
14,000,000 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
48001001/
23010106/
13000003 |
Purchase of 13No Pick-up Van for 13 LGAs |
1301 |
0 |
0 |
91,000,000 |
0 |
59,150,000 |
0 |
0 |
59,150,000 |
|
48001001/
23010115/
13000004 |
Purchase and supply of 3Nos Gestetner DSM photocoping machines with accessories. |
1301 |
0 |
0 |
1,000,000 |
0 |
1,950,000 |
0 |
0 |
1,950,000 |
|
48001001/
23010119/
13000005 |
Procurement of 13Nos. 5KVA & 8KVA Power Generating Set for 13 LGAs and one big
Generator for the Headquarter. |
1301 |
5,000,000 |
0 |
7,000,000 |
0 |
4,550,000 |
0 |
0 |
4,550,000 |
|
48001001/
23010139/
13000006 |
Purchase of 2,500 Ballot Boxes for Election |
1301 |
0 |
0 |
8,000,000 |
0 |
5,200,000 |
0 |
0 |
5,200,000 |
|
48001001/
23010112/
13000007 |
Purchase of 2,500 thumb printing tables for election wards. |
1301 |
0 |
0 |
12,500,000 |
0 |
8,125,000 |
0 |
0 |
8,125,000 |
|
48001001/
23030101/
13000008 |
Rehabilitation/Repair of 5No. EBSIEC Headquarter Office Blocks. |
1301 |
20,000,000 |
0 |
16,000,000 |
0 |
10,870,000 |
4,000,000 |
2,000,000 |
16,870,000 |
|
48001001/
23030101/
13000009 |
Expansion/Reconstruction of EBSIEC Central store, Abakaliki |
1301 |
10,000,000
|
0 |
10,000,000 |
0 |
7,800,000 |
3,000,000 |
2,000,000 |
12,800,000 |
|
|
SUB-TOTAL |
|
40,000,000
|
0 |
162,000,000
|
0 |
112,775,000
|
7,000,000
|
4,000,000
|
123,775,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
01 ADMINISTRATIVE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE INDEPENDENT ELECTORAL COMMISSION |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
48001001 |
EBONYI STATE INDEPENDENT ELECTORAL COMMISSION |
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
48001001/
23020101/
13000001 |
Reconstruction of Security House and Perimeter Fencing at EBSIEC Secretariat. |
1301 |
15,000,000
|
0 |
5,000,000 |
0 |
5,200,000 |
4,000,000 |
2,000,000 |
11,200,000 |
|
48001001/
23050102/
13000002 |
Provision of Internet Service at EBSIEC Headquarter, creation of website. |
1301 |
3,000,000 |
0 |
1,000,000 |
0 |
650,000 |
500,000 |
500,000 |
1,650,000 |
|
|
SUB-TOTAL |
|
57,500,000
|
0 |
6,000,000 |
0 |
5,850,000 |
4,500,000 |
2,500,000 |
12,850,000 |
|
TOTAL CAPITAL EXPENDITURE EBONYI STATE INDEPENDENT ELECTORAL COMMISSION |
97,500,000 |
0 |
168,000,000 |
0 |
118,625,000 |
11,500,000 |
6,500,000 |
136,625,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02: ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF AGRICULTURE AND NATURAL RESOURCES |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
|
ECONOMIC EMPOWERMENT THROUGH AGRICULTURE |
|
|
|
|
|
|
|
|
15001001/
23010140/
01000001 |
Procurement and distribution of Argo-inputs such as fertilizer, improved rice
seeds, maize. |
101 |
250,000,000 |
0 |
16,000,000 |
0 |
325,000,000 |
225,000,000 |
227,500,000 |
777,500,000 |
|
15001001/
23020118/
01000002 |
Construction of Market Garden perimeter fence |
101 |
2,000,000 |
0 |
1,000,000 |
0 |
1,300,000 |
2,200,000 |
2,220,000 |
5,720,000 |
|
15001001/
23010105/
01000003 |
Purchase of 1No Hilux van. or monitoring, and supervision of the departmental
projects at various sites |
105 |
0 |
0 |
16,000,000 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
15001001/
23060201/
01000004 |
Credit facility to Ebonyi State farmers |
103 |
0 |
0 |
30,000,000 |
0 |
19,500,000 |
33,000,000 |
33,300,000 |
85,800,000 |
|
15001001/
23010127/
01000005 |
Purchase of new tractors with implement
plough, harrow, tyre |
106 |
9,000,000 |
0 |
0 |
0 |
65,000,000 |
220,000,000 |
222,000,000 |
507,000,000 |
|
15001001/
23020123/
01000006 |
Purchase of land and construction of livestock market in Abakaliki LGA |
106 |
20,000,000 |
0 |
15,000,000 |
0 |
195,000,000 |
110,000,000 |
111,000,000 |
416,000,000 |
|
15001001/
23020123/
01000007 |
Construction of veterinary hospital and standard diagnostic laboratory at
abakaliki headquarter. |
106 |
10,000,000 |
0 |
10,000,000 |
0 |
13,000,000 |
15,950,000 |
17,545,000 |
46,495,000 |
|
15001001/
23020113/
01000008 |
Rehabilitation of veterinary school and veterinary investigation Centre at
Ezzangbo. |
105 |
20,000,000 |
0 |
10,000,000 |
0 |
13,000,000 |
22,000,000 |
22,200,000 |
57,200,000 |
|
15001001/
23050103/
01000009 |
Monitoring and evaluating projects in the Ministry |
105 |
1,000,000 |
0 |
1,000,000 |
0 |
1,950,000 |
2,200,000 |
2,220,000 |
6,370,000 |
|
15001001/
23010127/
01000010 |
Purchase of Agricultural Mobile pest control Equipment |
105 |
9,000,000 |
0 |
15,000,000 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
|
SUB-TOTAL |
|
321,000,000 |
0 |
115,000,000 |
0 |
655,250,000 |
630,350,000 |
637,985,000 |
1,923,585,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02: ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF AGRICULTURE AND NATURAL RESOURCES |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
15001001 |
MINISTRY OF AGRICULTURE AND NATURAL RESOURCES |
|
|
|
|
|
|
|
|
|
ECONOMIC EMPOWERMENT THROUGH AGRICULTURE |
|
|
|
|
|
|
|
|
15001001/
23020113/
01000011 |
Construction of state fish farm at the two senatorial zones (central & south) |
101 |
4,000,000 |
4,000,000 |
4,000,000 |
4,000,000 |
6,500,000 |
16,500,000 |
18,150,000 |
41,150,000 |
|
15001001/
23030113/
01000012 |
Rehabilitation of the pig multiplication units at Ezzamgbo and Afikpo |
101 |
0 |
0 |
0 |
0 |
6,500,000 |
45,100,000, |
49,610,000 |
104,710,000 |
|
15001001/
23020112/
01000013 |
Construction of 1No. office building and 1No. warehouse at Ezzillo farm |
106 |
0 |
0 |
0 |
0 |
6,500,000 |
0 |
6,000,000 |
12,500,000 |
|
15001001/
23030113/
01000014 |
Rehabilitation of Veterinary School and Veterinary investment Centre at
Ezzamgbo. |
106 |
|
|
|
|
13,000,000 |
0 |
0 |
13,000,000 |
|
15001001/
23020113/
01000015 |
Establishment of Diary farm |
101 |
0 |
0 |
0 |
0 |
325,000,000 |
0 |
302,500,000 |
627,500,000 |
|
15001001/
23030113/
01000016 |
Establishment of oil palm seedlings |
106 |
0 |
0 |
0 |
0 |
52,000,000 |
0 |
0 |
52,000,000 |
|
15001001/
23020113/
01000017 |
Uburu Irrigation Site (100 hectares) |
106 |
0 |
0 |
0 |
0 |
52,000,000 |
0 |
0 |
52,000,000 |
|
15001001/
23030113/
01000018 |
Construction of Irrigation facilities at Ndierupfu Dam Site Iboko (50 hectares) |
106 |
0 |
0 |
0 |
0 |
65,000,000 |
0 |
0 |
65,000,000 |
|
|
SUB-TOTAL |
|
4,000,000 |
4,000,000
|
4,000,000 |
4,000,000 |
526,500,000 |
16,500,000 |
376,260,000 |
967,860,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02: ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF AGRICULTURE AND NATURAL RESOURCES |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
|
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
15001001 |
MINISTRY OF AGRICULTURE AND NATURAL RESOURCES |
|
|
|
|
|
|
|
|
|
ECONOMIC EMPOWERMENT THROUGH AGRICULTURE |
|
|
|
|
|
|
|
|
15001001/
23030113/
01000019 |
Item Amagu Irrigation Site (2,500 hectares) |
106 |
0 |
0 |
0 |
0 |
1,300,000 |
247,500,000 |
272,500,000 |
521,300,000 |
|
15001001/
23020114/
01000020 |
Construction of Irrigation facilities at Ivo Dam site (2000 hectares) |
106 |
0 |
0 |
0 |
0 |
1,300,000 |
3,850,000 |
4,235,000 |
9,385,000 |
|
15001001/
23020106/
01000021 |
Ezillo Farm Irrigation Scheme (500 hectares) |
106 |
0 |
0 |
0 |
0 |
1,300,000 |
0 |
0 |
1,300,000 |
|
15001001/
23020118/
01000022 |
School Agric Programme for 3 Pilot Schools |
106 |
0 |
0 |
0 |
0 |
48,750,000 |
30,300,000 |
30,330,000 |
109,380,000 |
|
15001001/
23020118/
01000023 |
School Agric Programme for 28 additional schools |
106 |
0 |
0 |
0 |
0 |
48,750,000 |
24,000,000 |
26,620,000 |
99,370,000 |
|
15001001/
23050108/
01000024 |
Consultancy Services |
106 |
0 |
0 |
0 |
0 |
32,500,000 |
0 |
0 |
32,500,000
|
|
15001001/
23020112/
01000025 |
Procurement of 4No Complete set Parboiling Rice Plant |
106 |
0 |
0 |
0 |
0 |
4,241,250 |
0 |
0 |
4,241,250
|
|
15001001/
23020112/
01000026 |
Procurement of 3 Rice Mills |
106 |
0 |
0 |
0 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
15001001/
23020112/
01000027 |
Soil testing/analysis |
106 |
0 |
0 |
0 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
164,141,250 |
305,650,000 |
333,685,000 |
803,476,250 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02: ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF AGRICULTURE AND NATURAL RESOURCES |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
15001001 |
MINISTRY OF AGRICULTURE AND NATURAL RESOURCES |
|
|
|
|
|
|
|
|
|
|
|
ECONOMIC EMPOWERMENT THROUGH AGRICULTURE |
|
|
|
|
|
|
|
|
|
|
15001001/
23020118/
01000028 |
Land Development for farming |
106 |
0 |
0 |
0 |
0 |
65,000,000 |
0 |
0 |
65,000,000 |
|
15001001/
23030113/
01000029 |
Rehabilitation of Nkaliki Hatchery. |
105 |
0 |
0 |
0 |
0 |
1,000,000,000 |
2,200,000 |
2,220,000 |
1,004,420,000 |
|
15001001/
23010127/
01000030 |
IFAD VCDP Counterpart Fund |
104 |
0 |
0 |
0 |
0 |
100,000,000 |
0 |
0 |
100,000,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
1,165,000,000 |
2,200,000
|
2,220,000
|
1,169,420,000
|
|
TOTAL CAPITAL EXPENDITURE MINISTRY OF AGRICULTURE AND NATURAL RESOURCES |
|
|
|
|
2,510,891,250 |
999,800,000 |
1,350,150,000 |
4,860,841,250 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE AGRIC DEV. PROGRAMME |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
15102001 |
EBONYI STATE AGRIC DEV. PROGRAMME |
|
|
|
|
|
|
|
|
|
|
15102001/
23020113
01000001 |
Agric Market Development |
0106 |
10,000,000 |
|
11,000,000 |
|
13,065,000 |
20,100,000 |
20,100,000 |
53,265,000 |
|
15102001/
23030113
01000002 |
Small Holder Productivity Enhancement |
0101 |
26,000,000 |
|
4,210,000 |
|
29,900,000 |
46,000,000 |
46,000,000 |
121,900,000 |
|
15102001/
23050103
01000003 |
Programme Monitoring, Evaluation and Coordination |
0101 |
12,000,000 |
|
41,000,000 |
|
13,650,000 |
21,000,000 |
21,000,000 |
55,650,000 |
|
15102001/
23010104
01000004 |
Purchase of 120 Motorcycles for Extension Agents for field work. |
0106 |
0 |
0 |
18,000,000 |
0 |
12,870,000 |
0 |
0 |
12,870,000 |
|
15102001/
23010106
01000005 |
Purchase of 2Hilux vehicles for monitoring and supervision of projects |
0101 |
0 |
0 |
25,000,000 |
0 |
30,000,000 |
0 |
0 |
30,000,000 |
|
15102001/
23010140
01000006 |
Cost of acquiring Extension Technologies from Research Institutes and
Universities |
0101 |
5,000,000
|
|
9,490,000
|
0 |
6,786,000 |
11,480,000 |
12,630,000 |
30,896,000 |
|
15102001/
23020113
01000007 |
Construction of WIA Acquisition Complex at Headquarters. |
0106 |
0.00 |
|
7,600,000
|
0 |
5,434,000 |
9,200,000 |
10,120,000 |
24,754,000 |
|
15102001/
23030113
01000008 |
Construction of 3 Cassava Processing sheds at 3 zones (1 per zone) |
0101 |
0.00 |
0.00 |
2,800,000
|
0 |
2,002,000 |
3,390,000 |
3,730,000 |
9,122,000 |
|
15102001/
23010140
01000009 |
Purchase and equipment of WIA Skill Acquisition Complex at Hqtrs and 3 Zones. |
0101 |
0.00 |
0.00 |
3,300,000
|
0 |
2,359,500 |
3,990,000 |
4,390,000 |
10,739,500 |
|
|
SUB-TOTAL |
|
53,000,000
|
0 |
122,400,000 |
0 |
116,066,500 |
115,160,000 |
117,970,000 |
349,196,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE AGRIC DEV. PROGRAMME |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
15102001 |
EBONYI STATE AGRIC DEV. PROGRAMME |
|
|
|
|
|
|
|
|
15102001/
23010140
01000010 |
Purchase and distribution of Agro-Inputs such as fertilizers, improved Cassava
cuttings, Rice and Maize seeds, etc |
0106 |
29,600,000 |
0 |
97,000,000 |
0 |
69,286,100 |
99,028,000 |
78,160,000 |
283,780,000 |
|
15102001/
23010140/
01000011 |
Construction of 1 shed and 1 store for Agric. Machineries and Equipment at the
Hqtrs. |
0101 |
0 |
0 |
0 |
0 |
214,500 |
360,000 |
40,000 |
614,500 |
|
15102001/
23030113
01000012 |
Establishment of 30 Hectares of certified Rice seed farm |
0101 |
15,400,000 |
|
|
0 |
6,435,000 |
10,890,000 |
11,980,000 |
29,305,000 |
|
15102001/
23030113
01000013 |
Establishment of 30 hectares of improved Cassava seed farms |
0106 |
14,000,000 |
250,000 |
8,000,000 |
0 |
5,720,000 |
9,680,000 |
10,650,000 |
26,050,000 |
|
15102001/
23010140/
01000014 |
Conduct Agricultural Production Survey (APS) |
0101 |
600,000, |
0 |
750,000 |
0 |
539,500 |
910,000 |
1,000 |
1,450,500 |
|
15102001/
23010113
01000015 |
Purchase of 9 Agro-processing Machineries |
0101 |
2,600,000 |
0 |
7,200,000 |
0 |
14,040,000 |
21,600,000 |
21,600,000 |
57,240,000 |
|
15102001/
23020113
01000016 |
Purchase of 20 Survey Equipment including GPS. |
0106 |
1,400,000 |
0 |
1,000,000 |
0 |
1,950,000 |
3,000,000 |
3,000,000 |
7,950,000 |
|
15102001/
23050103/
01000017 |
Monitoring and Evaluation of EBADEP Projects |
0101 |
1,400,000
|
0.00 |
1,600,000
|
0 |
3,120,000 |
4,800,000 |
4,800,000 |
12,720,000 |
|
15102001/
23030113
01000018 |
Resurscitation of 18 farmers' Field schools |
0105 |
2,500,000 |
0 |
3,600,000 |
0 |
7,020,000 |
10,800,000 |
10,800,000 |
28,620,000 |
|
|
SUB-TOTAL |
|
67,000,000 |
250,000
|
115,586,000 |
0 |
108,325,100 |
161,068,000
|
141,031,000
|
468,753,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE AGRIC DEV. PROGRAMME |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
15102001 |
EBONYI STATE AGRIC DEV. PROGRAMME |
|
|
|
|
|
|
|
|
15102001/
23030113
01000019 |
Grant/support to National Programme for Food Security farmers for Animal and
Crop Intensification. |
0101 |
14,500,000 |
0 |
1,600,000 |
0 |
22,490,000 |
34,600,000 |
34,600,000 |
107,790,000 |
|
15102001/
23030113
01000020 |
Construction of EBADEP Perimeter Fencing |
0106 |
10,000,000 |
0 |
10,000,000 |
0 |
7,150,000 |
11,000,000 |
11,000,000 |
49,150,000 |
|
15102001/
23030113
01000021 |
Rehabilitation of 3 Agro-Service Centres (1 per Zone) |
0101 |
20,000,000 |
0 |
22,000,000 |
0 |
14,300,000 |
0 |
0 |
14,300,000 |
|
15102001/
23030113
01000022 |
Purchase of Equipment for Headquarters and 3 Zones such as Media Equipment,
Rainboots, Raincoats etc. |
0101 |
5,000,000 |
0 |
82,000,000 |
0 |
58,630,000 |
99,220,000 |
109,140,000 |
266,990,000 |
|
|
SUB-TOTAL |
|
49,500,000 |
|
115,600,000 |
0 |
102,570,000 |
144,820,000 |
154,740,000 |
457,360,000 |
|
TOTAL CAPITAL EXPENDITURE EBADEP |
170,000,000 |
250,000 |
353,586,000 |
0 |
326,961,600 |
421,741,000 |
413,741,000 |
1,162,443,600 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
THIRD NATIONAL FADAMA DEVELOPMENT PROJECT (NFDP III) |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
MINISTRY/DEPARTMENT/AGENCY: |
THIRD NATIONAL FADAMA DEVELOPMENT PROJECT (NFDP III) |
|
|
|
|
|
15102002 |
FADAMA |
|
|
|
|
|
|
|
|
|
|
|
ECONOMIC EMPOWERMENT THROUGH AGRICULTURE |
|
|
|
|
|
|
|
|
15102002/
23020113/
01000001 |
National FADAMA III International Development Association Funded Project, which
arms at promoting small scale irrigation and its downstream with the objective
of enhancing food security and income of FADAMA users.
1. Activities under Agriculture include:
-Agricultural Advisory and extension services for improved crops.
-Adaptation of post harvet technologies.
- Input support: Fertilizer, sprayers, cassava cuttings, agro chemicals, seeds
etc.
2. Asset Acquisition: Marching grants as
seed money to acquire income generating facilities:
- Rice Processing machines
- Cassava processing machine
- Cultivation of crops
- Small-scale community owned infrastructure. |
0106 |
56,000,000
|
83,173,547 |
36,000,000 |
0 |
50,000,000 |
0 |
0 |
50,000,000 |
|
TOTAL CAPITAL EXPENDITURE FADAMA III |
56,000,000
|
83,173,547
|
36,000,000
|
1 |
50,000,000 |
0 |
0 |
50,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI RICE WORLD |
|
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
15102003 |
EBONYI RICE WORLD |
|
|
|
|
|
|
|
|
|
|
15102003/
23010106
01000001 |
Procurement of 3Nos Operational Hilux Van
for the three Rice mills. |
|
0 |
0 |
0 |
0 |
15,000,000 |
4,500,000 |
4,500,000 |
24,000,000
|
|
|
SITE 1: IKWO MODERN RICE MILL ONUIGBOJI |
|
|
|
|
|
|
|
|
|
|
15102003/
23020118
01000002 |
Perimeter fencing of factory premises |
|
0 |
0 |
0 |
0 |
20,000,000 |
20,000,000 |
30,000,000 |
70,000,000
|
|
|
BUILDING OF STAFF QUARTERS |
|
|
|
|
|
|
|
|
|
|
15102003/
23020118
01000003 |
A. Five Bed room flat (5.5 x 29.7) Staff
quarters |
|
0 |
0 |
0 |
0 |
5,000,000 |
5,000,000 |
7,000,000 |
17,000,000
|
|
15102003/
23020118
01000004 |
B. Three Bedroom Flat (13.2 x 16.2) |
|
0 |
0 |
0 |
0 |
8,000,000 |
5,000,000 |
3,000,000 |
16,000,000
|
|
15102003/
23020118
01000005 |
C. Administrative Building |
|
0 |
0 |
0 |
0 |
10,000,000 |
15,000,000 |
5,000,000 |
30,000,000
|
|
15102003/
23020118
01000006 |
D. Weigh bridge Roofing |
|
0 |
0 |
0 |
0 |
3,000,000 |
1,000,000 |
2,000,000 |
6,000,000
|
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
61,000,000 |
50,500,000
|
51,500,000 |
163,000,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI RICE WORLD |
|
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
15102003 |
EBONYI RICE WORLD |
|
|
|
|
|
|
|
|
|
|
|
SITE 1: IBOKO MODERN RICE MILL IZZI |
|
|
|
|
|
|
|
|
|
|
15102003/
23020118
01000008 |
Perimeter fencing of factory premises |
|
0 |
0 |
0 |
0 |
20,000,000 |
20,000,000 |
30,000,000 |
70,000,000
|
|
|
BUILDING F STAFF QUARTERS |
|
|
|
|
|
|
|
|
|
|
15102003/
23020118
01000009 |
A. Five Bed room flat (5.5 x 29.7) Staff
quarters |
|
0 |
0 |
0 |
0 |
10,000,000 |
5,000,000 |
7,000,000 |
22,000,000
|
|
15102003/
23020118
01000010 |
B. Three Bedroom Flat (13.2 x 16.2) |
|
0 |
0 |
0 |
0 |
8,000,000 |
5,000,000 |
3,000,000 |
16,000,000
|
|
15102003/
23020118
01000011 |
C. Administrative Building |
|
0 |
0 |
0 |
0 |
20,000,000 |
15,000,000 |
5,000,000 |
40,000,000
|
|
15102003/
23020118
01000012 |
D. Weigh bridge Roofing |
|
0 |
0 |
0 |
0 |
3,000,000 |
1,000,000 |
2,000,000 |
6,000,000
|
|
|
SITE 3: OSO-EDDA MODERN RICE MILL, AFIKPO
SOUTH |
|
|
|
|
|
|
|
|
|
|
15102003/
23020118
01000014 |
Perimeter fencing of factory premises |
|
0 |
0 |
0 |
0 |
20,000,000 |
20,000,000 |
30,000,000 |
130,000,000
|
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
81,000,000
|
66,000,000
|
77,000,000
|
224,000,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI RICE WORLD |
|
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
15102003 |
EBONYI RICE WORLD |
|
|
|
|
|
|
|
|
|
|
|
BUILDING F STAFF QUARTERS |
|
|
|
|
|
|
|
|
|
|
15102003/
23020118
01000015 |
A. Five Bed room flat (5.5 x 29.7) Staff
quarters |
|
0 |
0 |
0 |
0 |
10,000,000 |
5,000,000 |
7,000,000 |
22,000,000
|
|
15102003/
23020118
01000016 |
B. Three Bedroom Flat (13.2 x 16.2) |
|
0 |
0 |
0 |
0 |
8,000,000 |
5,000,000 |
3,000,000 |
16,000,000
|
|
15102003/
23020118
01000017 |
C. Administrative Building |
|
0 |
0 |
0 |
0 |
20,000,000 |
15,000,000 |
5,000,000 |
40,000,000
|
|
15102003/
23020118
01000018 |
D. Weigh bridge Roofing |
|
0 |
0 |
0 |
0 |
3,000,000 |
1,000,000 |
2,000,000 |
6,000,000
|
|
|
BANKABLE PROJECTS: PROVISION OF PARBOILED
LONG GRAIN PADDY RICE TO THE THREE MODERN RICE MILL CLUSTER IN THE STATE FOR
PROCESSING FOR ONE YEAR. |
|
|
|
|
|
|
0 |
0 |
1,000,000,000
|
|
15102003/
23020118
01000021 |
Working capital for all Rice mill |
|
0 |
0 |
0 |
0 |
1,000,000,000
|
0 |
0 |
1,000,000,000
|
|
|
SUB-TOTAL |
|
|
|
|
|
1,113,000,000 |
26,000,000 |
17,000,000 |
1,156,000,000 |
|
TOTAL CAPITAL EXPENDITURE EBONYI RICE
WORLD |
0 |
0 |
0 |
0 |
1,315,000,000 |
142,500,000 |
145,500,000 |
1,603,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE FERTILIZER & CHEMICAL CO. LTD. |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
15110002 |
EBONYI STATE FERTILIZER & CHEMICAL CO. LTD. |
|
|
|
|
|
|
|
|
|
ECONOMIC EMPOWERMENT THROUGH AGRICULTURE |
|
|
|
|
|
|
|
|
15110002/
23020101/
01000001 |
Fertilizer Blending plant
1. Completion and furnishing of Admin.
Blocks. |
0101 |
5,000,000
|
0.00 |
10,000,000
|
0.00 |
22,750,000
|
10,000,000
|
10,000,000
|
42,750,000
|
|
15110002/
23020118/
01000002 |
Construction of Engineering Workshop at Onuebonyi Izzi. |
0101 |
0.00 |
0.00 |
0.00 |
0.00 |
9,750,000
|
3,000,000
|
0 |
12,750,000
|
|
15110002/
23040101/
01000003 |
Landscaping of new Admin. Block premises at Izzi. |
0101 |
0.00 |
0.00 |
0.00 |
0.00 |
4,225,000
|
0.00 |
0.00 |
4,225,000
|
|
15110002/
23010107/
01000004 |
Purchase of Trucks for Haulage 2Nos. |
0101 |
0.00 |
0.00 |
0.00 |
0.00 |
10,000,000 |
0.00 |
0.00 |
10,000,000 |
|
15110002/
23010107/
01000005 |
Purchase of 2 Hilux. |
0101 |
0.00 |
0.00 |
0.00 |
0.00 |
9,000,000
|
0.00 |
0.00 |
9,000,000 |
|
TOTAL CAPITAL EXPENDITURE EBONYI STATE
FERTILIZER & CHEMICAL COY. LTD. |
5,000,000
|
0.00 |
10,000,000
|
0.00 |
55,725,000
|
13,000,000
|
10,000,000
|
78,725,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF FINANCE AND ECONOMIC DEVELOPMENT |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
20001001 |
MINISTRY OF FINANCE AND ECONOMIC DEVELOPMENT |
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
20001001/
23020118/
13000001 |
Purchase of 1No. Hilux Jeep for P/S |
1303 |
0 |
0 |
32,000,000 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
20001001/
23010119/
13000002 |
Procurement of 1No. 250KVA Gen. Sets |
1303 |
0 |
0 |
0 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
20001001/
23010123/
13000003 |
Provision of Fire Extinguishers |
1303 |
0 |
0 |
0 |
0 |
650,000 |
0 |
0 |
650,000 |
|
20001001/
23010119/
13000004 |
Procurement of office equipments:
7|Nos TV sets
5Nos Radio sets
3Nos Photocopiers
5Nos Computer sets/printers
5Nos Refrigerators |
1303 |
0 |
0 |
1,850,000 |
0 |
9,750,000 |
0 |
0 |
9,750,000 |
|
20001001/
23010108/
13000005 |
Purchase of 1No. Bus (Budget Office) |
1303 |
0 |
0 |
0 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
|
SUB-TOTAL |
|
0 |
|
33,850,000 |
0 |
46,900,000
|
0 |
0 |
46,900,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF FINANCE AND ECONOMIC DEVELOPMENT |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
20001001 |
MINISTRY OF FINANCE AND ECONOMIC DEVELOPMENT |
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
20001001/
23010119/
13000006 |
Purchase of office furniture and fitting
3Nos Sets Executive upholstery
2Nos Mini sets Executive upholstery
3Nos. Sets Executive table
2Nos set min executive table
10 Nos steel cabinet
Wincow blinds |
1303 |
0 |
0 |
1,850,000 |
0 |
9,750,000 |
0 |
0 |
9,750,000 |
|
20001001/
23010119/
13000007 |
Re-location/Re-installation of automated Payment System Platform |
1303 |
0 |
0 |
0 |
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
1,850,000 |
0 |
19,750,000 |
0 |
0 |
19,750,000 |
|
TOTAL CAPITAL EXPENDITURE, MINISTRY OF FINANCE AND ECONOMIC DEVELOPMENT |
0 |
0 |
144,400,000
|
0 |
66,650,000
|
0 |
0 |
66,650,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
BUDGET OFFICE |
|
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
20003001 |
BUDGET OFFICE |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
20003001/
23010139/
13000001 |
Procurement of office equipment:
* 1No. Television set
* 1No. Refrigerator |
1303 |
0 |
0 |
2,850,000 |
0 |
1,000,000 |
0 |
0 |
1,000,000 |
|
20003001/
23010108/
13000002 |
Purchase of 1No. Hilux Jeep for Director of Budget. |
1303 |
8,000,000 |
0 |
0 |
0 |
15,000,000 |
0 |
0 |
15,000,000
|
|
20003001/
23010112/
13000003 |
Purchase of office furniture and fittings:
i. 1No set of upholstry
ii. 1No.Office tables. |
1303 |
0.00 |
0 |
1,850,000 |
0 |
1,000,000 |
0 |
0 |
1,000,000 |
|
TOTAL CAPITAL EXPENDITURE, BUDGET OFFICE |
8,000,000 |
0 |
4,700,000 |
0 |
17,000,000 |
0 |
0 |
17,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE ACCOUNTANT GENERAL |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
20007001 |
OFFICE OF THE ACCOUNTANT GENERAL |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
20007001/
23020118/
13000001 |
Relocation of Final Accounts to centinary city. |
1308 |
5,000,000 |
0.00 |
0 |
0 |
2,000,000 |
0 |
0 |
2,000,000 |
|
20007001/
23020118/
13000002 |
Construction of suitable archives for vouchers for ease of auditing/references. |
1308 |
10,000,000 |
0.00 |
0 |
0 |
5,000,000 |
0 |
0 |
5,000,000 |
|
20007001/
23010119/
13000003 |
Provision of Inverta in Final Accounts & AG,s Office. |
1308 |
0.00 |
0.00 |
8,000,000
|
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
20007001/
23010139/
13000004 |
Provision of office equipment for AG's Office (Ags steel Cabinet, ceiling &
standing fans, TV, Radio. |
1308 |
0.00 |
0.00 |
2,000,000
|
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
20007001/
23050101/
13000005 |
Production, Publication and circulation of Annual financial Statements. |
1308 |
0 |
0 |
20,000,000 |
0 |
5,000,000 |
0 |
0 |
5,000,000 |
|
20007001/
23010123/
13000006 |
Provision of Fire Extinguisher for Ags Office and 13 Nos STs in the State. |
1308 |
0 |
0 |
2,000,000 |
0 |
3,000,000 |
0 |
0 |
3,000,000 |
|
|
SUB-TOTAL |
|
15,000,000 |
0 |
35,000,000
|
0 |
35,000,000 |
0 |
0 |
35,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE ACCOUNTANT GENERAL |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
20007001 |
OFFICE OF THE ACCOUNTANT GENERAL |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
20007001/
23010128/
13000007 |
Provision of security and adequate storage of security documents in Ags Office
strong rooms and bungalows. |
1308 |
0 |
0 |
0 |
0 |
5,000,000 |
0 |
0 |
5,000,000 |
|
20007001/
23010115/
13000008 |
Purchase of 15Nos photocopiers, 2Nos for AG's Office and 10Nos for the 13 STs in
the State, |
1308 |
0 |
0 |
3,000,000 |
0 |
8,000,000 |
0 |
0 |
8,000,000 |
|
20007001/
23010112/
13000009 |
Procurement of Furniture for AG's Office at the Centenary City. |
1308 |
0 |
0 |
0 |
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
23,000,000 |
0 |
0 |
23,000,000 |
|
TOTAL CAPITAL EXPENDITURE, OFFICE OF THE ACCOUNTANT GENERAL |
15,000,000 |
0 |
38,000,000 |
0 |
58,000,000 |
0 |
0 |
58,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
BOARD OF INTERNAL REVENUE |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
20008001 |
BOARD OF INTERNAL REVENUE |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
20008001/
23020101/
13000001
|
Construction of 3No.Tax and Motor licensing offices at the Senatoria zones |
1306 |
0 |
0 |
10,900,000 |
0 |
10,300,000 |
0 |
0 |
10,300,000 |
|
20008001/
23010106/
13000002
|
Purchase of 2No Hiace fo 13 LGAs. |
1306 |
0 |
0 |
16,000,000 |
0 |
30,00,000 |
0 |
0 |
30,00,000 |
|
20008001/
23010113/
13000003
|
Purchase of 5Nos sets of computer for BIR Headquarters. |
1306 |
0 |
0 |
1,000,000 |
0 |
1,000,000 |
0 |
0 |
1,000,000 |
|
20008001/
23010115/
13000004
|
Purchase of 2No. Photocopying |
1306 |
0 |
0 |
0 |
0 |
900,000 |
0 |
0 |
900,000 |
|
20008001/
23010139/
13000005
|
Purchase of 5No ceiling fans and 5No. Standing fans |
1306 |
0 |
0 |
400,000 |
0 |
500,000 |
0 |
0 |
500,000 |
|
20008001/
23010139/
13000006
|
Purchase of steel cabinets, 100 tables, 200 chairs and 50 wall clocks. |
1306 |
0 |
0 |
900,000 |
0 |
1,000,000 |
0 |
0 |
1,000,000 |
|
20008001/
23010123/
13000007
|
Purchase of 20Nos Cylinders of fire extinguisher for Headquarters and 3 zones. |
1306 |
0 |
0 |
5,100,000 |
0 |
6,000,000 |
0 |
0 |
6,000,000 |
|
20008001/
23010139/
13000008
|
Purchase of 3No. Air conditioneers |
1306 |
0 |
0 |
0 |
0 |
300,000 |
0 |
0 |
300,000 |
|
TOTAL CAPITAL EXPENDITURE, BOARD OF INTERNAL REVENUE |
0 |
0 |
27,635,000 |
0 |
50,000,000 |
0 |
0 |
50,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI INVESTMENT AND PROPERTY CO. LTD. |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
20012001 |
EBONYI INVESTMENT AND PROPERTY CO. LTD. |
|
|
|
|
|
|
|
|
|
GROWING THE PRIVATE SECTOR |
|
|
|
|
|
|
|
|
|
20012001/
23060101/
12000001 |
Investment on shares of company |
1204 |
10,000,000 |
0 |
20,000,000 |
0 |
10,000,000 |
30,000,000 |
35,000,000 |
75,000,000 |
|
20012001/
23010106/
12000002 |
Purchase of office vehicles (1No) Hilux Van |
1204 |
0 |
0 |
10,000,000 |
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
20012001/
23010139/
12000003 |
Purchase of Office Equipment. |
1204 |
0 |
0 |
10,000,000 |
0 |
12,000,000 |
0 |
0 |
12,000,000 |
|
20012001/
23010101/
12000004 |
Acquisition of 50 plots of land for estate development. |
1204 |
100,000,000 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
20012001/
23010105/
12000005 |
Purchase of 2 tipper lorry |
1204 |
0 |
0 |
0 |
0 |
0 |
0 |
15,000,000 |
15,000,000 |
|
20012001/
23010105/
12000006 |
Purchase of 1 Dina truck |
1204 |
0 |
0 |
0 |
0 |
0 |
0 |
7,000,000 |
7,000,000
|
|
20012001/
23010105/
12000007 |
Purchase of 1 big lister generator 10KVA |
1204 |
1,200,000 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
TOTAL CAPITAL EXPENDITURE, EBONYI INVESTMENT AND PROPERTY CO. LTD. |
111,200,000
|
0 |
40,000,000
|
0 |
32,000,000
|
30,000,000
|
57,000,000
|
119,000,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
FISCAL RESPONSIBILITY COMMISSION |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
20013001 |
FISCAL RESPONSIBILITY COMMISSION |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
20013001/
23010119/
13000001 |
Purchase of 100KVA Gen. Set (power) |
1301 |
7,000,000 |
0 |
3,000,000 |
0 |
3,500,000 |
0 |
0 |
3,500,000 |
|
20013001/
23010113/
13000002 |
Purchase of 10 laptops & 2 sets of computers for office use. |
1305 |
1,000,000 |
0 |
3,000,000 |
0 |
1,950,000 |
0 |
0 |
1,950,000 |
|
20013001/
23030101/
13000003 |
Rehabilitation of office block i.e. replacement of broken ceiling, doors,
toilet, seats, repainting of office block. |
1319 |
2,500,000 |
0 |
10,600,000 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
20013001/
23010105/
13000004 |
Purchase of 5No. Motor Vehicles for 4 Commissioners and Secretary of the
Commission. |
1306 |
10,000,000 |
0 |
60,000,000 |
0 |
60,000,000 |
0 |
0 |
60,000,000 |
|
20013001/
23010106/
13000005 |
Purchase of 1No. Hilux Van. |
1306 |
7,000,000 |
0 |
8,000,000 |
0 |
9,500,000 |
0 |
0 |
9,500,000 |
|
20013001/
23010112/
13000006 |
Procurement of office tables and chairs. |
1305 |
2,000,000 |
- |
4,000,000 |
- |
2,600,000 |
0 |
0 |
2,600,000 |
|
20013001/
23050103/
13000007 |
Monitoring and investigation/ evaluation of Capital Budget in both MDAs and
LGAs. |
1308 |
500,000 |
0 |
2,000,000 |
1,000,000 |
1,950,000 |
0 |
0 |
1,950,000 |
|
|
SUB-TOTAL |
|
28,000,000 |
0 |
86,600,000 |
1,000,000 |
89,600,000 |
0 |
0 |
89,600,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
FISCAL RESPONSIBILITY COMMISSION |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
20013001 |
FISCAL RESPONSIBILITY COMMISSION |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
20013001/
23010127/
13000008 |
Procurement of rack, cutlers, shovel, head pan, rain boot, flower cutters, etc. |
1306 |
0 |
0 |
100,000 |
0 |
200,000 |
0 |
0 |
200,000 |
|
20013001/
23050102/
13000009 |
Installation of ICT, web based application/data base interactive site, for
Dispatch Financial Management and Accounting System (DFMAS). |
1306 |
0 |
0 |
2,000,000 |
0 |
22,750,000 |
0 |
0 |
22,750,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
2,100,000 |
0 |
22,950,000 |
0 |
0 |
22,950,000 |
|
TOTAL CAPITAL EXPENDITURE FISCAL RESPONSIBILITY COMMISSION |
28,000,000 |
0 |
88,700,000 |
1,000,000 |
108,950,000 |
0 |
0 |
108,950,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
|
|
|
|
|
|
|
|
|
|
|
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF COMMERCE AND INDUSTRY |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
22001001 |
MINISTRY OF COMMERCE AND INDUSTRY |
|
|
|
|
|
|
|
|
|
GROWING THE PRIVATE SECTOR |
|
|
|
|
|
|
|
|
|
22001001/ 23020124 / 12000001 |
Completion of International Market at Abakaliki |
1201 |
700,000,000 |
68,000,000 |
700,000,000 |
|
971,850,000 |
500,000,000 |
200,000,000 |
1,671,850,000 |
|
22001001 / 23020118/ 12000002 |
Provision of Funds for 350 Nos. of Small Scale Industries/Credit Scheme. |
1202 |
300,000,000 |
|
200,000,000 |
0 |
195,000,000 |
100,000,000 |
150,000,000 |
445,000,000 |
|
22001001 / 23020118/ 12000003 |
Govt contribution to the Establishment of Woven Bag Industry. |
1204 |
|
|
60,000,000 |
0 |
130,000,000 |
50,000,000 |
10,000,000 |
190,000,000 |
|
22001001 / 23020118/ 12000004 |
Establishment/Development of Ebonyi State Industrial Layout |
1201 |
0 |
0 |
20,000,000 |
0 |
195,000,000 |
20,000,000 |
10,000,000 |
225,000,000 |
|
22001001/ 23020123/ 12000005 |
Construction of Regional Market across the State. |
1201 |
0 |
0 |
280,000,000 |
0 |
189,000,000 |
300,000,000 |
200,000,000 |
695,000,000 |
|
22001001 /
23010105/
12000006 |
Purchase of 1NO. Hilux for Internal Generation of revenue (IGR) monitoring |
1201 |
16,000,000 |
0 |
24,000,000 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
22001001 /
23010105/
12000007 |
Multiple PVC Industrial |
1201 |
0 |
0 |
0 |
0 |
650,000,000 |
0 |
0 |
650,000,000 |
|
TOTAL CAPITAL EXPENDITURE MINISTRY OF COMMERCE AND INDUSTRY. |
1,016,000,000 |
68,000,000 |
1,284,000,000 |
0 |
2,345,850,000 |
970,000,000 |
570,000,000 |
3,885,850,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF SOLID MINERAL DEVELOPMENT COMMUNITIES |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
22051001 |
MINISTRY OF SOLID MINERAL DEVELOPMENT COMMUNITIES |
|
|
|
|
|
|
|
|
|
|
|
GROWING THE PRIVATE SECTOR |
|
|
|
|
|
|
|
|
22051001/
23020118/
12000001 |
Investigation of the Coal and other mineral deposits. |
1206 |
0 |
0 |
1,100,000,000 |
10,000,000 |
52,000,000 |
0 |
0 |
52,000,000 |
|
22051001/
23020118/
12000002 |
Hydrocarbon Investigation |
1206 |
0 |
0 |
0 |
0 |
32,500,000 |
0 |
0 |
32,500,000 |
|
22051001/
23050108/
12000003 |
Purchase of office furniture and fitting:
i. Office tables & Chairs
ii. 1No. Set of Upholstery |
1206 |
0 |
0 |
2,000,000 |
0 |
0 |
0 |
0 |
0 |
|
22051001/
23010106/
12000004 |
Purchase of motor vehicles 1Nos. Hilux. |
1206 |
0 |
0 |
0 |
0 |
13,500,000 |
0 |
0 |
13,500,000 |
|
22051001/
23050108/
12000005 |
Acquisition of Exploration, Licence/ Annual Service Charges |
1206 |
0 |
0 |
0 |
0 |
7,800,000 |
0 |
0 |
7,800,000 |
|
TOTAL CAPITAL EXPENDITURE MINISTRY OF SOLID MINERAL DEVELOPMENT COMMUNITIES |
0 |
0 |
1,102,000,000 |
10,000,000
|
105,800,000 |
0 |
0 |
105,800,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
CEMENT AND SALT PRODUCTION, OFFICE OF THE GOVERNOR |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
22051001 |
CEMENT AND SALT PRODUCTION, OFFICE OF THE GOVERNOR |
|
|
|
|
|
|
|
|
|
|
|
GROWING THE PRIVATE SECTOR |
|
|
|
|
|
|
|
|
22051001/
23020118/
12000001 |
Establishment of cement industries to utilize abundant raw materials in the
state. |
1206 |
0 |
0 |
0 |
0 |
650,000,000 |
0 |
0 |
650,000,000 |
|
22051001/
23020118/
12000002 |
Payment for Annual Service Charge Fees for our licences for year 2017 |
1206 |
0 |
0 |
0 |
0 |
19,500,000 |
0 |
0 |
19,500,000 |
|
22051001/
23010112/
12000003 |
Acquisition of new licences |
1206 |
0 |
0 |
0 |
0 |
32,500,000 |
0 |
0 |
32,500,000 |
|
22051001/
23050108/
12000004 |
Geological studies of minerals/coal. |
1206 |
0 |
0 |
0 |
0 |
195,000,000 |
0 |
0 |
195,000,000 |
|
22051001/
23050108/
12000005 |
Purchase of office furniture and fitting |
1206 |
0 |
0 |
0 |
0 |
1,300,000 |
0 |
0 |
1,300,000 |
|
22051001/
23010106/
12000006 |
Purchase of 1No. Hilux Van |
1206 |
0 |
0 |
0 |
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
22051001/
23050108/
12000007 |
Purchase of measuring devices |
1206 |
0 |
0 |
0 |
0 |
325,000 |
0 |
0 |
325,000 |
|
|
SUB-TOTAL |
|
|
|
|
|
908,625,000 |
0 |
0 |
908,625,000 |
|
TOTAL CAPITAL EXPENDITURE CEMENT AND SALT PRODUCTION, OFFICE OF THE GOVERNOR |
0 |
0 |
0 |
0 |
1,014,425,000 |
0 |
0 |
1,014,425,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE INDUSTRIAL ESTATE MANAGEMENT BOARD |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
22054001 |
EBONYI STATE INDUSTRIAL ESTATE MANAGEMENT BOARD |
|
|
|
|
|
|
|
|
GROWING THE PRIVATE SECTOR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI BUILDING MATERIAL INDUSTRY LTD |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
22056001 |
EBONYI BUILDING MATERIALS INDUSTRY LTD |
|
|
|
|
|
|
|
|
|
GROWING THE PRIVATE SECTOR |
|
|
|
|
|
|
|
|
|
22056001/
23010107/
12000001 |
Purchase of 1No. Haib & 1No Tipper |
1206 |
0 |
0 |
11,140,000 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
22056001/
23030118/
12000002 |
Rehabilitation/Repairs of 2No factory building. |
1206 |
0 |
0 |
50,000,000 |
0 |
65,000,000 |
50,000,000 |
60,000,000 |
175,000,000 |
|
22056001/
23050101/
12000003 |
Rehabilitation/Repairs of 4No Office building. |
1206 |
0 |
0 |
20,000,000 |
0 |
16,250,000 |
20,000,000 |
60,000,000 |
96,250,000 |
|
22056001/
23020105/
12000004 |
Construction/Provision of Water Borehole with overhead tank and reticulation to
all building in the factory. |
1206 |
0 |
0 |
2,500,000 |
0 |
2,275,000 |
500,000 |
600,000 |
3,375,000 |
|
22056001/
23010113/
12000005 |
Purchase of 3No. Computer set |
1206 |
0 |
0 |
100,000 |
0 |
195,000 |
100,000 |
100,000 |
395,000 |
|
22056001/
23010114/
12000006 |
Purchase of 3No.Computer Printers |
1206 |
0 |
0 |
100,000 |
0 |
60,000 |
540,000 |
100,000 |
700,000 |
|
22056001/
23010114/
12000007 |
Purchase of 1No. Photocopying machine |
1206 |
0 |
0 |
150,000 |
0 |
260,000 |
100,000 |
100,000 |
460,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
83,990,000 |
0 |
99,040,000 |
71,240,000 |
120,900,000 |
291,180,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI BUILDING MATERIAL INDUSTRY LTD |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
22054001 |
EBONYI BUILDING MATERIALS INDUSTRY LTD |
|
|
|
|
|
|
|
|
|
GROWING THE PRIVATE SECTOR |
|
|
|
|
|
|
|
|
|
22056001/
23050101/
12000001 |
Rehabilitation/Repairs of Heavy Duty Machines |
1206 |
0 |
0 |
5,000,000 |
0 |
4,550,000 |
2,000,000 |
1,000,000 |
7,550,000 |
|
22056001/
23050101/
12000001 |
Purchase of 300KVA/350KVA Power Generating Set. |
1206 |
0 |
0 |
3,000,000 |
0 |
5,850,000 |
10,000,000 |
8,000,000 |
23,850,000 |
|
|
SUB-TOTAL |
|
|
|
8,000,000 |
0 |
10,400,000 |
12,000,000
|
9,000,000
|
31,400,000 |
|
TOTAL CAPITAL EXPENDITURE, EBONYI BUILDING MATERIAL INDUSTRY LTD. |
0 |
0 |
91,990,000
|
0 |
109,440,000
|
83,240,000
|
129,900,000
|
322,580,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WORKS AND TRANSPORT |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL
2017 - 2019 |
|
34001001 |
MINISTRY OF WORKS AND TRANSPORT |
|
|
|
|
|
|
|
|
|
|
ROAD |
|
|
|
|
|
|
|
|
|
|
PROJECT II |
|
|
|
|
|
|
|
|
|
|
34001001/
23020114/
17000001 |
Reconstruction of street roads and construction of flyover at Abakaliki |
1701 |
11,467,465,888 |
5,471,536,746.80 |
8,000,000,000 |
0 |
0 |
0 |
0 |
0 |
|
34001001/
23020118/
17000002 |
(a) Construction of Akanu Ibiam Round about flyover Bridge |
1701 |
|
|
do |
623,365,013.53 |
215,150,000 |
0 |
0 |
215,150,000.00 |
|
34001001/
23020118/
17000003 |
(b) Construction of Presco junction flyover Bridge |
|
|
do |
632,725,816 |
209,065,478.38 |
0 |
0 |
209,065,478.38 |
|
34001001/
23030124/
17000004 |
(c)Construction of international Market flyover Bridge |
|
|
|
do |
534,053,910 |
202,511,499.45 |
0 |
0 |
202,511,499.45 |
|
|
ANCILLIARY WORKS |
|
|
|
|
|
|
|
|
|
|
34001001/
23020118/
17000005 |
i) Construction of Akanu Ibiam Round about fly-over bridge Ancillary works (lot
2) |
1701 |
|
|
do |
273,081,884.67 |
520,000,000 |
0 |
0 |
520,000,000 |
|
34001001/
23010106/
17000006 |
j) Construction of International Market flyover bridge Ancillary works (lot 1). |
1701 |
|
|
do |
270,504,413.50 |
520,000,000 |
0 |
0 |
520,000,000 |
|
34001001/
23020118/
17000007 |
k.) Construction of Presco flyover bridge Ancillary works (lot 2). |
1701 |
|
|
do |
273,004,456.74 |
520,000,000 |
0 |
0 |
520,000,000 |
|
|
SUB-TOTAL |
|
11,467,465,888 |
5,471,536,746.80 |
8,000,000,000 |
2,606,735,124,44 |
2,186,726,977.83 |
0 |
0 |
2,186,726,977.83 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WORKS AND TRANSPORT |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
|
f) The pilling of the base of the retaining wall foundations at the three
flyover ancillary works projects at Presco Junction, Akanu Ibiam Roundabout and
International Market respectively, including reconstruction of canal discharging
flood water traversing the proposed International Trade Centre Complex and
crossing from the highway into the democracy Estate at Presco Junction,
Abakaliki Ebonyi State. |
|
|
|
|
43,179,788.50 |
65,000,000 |
0 |
0 |
65,000,000 |
|
|
CONSTUCTION OF STREET ROADS AT ABAKALIKI (Internal Roads) |
|
|
|
|
|
|
|
|
|
|
34001001/
23020118/
17000008 |
(a) Construction of Chief Stephen Omege Ogboloko Watchman Igu-Nwojiji road
(8.41km) |
1701 |
0 |
0 |
943,226,728.05 |
553,472,062.05 |
253,340,532.90 |
0 |
0 |
253,340,532.90 |
|
34001001/
23020118/
17000009 |
(b) Construction of Golf-Quarry-Expressway road, Ezza road-Emefor (7.09km |
0 |
0 |
825,842,834 |
397,752,834 |
278,258,500.00 |
0 |
0 |
278,258,500.00 |
|
34001001/
23010106/
17000010 |
(c) Construction of Ndiagu Layout roads (6.6km) |
1701 |
0 |
0 |
774,684,274 |
382,405,288 |
254,981,340.90 |
0 |
0 |
254,981,340.90 |
|
34001001/
23020118/
17000011 |
(d)Rehabilitation of fourteen streets within Abakaliki Capital City (5.76km) |
0 |
0 |
594,652,680.30 |
328,395,804.09 |
173,066,969.40 |
0 |
0 |
173,066,969.40 |
|
|
SUB-TOTAL |
|
|
|
3,138,406,516
|
1,705,205,776.64
|
1,024,647,343.20
|
0 |
0 |
1,024,647,343.20
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WORKS AND TRANSPORT |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
34001001 |
MINISTRY OF WORKS AND TRANSPORT |
|
|
|
|
|
|
|
|
|
34001001/
23010106/
17000012 |
h) Construction of Umunze-Eckankar-Enugu Expressway, Mbam Agbo Phases 1 and 2
etc (6.77km) |
1701 |
0 |
0 |
750,252,209.70 |
375,075,662.91 |
214,614,754.40 |
0.00 |
0.00 |
214,614,754.40 |
|
34001001/
23020118/
17000013 |
c) Construction of Ugwuachara-water Reservoir road (6.9km) |
1701 |
0 |
0 |
784,796,543 |
379,438,962.90 |
250,482,427.00 |
0.00 |
0.00 |
250,482,427 |
|
34001001/
23020118/
17000014 |
e) Construction of kpiri-kpiri junction St Patrick- unity FM and Osborn
La-Palm-Otozi Stephen Mgbabor Street (5.64km). |
1701 |
0 |
0 |
641,587,080.33 |
342,476,124.10 |
194,422,121.50 |
0.00 |
0.00 |
194,422,121.50 |
|
|
CONSTRUCTION AND REHABILITATION OF OVER 200KM ROADS ACROSS THE STATE |
|
|
|
3,000,000,000 |
|
1,050,000,000 |
|
|
1,050,000,000 |
|
34001001/
23020118/
17000015 |
(a) Rehabilitation and completion of first phase of 13km on Nkwagu-FUNAI Agubia
Road |
|
0 |
0 |
630,362,650.00 |
0.00 |
0.00 |
|
34001001/
23020118/
17000016 |
(b) Rehabilitation of Nkwagu FUNAI-Agubia Road concreting of shoulders for 13km
and payment of stone base. |
|
0 |
0 |
309,230,437.50 |
0.00 |
0.00 |
|
34001001/
23020118/
17000017 |
(c) Construction of Internal Road premises and car park within Nigeria Police
Headquarters, Abakaliki , Justice Nwali Ngwuta Street, Off Onwe Road, Abakaliki. |
|
0 |
0 |
152,955,476.00 |
0.00 |
0.00 |
|
34001001/
23020118/
17000018 |
(d) Reconstruction of Udensi Road to
Ebebe Junction (1.55km). |
|
0 |
0 |
126,837,375.00 |
0.00 |
0.00 |
|
|
SUB-TOTAL |
|
|
|
5,176,635,833.03 |
2,316,376,688.41 |
1,709,519,302.90 |
0.00 |
0.00 |
1,709,519,302.90 |
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WORKS AND TRANSPORT |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
34001001/
23020118/
17000019 |
Construction of Ishieke-Odomoke road Ebonyi LGA (15km) |
1701 |
0 |
0 |
do |
50,000,000 |
942,500,000 |
0 |
0 |
942,500,000 |
|
34001001/
23020118/
17000020 |
Construction of Onueke internal roads. Ezza South LGA (15km) |
1701 |
0 |
0 |
do |
213,100,788 |
973,205,461.80 |
0 |
0 |
973,205,462 |
|
34001001/
23020118/
17000021 |
Construction of Okposi Umuoghara –Ebiaji road-Ezza North LGA (16 km) |
1701 |
0 |
0 |
do |
420,048,673.70 |
637,073,821.80 |
0 |
0 |
637,073,821.80 |
|
34001001/
23020118/
17000022 |
Construction of Onicha-Obiozara road in Ohaozara and Onicha LGAs (8.3km) |
1701 |
0 |
0 |
do |
330,000,000 |
500,500,000 |
0 |
0 |
500,500,000 |
|
34001001/
23020118/
17000023 |
Construction of Onunwakpu-FUNAI-Onuebonyi Echara road in Ikwo LGA (6 km) |
1701 |
0 |
0 |
do |
100,000,000 |
364,000,000 |
0 |
0 |
364,000,000 |
|
34001001/
23020118/
17000024 |
Construction of Uburu-Isu road (13.3km) in Onicha and Ohaozara LGAs |
1701 |
0 |
0 |
do |
446,502,834.41 |
600,000,000 |
0 |
0 |
600,000,000 |
|
34001001/
23030124/
17000025 |
Construction of Ishiagu Okue-Nzerem Akaeze road (13.3km) in Ivo LGA |
1701 |
0 |
0 |
do |
390,000,000 |
591,500,000 |
0 |
0 |
591,500,000 |
|
34001001/
23020118/
17000026 |
Construction of Eke Ndibe Beach Afikpo- St Mary-Amangbala road with a spur to
Idu Igariwe Road (5.8km) in Afikpo North LGA. |
1701 |
0 |
0 |
do |
198,000,000 |
300,300,000 |
0 |
0 |
462,000,000 |
|
34001001/
23020118/
17000027 |
Construction of Enyibichirir Ojon-Nwida Road 12.4km in Ikwo L.G.A. |
1701 |
0 |
0 |
do |
50,000,000 |
812,500,000 |
0 |
0 |
812,500,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
do |
2,197,652,296.11 |
5,721,579,282.95 |
0 |
0 |
5,721,579,282.95 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WORKS AND TRANSPORT |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
34001001/
23020118/
17000028 |
Construction of Ukwuachi-Oshiegbe Road 11.2km in Ezza North LGA |
|
0 |
0 |
1,200,000,000 |
50,000,000 |
747,500,000 |
0 |
0 |
747,500,000 |
|
34001001/
23020118/
17000029 |
Construction of Oferekpe Ovuduechi Road 15km in Izzi LGA |
|
0 |
0 |
1,200,000,000 |
50,000,000 |
747,500,000 |
0 |
0 |
747,500,000 |
|
|
NEW PROJECT |
|
|
|
|
|
|
|
|
|
|
34001001/
23020118/
17000030 |
Construction of Uburu Ring Road |
|
0 |
0 |
0 |
|
950,000,000 |
0 |
0 |
950,000,000 |
|
34001001/
23020118/
17000031 |
Construction of Abaomege-Ukwu-Ugwulangwu-Okposi road (25km) in Onicha and
Ohaozara LGAs |
1701 |
0 |
0 |
0 |
0 |
1,950,000,000 |
0 |
0 |
1,950,000,000 |
|
34001001/
23020118/
17000032 |
Construction of Effium-Inikiri-Ichele Igbe Road (15km) |
|
0 |
00 |
0 |
0 |
1,365,000,000 |
0 |
0 |
1,365,000,000 |
|
34001001/
23020118/
17000033 |
Construction of Agba-Eguhuo Ezzagu Bridge and Access Road |
|
0 |
00 |
0 |
0 |
195,000,000 |
0 |
0 |
195,000,000 |
|
34001001/
23020118/
17000034 |
Construction of 2No. Bridges along Hill Top-Nwofe Road. |
|
0 |
00 |
0 |
0 |
650,000,000 |
0 |
0 |
650,000,000 |
|
34001001/
23020118/
17000035 |
Construction of 2Nos Bridges along Nkalagu-eha-Amufu Road. |
|
0 |
00 |
0 |
0 |
195,000,000 |
0 |
0 |
195,000,000 |
|
34001001/
23020118/
17000036 |
Direct Intervention Projects on roads, bridges, culverts and drainages across
the State. |
|
0 |
00 |
0 |
0 |
1,950,000,000 |
0 |
0 |
1,950,000,000 |
|
|
SUB-TOTAL |
|
0 |
00 |
2,400,000,000 |
100,000,000 |
8,750,000,000 |
0 |
0 |
8,750,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WORKS AND TRANSPORT |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
|
CONSTRUCTION AND INTERVENTION ON OTHER ROADS ACROSS THE STATE. |
|
|
|
12,457,000,000 |
|
|
|
|
|
|
34001001/
23020118/
17000037 |
a) Reconstruction of Amasiri-Okposi Uburu road (23.5km). |
1701 |
0 |
0 |
do |
770,848,900 |
1,337,508,788.85 |
0.00 |
0.00 |
1,337,508,788.85 |
|
34001001/
23020118/
17000038 |
b) Construction of Hill top-Nwofe road (23km). |
1701 |
0 |
0 |
do |
726,923,160 |
1,892,297,061.35 |
0 |
0 |
1,892,297,061.35 |
|
34001001/
23020118/
17000039 |
d) Construction of Nkalagu Eha-Amufu Road |
1701 |
0 |
0 |
do |
733,270,990.05 |
1,115,377,669.20 |
0 |
0 |
1,115,377,669.20 |
|
34001001/
23020118/
17000040 |
f) Reconstruction of Agba-Isu Road (15KM) |
1701 |
0 |
0 |
do |
0 |
1,486,447,326 |
0 |
0 |
1,486,447,326 |
|
34001001/
23020118/
17000041 |
g) Reconstruction of Onueke Ezzama-Oshiri-Onicha-Obiozara Road (30km). |
1701 |
0 |
0 |
do |
895,087,809 |
1,357,549,870.95 |
0.00 |
0.00 |
1,357,549,871 |
|
34001001/
23020118/
17000042 |
h)Reconstruction of Amasiri-Owutu Edda Road (15Km) |
1701 |
0 |
0 |
do |
569,299,260.60 |
770,249,180.35 |
0 |
0 |
770,249,180.35 |
|
34001001/
23020118/
17000043 |
Reconstruction of Ezzamgbo section of Abakaliki road (20km) |
|
0 |
0 |
do |
688,741,893 |
1,044,591,871 |
0 |
0 |
1,044,591,871 |
|
34001001/
23020118/
17000044 |
j)Construction of Margret Avenue in Uburu Ohaozara and new additional work. |
1701 |
0 |
0 |
do |
248,610,487.30 |
130,000,000 |
0.00 |
0.00 |
130,000,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
12,457,000,000 |
4,632,782,499.95 |
9,134,021,767.80 |
0.00 |
0.00 |
9,134,021,767.80 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WORKS AND TRANSPORT |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
34001001/
23020118/
17000045 |
Construction of drainages and earthworks on the road to the school of
Nursing/Presbyterian Joint Hospital and other adjoining Roads at Uburu, Ohaozara
Local Government Area and asphalting of the road later. |
|
0 |
0 |
362,939,644.83 |
108,881,893.45 |
885,000,000 |
0 |
0 |
885,000,000 |
|
|
CONSTRUCTION OF BRIDGES ACROSS THE STATE |
1701 |
0 |
0 |
500,000,000 |
0 |
0.00 |
0.00 |
0.00 |
0.00 |
|
34001001/
23010106/
17000046 |
a) Construction of a triple cell box culvert and esuriver channelization at
Uburu and construction of its road. |
1701 |
0 |
0 |
0 |
91,019,149.20 |
503,129,754.55 |
0.00 |
0.00 |
503,129,754.55 |
|
34001001/
23020118/
17000047 |
b) Reconstruction of 2No. 2span Bridges at Amangwu Edda |
1701 |
0 |
0 |
0 |
333,499,855.50 |
39,379,826.76 |
0.00 |
0.00 |
39,379,826.76 |
|
34001001/
23020118/
17000048 |
c) Construction of 2 span Bridge across Ebyia River along Amikeaba Ozibo village
road. |
1701 |
0 |
0 |
0 |
158,266,168.20 |
34,706,426.30 |
0.00 |
0.00 |
34,706,426.30 |
|
|
SUB-TOTAL |
|
0 |
0 |
862,939,644.83 |
691,667,066.35 |
1,462,216,007.61 |
0.00 |
0.00 |
1,462,216,007.61 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WORKS AND TRANSPORT |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
34001001 |
MINISTRY OF WORKS AND TRANSPORT |
|
|
|
|
|
|
|
|
|
|
EQUIPMENT |
|
|
|
|
|
|
|
|
|
|
34001001/
23020118/
17000049 |
Purchase of new construction equipment and payment of already purchased construction equipment |
1701 |
0 |
0 |
1,000,000,000 |
423,608,350.00 |
325,000,000 |
0 |
0 |
325,000,000 |
|
|
SA ON TRANSPORT |
|
|
|
|
|
|
|
|
|
|
34001001/
23020118/
17000050 |
Construction of 4 no. New Parks at:
i. Ishieke junction
ii. Presco Junction
iii. New Timber Shade
iv. Obubra junction
|
1701 |
0 |
0 |
30,000,000 |
0 |
39,000,000 |
0 |
0 |
39,000,000 |
|
|
|
|
34001001/
23020118/
17000051 |
Renovation of 3 no parks at:
i. Christ Nwankwo
ii. Centenary Park |
1701 |
0 |
0 |
0 |
0 |
7,800,000 |
0 |
0 |
7,800,000 |
|
34001001/
23020118/
17000052 |
Provision of 2000 Nos Road signs. |
1701 |
0 |
0 |
1,000,000 |
0 |
650,000 |
|
|
650,000 |
|
34001001/
23020118/
17000053 |
Construation/Installation of Bus stop sign posts |
1701 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
34001001/
23020118/
17000054 |
Renovation of VIO Offices at Afikpo and Onueke and provision of Furniture and
equipment |
1701 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
SUB-TOTAL |
|
0 |
0 |
1,031,000,000 |
423,608,350 |
372,450,000 |
0 |
0 |
372,450,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WORKS AND TRANSPORT |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
34001001 |
MINISTRY OF WORKS AND TRANSPORT |
|
|
|
|
|
|
|
|
|
|
NEW PROJECTS |
|
|
|
|
|
|
|
|
|
|
34001001/
23020118/
17000055 |
Revival of Pontoon at Oziza Afikpo North LGAS |
1701 |
0 |
0 |
0 |
0 |
9,750,000 |
0 |
0 |
9,750,000 |
|
34001001/
23020118/
17000056 |
Agubia, Oronga Road |
1701 |
0 |
0 |
1,000,000 |
0 |
195,000,000 |
0 |
0 |
195,000,000 |
|
34001001/
23020118/
17000057 |
Agba Egugwu Road |
1701 |
0 |
0 |
0 |
0 |
195,000,000 |
0 |
0 |
195,000,000 |
|
34001001/
23020118/
17000058 |
ROAD
Constituency projects for Honourable Members |
1701 |
0 |
0 |
0 |
0 |
104,000,000 |
0 |
0 |
104,000,000 |
|
34001001/
23020118/
17000059 |
Construction of the following Roads:
i. ADB Ring Road,
ii. Abakaliki Ring Road,
iii. Obubara-Offerekpe Road
iv. Ntezi-Agba-Isu Road
v. Abaomege Ukawu-Ugwulangwu Okposi Federal Road
vi. Okposi-Uburu Akeze Road
vii. Nkwagu/Amagu Onicha/ Ndinwamini/Ugwulangwu/ Enyigba Road 9km |
1701 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
34001001/
23020118/
17000060 |
Construction of Ogwu Bride and access roads (Ohaozara LGA) |
1702 |
0 |
0 |
0 |
0 |
500,000,000 |
0 |
0 |
500,000,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
1,000,000
|
0 |
1,003,750,000 |
0 |
0 |
1,003,750,000 |
|
GRAND TOTAL CAPITAL EXPENDITURE, MINISTRY OF WORKS AND TRANSPORT |
11,467,465,800 |
5,471,536,746.80 |
25,074,981,994.10 |
14,674,027,751.80 |
31,360,910,682.30 |
0 |
0 |
31,360,910,682.30 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE TRANSPORT CORP. (EBOTRANS) |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
34053001 |
EBONYI STATE TRANSPORT CORP. (EBOTRANS) |
|
|
|
|
|
|
|
|
34053001/
23010105/
12000001 |
Purchase of 10 Toyota Buses & 5 Siennna |
1204 |
0 |
12,700,000 |
50,000,000 |
8,100,000 |
100,000,000 |
106,040,000 |
225,544,000 |
431,584,000 |
|
|
SUB-TOTAL |
|
0 |
12,700,000 |
50,000,000
|
8,100,000
|
100,000,000
|
106,040,000
|
225,544,000
|
542,414,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE ROAD MTNC. AGENCY (EBROMA) |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
34004001 |
EBONYI STATE ROAD MTNC. AGENCY (EBROMA) |
|
|
|
|
|
|
|
|
|
ROAD |
|
|
|
|
|
|
|
|
|
|
|
To rehabilitate, maintain and repair the following Roads and and streets in the
state |
|
|
|
|
|
|
|
|
|
|
34004001/
23030114/
17000001 |
Rehabilitation of Streets/Roads |
1701 |
0 |
0 |
0 |
0 |
97,500,000 |
100,000,000 |
100,000,000 |
297,500,000 |
|
34004001/
23030114/
17000002 |
Rehabilitation of Federal roads |
1701 |
0 |
0 |
0 |
0 |
52,000,000 |
50,000,000 |
30,000,000 |
132,000,000 |
|
34004001/
23030114/
17000003 |
Purchase of vehicle/equipment |
1701 |
0 |
0 |
0 |
0 |
65,000,000 |
0 |
0 |
65,000,000 |
|
34004001/
23030114/
17000004 |
Fueling & logistics |
1701 |
0 |
0 |
0 |
0 |
13,000,000 |
5,000,000 |
5,000,000 |
23,000,000 |
|
TOTAL CAPITAL EXPENDITURE EBROMA |
0 |
|
0 |
0 |
227,500,000 |
155,000,000 |
135,000,000 |
517,500,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF CULTURE AND TOURISM |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
36001001 |
MINISTRY OF CULTURE AND TOURISM |
|
|
|
|
|
|
|
|
|
|
GROWING THE PRIVATE SECTOR |
|
|
|
|
|
|
|
|
|
36001001/
23020128/
12000001 |
Construction of Unity Square with Pavilion to be turned to Children park |
1204 |
120,000,000 |
- |
150,000,000 |
- |
100,000,000 |
50,000,000 |
- |
150,000,000 |
|
36001001/
23020118/
12000002 |
Completion of 1No. On-going cultural centre in Onicha.
|
1208 |
30,000,000
|
-
|
27,550,000
|
0 |
61,750,000 |
0 |
0 |
61,750,000 |
|
36001001/
23010108/
12000003 |
Purchase of 1No Hilux Van |
1211 |
0 |
0 |
7,000,000 |
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
36001001/
23010113/
12000004 |
Purchase of 3Nos Computers. |
1211 |
0 |
0 |
400,000 |
0 |
100,000 |
0 |
0 |
100,000 |
|
36001001/
23010114/
12000005 |
Purchase of 3No Printers and Accessories. |
1211 |
0 |
0 |
400,000 |
0 |
200,000 |
0 |
0 |
200,000 |
|
36001001/
23010115/
12000006 |
Purchase of 1No Photocopying Machines. |
1211 |
0 |
0 |
150,000 |
0 |
292,000 |
0 |
0 |
292,000 |
|
36001001/
23010119/
12000007 |
Purchase of 27HP KVA Generator. |
1211 |
0 |
0 |
150,000 |
0 |
195,000 |
0 |
0 |
195,000 |
|
|
SUB-TOTAL |
|
|
|
8,100,000 |
|
172,537,000 |
50,000,000 |
0 |
222,537,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF CULTURE AND TOURISM |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
36001001 |
MINISTRY OF CULTURE AND TOURISM |
|
|
|
|
|
|
|
|
|
|
|
GROWING THE PRIVATE SECTOR |
|
|
|
|
|
|
|
|
|
|
36001001/
23030119/
12000008 |
Rehabilitation and Reconstruction of the following sites:
- Palace of Ezeogo Dr. Akanu Ibiam's
residence.
- Green lake
- Amancho Cave, Okposi Uburu Salt Lakes.
- Preservation of slave routes @ Ezza North, South, Afikpo and Ohaozara LGAs.
- Crocodile pond @ Ezza North
- Nkpuma Ekwoku @ Izzi
- Juju Hill @ Abakaliki
- Jim Okonkwo Park.
- Green lake |
1208 |
0 |
0 |
0 |
0 |
21,333,000 |
0 |
0 |
21,333,000 |
|
36001001/
23020118/
12000009 |
Purchase of 150HP mowing machine |
1208 |
0 |
0 |
0 |
0 |
130,000 |
0 |
0 |
130,000 |
|
36001001/
23020118/
12000010 |
Centenary City Park
- Perimeter fencing
- Landscaping of bank of the lake/Beautification
- Gate House
- Dredging of the lake
- Building of pavilions (8Nos) and VIP (State box) Pavilion |
120 |
0 |
0 |
0 |
0 |
195,000,000 |
|
0 |
195,000,000 |
|
36001001/
23020118/
12000011 |
Purchase of 3Nos mechanized boat (Engine propelled) and accessories
- 3Nos manual boat (Canoe hand propelled) and accessories
- 20Nos life jacket |
1208 |
0 |
0 |
0 |
0 |
6,000,000 |
66,000,000 |
0 |
72,000,000 |
|
36001001/
23020104/
12000012 |
Construction of Archival Complex
- Administrative Office
- Repair workshop
- Storage area
- Library
- Search room and conference rooms. |
1208 |
0 |
0 |
0 |
0 |
5,000,000 |
0 |
0 |
5,000,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
14,000,000 |
0 |
227,463,000 |
66,000,000 |
0 |
293,462,500 |
|
TOTAL CAPITAL EXPENDITURE MINISTRY OF CULTURE AND TOURISM |
562,000,000
|
400,000,000 |
394,650,000
|
81,900,000
|
400,000,000 |
116,000,000 |
0 |
516,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE COUNCIL FOR ARTS AND CULTURE |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
36004001 |
EBONYI STATE COUNCIL FOR ARTS AND CULTURE |
|
|
|
|
|
|
|
|
|
SOCIETAL REORIENTATION |
|
|
|
|
|
|
|
|
|
|
36004001/
23020101/
02000001 |
Purchase of musical instruments/costumes (i) Modern: modern and and
acoompaniments including:
(a) Trumpets
(b) Saxophone
(c) Piano
(d) Electronic mixer
(e) Power amplifier
(f) Speaker
(g) Microphones etc.
(h) Purchase of traditional music
equipments which includes: a set of conga drums, big wooden gong (Ikoro 2No) 2
iron pots drum, one big mama drum, one pig papa drum, one big iron gong, three
big drums, two maracas, two small metal gong etc. two sets of male dancers
costume, two sets of female dancers costume, two sets of male dancers
accessories, two sets of female dancers accessories, two sets of traditional
musician costume and their accessories. Jigida, odu enyi, Eze's throne etc. |
|
0 |
0 |
50,000,000 |
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
TOTAL CAPITAL EXPENDITURE STATE COUNCIL FOR ARTS AND CULTURE |
0 |
0 |
5,000,000
|
0.00 |
10,000,000 |
0 |
0 |
10,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE TOURISM BOARD |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
36052001 |
EBONYI STATE TOURISM BOARD |
|
|
|
|
|
|
|
|
|
|
|
GROWING THE PRIVATE SECTOR |
|
|
|
|
|
|
|
|
|
|
36052001/
23010115/
12000001 |
Purchase of 1No. Photocopying Machines |
1204 |
0 |
0 |
0 |
0 |
780,000 |
0 |
0 |
780,000 |
|
36052001/
23030125/
12000002 |
Rehabilitation/Repairs of power generating plant at Amusement Park. |
1204 |
0 |
0 |
0 |
0 |
975,000 |
0 |
0 |
975,000 |
|
36052001/
23030119/
12000003 |
Rehabilitation/Repairs of Recreational facilities at Amusement Park. |
1204 |
1,000,000 |
0 |
0 |
0 |
195,000 |
1,000,000 |
0 |
1,195,000 |
|
36052001/
23030103/
12000004 |
Rehabilitation/Repairs of Electricity facilities at both Fatilami and Amusement
Park. |
1204 |
0 |
0 |
0 |
0 |
845,000 |
0 |
0 |
845,000 |
|
36052001/
23010119/
12000005 |
Purchase of 27 HP KVA Generator for Tourism Board Office. |
1204 |
0 |
0 |
0 |
0 |
200,000 |
0 |
0 |
200,000 |
|
TOTAL CAPITAL EXPENDITURE EBONYI STATE TOURISM BOARD |
4,000,000 |
0 |
0 |
0 |
2,995,000 |
1,000,000 |
0 |
3,995,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI HOTELS - AFIKPO |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
36052002 |
EBONYI HOTELS - AFIKPO |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI HOTELS - ABAKALIKI |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
36052003 |
EBONYI HOTELS - ABAKALIKI |
|
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02: ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
STATE PLANNING COMMISSION |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
38001001 |
STATE PLANNING COMMISSION |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
38001001/
23050103/
13000001 |
Monitoring and Evaluation of projects and programs, comprehensive quaterly
monitoring and evaluation of State, LGA and DCs project and programmes. |
1303 |
0.00 |
0.00 |
0.00 |
0 |
1,000,000 |
0 |
0 |
1,000,000 |
|
38001001/
23050101/
13000002 |
Preparation, production and printing of plan document. MTEF and capital budget of State LGA and
DCs. |
1303 |
0.00 |
0.00 |
0.00 |
0 |
1,000,000 |
0 |
0 |
1,000,000 |
|
38001001/
23010115/
13000003 |
Procurement of 1No. Photocoping Machine. |
1303 |
150,000
|
0.00 |
0.00 |
0 |
500,000 |
0 |
0 |
500,000 |
|
38001001/
23050101/
13000004 |
Publication/Library development Printing and publication of statistical year
book. |
1303 |
0.00 |
0.00 |
1,000,000
|
0 |
1,000,000 |
0 |
0 |
1,000,000 |
|
38001001/
23010113/
13000005 |
Procurement of 2Nos Computer sets. |
1305 |
0.00 |
0.00 |
200,000
|
0 |
200,000 |
0 |
0 |
200,000 |
|
38001001/
23010114/
13000006 |
Procurement of 2Nos Printers. |
1303 |
0.00 |
0.00 |
200,000
|
0 |
200,000 |
0 |
0 |
200,000 |
|
38001001/
23010139/
13000007 |
Procurement of 1Nos Refrigerator. |
1303 |
0.00 |
0.00 |
100,000
|
0 |
100,000 |
0 |
0 |
100,000 |
|
|
SUB-TOTAL |
|
150,000
|
-
|
1,500,000
|
|
4,000,000
|
0 |
0 |
4,000,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02: ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
STATE PLANNING COMMISSION |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
38001001 |
STATE PLANNING COMMISSION |
|
|
|
|
|
|
|
|
|
|
REFORM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
38001001/
23020126/
13000008 |
Establishment of a Central Information Management Unit and equiped with Internet
facilities. |
1319 |
2,000,000 |
0.00 |
1,000,000
|
0 |
1,000,000 |
1,500,000 |
0 |
2,500,000 |
|
38001001/
23010122/
13000009 |
Payment of GCCC for UNICEF & UNFPA & Other International Agency Programmes. |
1303 |
200,000,000
|
0.00 |
87,500,000
|
0 |
209,725,416 |
200,000,000 |
200,000,000 |
609,725,416 |
|
38001001/
23050101/
13000010 |
Statistical survey. |
1303 |
0.00 |
0.00 |
10,000,000
|
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
38001001/
23050104/
13000011 |
National Nutrition Programme |
1303 |
0.00 |
0.00 |
0.00 |
0 |
40,000,000 |
0 |
0 |
10,000,000 |
|
|
SUB-TOTAL |
|
202,000,000
|
0.00 |
98,500,000
|
0 |
260,725,416
|
201,500,000
|
200,000,000
|
662,225,416
|
|
TOTAL CAPITAL EXPENDITURE, EBONYI STATE PLANNING COMMISSION |
202,150,000
|
0.00 |
100,000,000 |
0 |
264,725,416
|
201,500,000 |
200,000,000 |
666,225,416 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
STATE STATISTICAL BUREAU |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
38004001/
23030101/
13000001 |
Development of electronic Web-based dashboard for data collection and management
of administrative statistics |
1319 |
0.00 |
0 |
0.00 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
38004001/
23010113/
13000002 |
Establishment of central information management system |
1319 |
0.00 |
0 |
0 |
0 |
5,000,000 |
0 |
0 |
5,000,000 |
|
38004001/
23010114/
13000003 |
Procurement of survey vehicles |
1319 |
0.00 |
0 |
0 |
0 |
30,000,000 |
0 |
0 |
30,000,000 |
|
38004001/
23010113/
13000004 |
Statistical surveys |
1319 |
0.00 |
0 |
0 |
0 |
50,000,000 |
0 |
0 |
50,000,000 |
|
38004001/
23010113/
13000005 |
Production of Sector Reports |
1319 |
0.00 |
0 |
0 |
0 |
5,000,000 |
0 |
0 |
5,000,000 |
|
TOTAL CAPITAL EXPENDITURE EBONYI STATE STATISTICAL BUREAU |
1,650,000 |
0 |
10,000,000 |
10,500,000 |
105,000,000 |
0 |
0 |
105,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF LANDS, SURVEY AND HOUSING |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
60001001 |
MINISTRY OF LANDS, SURVEY AND HOUSING |
|
|
|
|
|
|
|
|
|
HOUSING AND URBAN DEVELOPMENT |
|
|
|
|
|
|
|
|
|
60001001/
23020101/
06000001 |
Completion of new Secretariat Complex at Centinary City Abakaliki. |
604 |
980,000,000 |
0.00 |
1,000,000,000
|
0 |
500,000,000 |
0 |
0 |
500,000,000 |
|
60001001/
23010101/
06000002 |
Acquisition of lands for
i. Federal Government Assited New
National Housing Programme (25 Hectares)
ii. State Housing programme for the three
senatorial zones (50 Hectares)
iii. Other various Government Projects inclucing establishment of new layouts
(75 Hectares)
|
602 |
10,000,000 |
|
50,000,000
|
- |
165,000,000 |
0 |
0 |
165,000,000 |
|
60001001/
23030127/
06000003 |
Payment of compensation
i. Outstanding
ii. New Acquisition |
1104 |
1,000,000,000 |
0 |
600,000,000 |
0 |
165,000,000 |
200,000,000 |
0 |
365,000,000 |
|
60001001/
23020128/
06000004 |
Purchase of 2No. Bulldozers |
602 |
0 |
0 |
0 |
0 |
106,000,000 |
0 |
0 |
106,000,000 |
|
60001001/
23020114/
06000005 |
Opening of roads in Government layout |
602 |
0 |
0 |
30,000,000 |
30,000,000 |
19,500,000 |
0 |
0 |
19,500,000 |
|
60001001/
23050101/
06000006 |
Relocation of Automation from the former office to Centenary City |
1204 |
0 |
0 |
0 |
0 |
100,000,000 |
0 |
0 |
100,000,000 |
|
|
SUB-TOTAL |
|
1,990,000,000
|
0.00 |
1,680,000,000
|
30,000,000 |
1,055,500,000 |
200,000,000 |
0 |
1,382,500,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF LANDS, SURVEY AND HOUSING |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
60001001 |
MINISTRY OF LANDS, SURVEY AND HOUSING |
|
|
|
|
|
|
|
|
|
HOUSING AND URBAN DEVELOPMENT |
|
|
|
|
|
|
|
|
|
60001001/
23030102/
06000007 |
Development of Centenary City Layouts
i. Government House
ii. EXCO Estate (16 Houses)
iii. Centenary Golf Area
iv. Edumenical Centre
v. Shopping Mall |
602 |
0 |
0 |
0 |
0 |
2,250,000,000
1,104,000,000
130,000,000
650,000,000
1,001,200,000 |
0 |
0 |
2,250,000,000
1,104,000,000
130,000,000
650,000,000
1,001,200,000 |
|
60001001/
23020114/
06000008 |
Purchase of 3No. Hilux |
602 |
0 |
0 |
0 |
0 |
45,000,000 |
0 |
0 |
45,000,000 |
|
60001001/
23020114/
06000009 |
Clearing of site for Government projects |
602 |
0 |
0 |
0 |
16,200,000 |
19,100,000 |
0 |
0 |
19,100,000 |
|
60001001/
23020114/
06000010 |
Development of Ezzamgbo Industrial Park. |
603 |
0 |
0 |
0 |
0 |
130,000,000 |
0 |
0 |
130,000,000 |
|
60001001/
23020114/
06000011 |
Construction of the Governor's Lodge at Asokoro |
602 |
0 |
0 |
0 |
0 |
325,000,000 |
0 |
0 |
325,000,000 |
|
60001001/
23020114/
06000012 |
Consultancy Services for the Ministry. |
604 |
0 |
0 |
0 |
0 |
32,500,000 |
0 |
0 |
32,500,000 |
|
60001001/
23020114/
06000013 |
System up grading, repairs and maintenance of Automation |
602 |
0 |
0 |
0 |
0 |
1,300,000 |
0 |
0 |
1,300,000 |
|
60001001/
23020118/
06000014 |
Intervention |
606 |
0.00 |
0.00 |
-
|
0 |
225,000,000 |
0 |
0 |
225,000,000 |
|
60001001/
23020118/
06000015 |
Constituency projects for 24 Honourable Members |
602 |
0.00 |
0.00 |
0.00 |
0.00 |
71,500,000 |
0 |
0 |
110,000,000 |
|
|
SUB-TOTAL |
|
0.00 |
0.00 |
0.00 |
16,200,000
|
5,984,600,000 |
0 |
0 |
5,984,600,000 |
|
TOTAL CAPITAL EXPENDITURE MINISTRY OF LANDS, SURVEY AND HOUSING |
1,990,000,000 |
0 |
1,680,000,000 |
46,200,000 |
7,040,100,000 |
200,000,000 |
0 |
7,240,100,000 |
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE SURVEYOR-GENERAL |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
60002001 |
OFFICE OF THE SURVEYOR-GENERAL |
|
|
|
|
|
|
|
|
|
|
HOUSING AND URBAN DEVELOPMENT |
|
|
|
|
|
|
|
|
|
60002001/
23010133/
06000001 |
Procurement of digital survey equipment. |
0601 |
5,000,000
|
0.00 |
10,000,000
|
0 |
6,500,000 |
5,000,000 |
15,000,000 |
26,500,000 |
|
60002001/
23030118/
06000002 |
Digitalization and upgrading of Analogue Maps/plans in Abakaliki. |
0601 |
0.00 |
0.00 |
5,000,000
|
0 |
9,750,000 |
3,000,000 |
10,000,000 |
22,750,000 |
|
60002001/
23030118/
06000003 |
Digital Mapping of Ebonyi State and densification/establishment of control in
Abakaliki, Onueke and Afikpo. |
0601 |
0.00 |
0.00 |
20,000,000
|
0.00 |
13,000,000 |
10,000,000 |
5,000,000 |
28,000,000 |
|
60002001/
23030118/
06000004 |
Perimeter/Percellation/survey of newly acquired areas in Abakaliki. |
0601 |
0.00 |
0.00 |
15,000,000
|
0.00 |
16,250,000 |
5,000,000 |
0 |
21,250,000 |
|
TOTAL CAPITAL EXPENDITURE, OFFICE OF THE SURVEYOR-GENERAL |
5,000,000
|
0 |
50,000,000
|
0.00 |
45,500,000 |
23,000,000 |
30,000,000 |
98,500,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE HOUSING DEVELOPMENT CORPORATION |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
60010001 |
EBONYI STATE HOUSING DEVELOPMENT CORPORATION |
|
|
|
|
|
|
|
|
HOUSING AND URBAN DEVELOPMENT |
|
|
|
|
|
|
|
|
|
60010001/
23020102/
06000001 |
Development of Housing Scheme across the State. |
602 |
0.00 |
0 |
184,230,000 |
0 |
130,000,000 |
70,000,000 |
15,000,000 |
215,000,000 |
|
TOTAL CAPITAL EXPENDITURE, EBONYI STATE HOUSING DEVELOPMENT CORPORATION |
0.00 |
0.00 |
184,865,000 |
0.00 |
130,000,000 |
70,000,000 |
15,000,000 |
215,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF POWER AND ENERGY |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
61003001 |
MINISTRY OF POWER |
|
|
|
|
|
|
|
|
|
|
61003001/
23020103/
14000001 |
Construction/Completion of Traffic and Street lights in Abakaliki Urban. |
1404 |
1,000,000,000
|
207,435,094.32
|
250,000,000 |
199,381,146
|
650,000,000 |
100,000,000 |
80,000,000 |
1,180,000,000 |
|
61003001/
23020103/
14000002 |
Completion of street lights on CBN Road at
Centinary City. |
1404 |
27,000,000 |
17,550,000
|
18,200,000 |
0 |
0 |
18,200,000 |
|
61003001/
23020103/
14000003 |
Construction of street light at Centinary City, |
1404 |
60,000,000 |
54,000,000
|
13,000,000 |
0 |
0 |
13,000,000 |
|
61003001/
23020103/
14000004 |
Completion of External Electrical works at Centinary and International market. |
1404 |
200,000,000
|
0.00 |
50,000,000
|
0.00 |
325,000,000 |
0 |
0 |
325,000,000 |
|
61003001/
23020103/
14000005 |
Completion of Mile 50 Nwezenyi to Oferekpe 33KVA line and Construction of 2 bays
at Mile 50 to provide Electricity to 3 Rice Mills, FUNAI and Ezzangbo Industrial
Estate. |
1402 |
20,000,000
|
0.00 |
70,000,000
|
49,492,104
|
65,000,000 |
0 |
0 |
65,000,000 |
|
61003001/
23020103/
14000006 |
Advocacy and Enlightenment outreaches on the Ministry's programmes |
1400 |
0.00 |
0.00 |
0.00 |
0.00 |
1,300,000 |
0 |
0 |
1,300,000 |
|
61003001/
23050108/
14000007 |
Consultancy Services on Electricity. |
1402 |
50,000,000
|
42,000,000
|
12,000,000
|
3,000,000
|
13,000,000 |
30,000,000 |
25,000,000 |
75,000,000 |
|
61003001/
23050103/
14000008 |
Project monitoring and Evaluation of projects. |
1402 |
0 |
0 |
18,000,000 |
0 |
13,000,000 |
75,000,000 |
50,000,000 |
138,000,000 |
|
61003001/
23020103/
14000009 |
Completion of the ongoing electricity to 55Nos communities in Ebonyi North. |
1402 |
0.00 |
0.00 |
15,000,000
|
0.00 |
13,000,000 |
5,000,000
|
0.00 |
18,000,000 |
|
|
SUB-TOTAL |
|
1,270,000,000
|
249,435,094.32
|
560,000,000 |
323,423,250
|
1,111,500,000 |
210,000,000 |
155,000,000 |
2,075,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF POWER AND ENERGY |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
61003001 |
MINISTRY OF POWER |
|
|
|
|
|
|
|
|
|
|
61003001/
23020103/
14000010 |
Completion of the ongoing electricity to 55Nos communities in Ebonyi Central. |
1402 |
0.00 |
0.00 |
0.00 |
0.00 |
32,500,000 |
0.00 |
0.00 |
32,500,000 |
|
61003001/
23020103/
14000011 |
Completion of the ongoing electricity to 60Nos communities in Ebonyi South. |
1402 |
0.00 |
0.00 |
0.00 |
0.00 |
13,000,000 |
0.00 |
0.00 |
13,000,000 |
|
61003001/
23020103/
14000012 |
Rural Electrification projects in Ebonyi North, South and Central. |
1402 |
0.00 |
0.00 |
480,000,000
|
10,225,477.22
|
390,000,000 |
250,000,000 |
200,000,000 |
1,050,000,000 |
|
61003001/
23020124/
14000013 |
Completion of Power Plant at Ikwo (5MW Rice Husk) UNIDO |
1402 |
0.00 |
0.00 |
30,000,000
|
0.00 |
32,500,000 |
50,000,000 |
0 |
100,000,000 |
|
61003001/
23020103/
14000014 |
Construction of Electrical Warehouse at Centenary City |
1402 |
0.00 |
0.00 |
0.00 |
24,195,929
|
65,000,000 |
0 |
0 |
65,000,000 |
|
61003001/
23020124/
14000015 |
Completion of the Installation of Local Area Networks by Secure Network LTd. |
1402 |
0.00 |
0.00 |
0.00 |
0.00 |
121,584,331.70 |
0 |
0 |
121,584,332 |
|
61003001/
23020103/
14000016 |
Installation of 5No. Closed Circult TV at Abakaliki Urban for Security |
1402 |
0.00 |
0.00 |
0.00 |
0.00 |
4,225,000 |
0 |
0 |
4,225,000 |
|
61003001/
23020103/
14000017 |
Extension of Streets light in Ebonyi State. |
1402 |
0.00 |
0.00 |
0.00 |
0.00 |
650,000,000 |
150,000,000 |
50,000,000 |
1,200,000,000 |
|
61003001/
23020103/
14000018 |
Renewable Energy supply: Construction of Solar Street light in 140Nos.
Communitites across the State. |
1402 |
0.00 |
0.00 |
0.00 |
0.00 |
455,000,000 |
0 |
0 |
455,000,000 |
|
|
SUB-TOTAL |
|
0.00 |
0.00 |
510,000,000
|
34,421,406.22
|
1,763,810,331.70 |
450,000,000 |
250,000,000 |
2,463,810,332 |
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF POWER AND ENERGY |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
61003001 |
MINISTRY OF POWER |
|
|
|
|
|
|
|
|
|
|
61003001/
23020103/
14000019 |
Abakaliki Power Plant (Biomass) |
1402 |
0.00 |
0.00 |
0.00 |
0.00 |
325,000,000 |
-
|
0.00 |
325,000,000 |
|
61003001/
23020103/
14000020 |
Construction of 3No. Biomass Power Plants (5.5MW each) |
1402 |
0.00 |
0.00 |
0.00 |
0.00 |
975,000,000 |
0.00 |
0.00 |
975,000,000 |
|
61003001/
23020103/
14000021 |
Gasification Power Plant 1 MWt 500KW |
1402 |
0.00 |
0.00 |
0.00 |
0.00 |
195,000,000 |
0.00 |
0.00 |
195,000,000 |
|
61003001/
23020103/
14000022 |
Purchase of Solar Stud Rod |
1402 |
0.00 |
0.00 |
0.00 |
0.00 |
32,500,000 |
0 |
0 |
32,500,000 |
|
61003001/
23020124/
14000023 |
Purchase and Installations of 50KW Solar Power System at General Hospitals |
1402 |
0.00 |
0.00 |
0.00 |
0.00 |
16,250,000 |
0 |
0 |
16,250,000 |
|
61003001/
23020103/
14000024 |
Purchase and Installations of 50KW Solar Power System at EBSU |
1402 |
0.00 |
0.00 |
0.00 |
0.00 |
16,250,000 |
0 |
0 |
16,250,000 |
|
61003001/
23020124/
14000025 |
Development of Coal Plant |
1402 |
0.00 |
0.00 |
0.00 |
0.00 |
65,000,000 |
0 |
0 |
65,000,000 |
|
61003001/
23020103/
14000026 |
Rehabilitation of Fire Service Stations in the State. |
0914 |
0.00 |
0.00 |
30,000,000
|
17,000,000
|
32,500,000 |
80,000,000 |
20,000,000 |
150,000,000 |
|
|
SUB-TOTAL |
|
0.00 |
0.00 |
30,000,000
|
17,000,000
|
1,657,500,000 |
80,000,000 |
20,000,000 |
2,650,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF POWER AND ENERGY |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
61003001 |
MINISTRY OF POWER |
|
|
|
|
|
|
|
|
|
|
61003001/
23020103/
14000027 |
Procurement of 7No. Fire fighting Engines and Equipment |
0914 |
0.00 |
0.00 |
0.00 |
0.00 |
26,000,000 |
15,000,000 |
10,000,000 |
51,000,000 |
|
61003001/
23020103/
14000028 |
Procurement of Office Furniture and Equipment |
0914 |
0.00 |
0.00 |
0.00 |
0.00 |
3,250,000 |
0 |
0 |
3,250,000 |
|
61003001/
23020103/
14000029 |
Procurement of 3No. Project Vehicles. |
0914 |
0.00 |
0.00 |
0.00 |
0.00 |
292,500,000 |
0 |
0 |
292,500,000 |
|
61003001/
23020103/
14000030 |
Constituency projects to 24 Honourable members of the House. |
0914 |
0.00 |
0.00 |
0.00 |
0.00 |
71,500,000 |
0 |
0 |
71,500,000 |
|
|
SUB-TOTAL |
|
0.00 |
0.00 |
0.00 |
0.00 |
393,250,000 |
15,000,000 |
10,000,000 |
418,250,000 |
|
TOTAL CAPITAL EXPENDITURE, MINISTRY OF POWER |
1,270,000,000
|
249,435,094.32
|
1,185,000,000 |
374,844,656.22 |
4,925,860,331.70 |
755,000,000 |
435,000,000 |
8,367,052,818 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WATER RESOURCES |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
61054001 |
MINISTRY OF WATER RESOURCES |
|
|
|
|
|
|
|
|
|
|
WATER RESOURCES AND RURAL DEVELOPMENT |
|
|
|
|
|
|
|
|
61054001/
23020105/
10000001 |
Construction of Ivo Water Scheme project. |
1003 |
0 |
0 |
800,000,000 |
385,510,000 |
325,000,000 |
500,000,000 |
0 |
825,000,000 |
|
61054001/
23020105/
10000002 |
Water supply to EBSU Permanent site, Ezzamgbo; CHS & CAS. |
1002 |
141,000,000 |
3,000,000 |
50,000,000 |
0 |
32,825,000 |
0 |
0 |
50,000,000 |
|
61054001/
23010141/
10000003 |
Procurement of water treatment chemicals, laboratory equipments and reagents. |
1002 |
500,000,000 |
0 |
100,000,000 |
10,000,000 |
65,000,000 |
300,000,000 |
500,000,000 |
865,000,000 |
|
61054001/
23020105/
10000004 |
Relaying of water pipelines in Abakaliki metropolis. |
1002 |
500,000,000 |
12,000,000 |
200,000,000 |
40,000,000 |
65,000,000 |
500,000,000 |
500,000,000 |
1,065,000,000 |
|
61054001/
23030105/
10000005 |
Rehabilitation/maintenance of Water Schemes: Ogberehi, Uburu, Akaeze, Old
Abakaliki, Ezillo, Unwanna. |
1002 |
1,200,000,000 |
0 |
900,000,000 |
0 |
975,000,000 |
500,000,000 |
300,000,000 |
1,775,000,000 |
|
61054001/
23020105/
10000006 |
Further works on Oferekpe to Abakaliki Main transmission pipeline. |
1002 |
1,700,000,000 |
0 |
50,000,000 |
0 |
32,500,000 |
0 |
0 |
32,500,000 |
|
61054001/
23020105/
10000007 |
Further works on Oferekpe Water Treatment plant. Provision of tower, lab etc |
1002 |
100,000,000 |
0 |
300,000,000 |
0 |
325,000,000 |
500,000,000 |
0 |
825,000,000
|
|
61054001/
23050105/
10000008 |
Completion of on-going Water Treatment Plant, Ukawu. |
1002 |
3,000,000,000 |
0 |
300,000,000 |
0 |
650,000,000 |
0 |
500,000,000 |
1,150,000,000 |
|
61054001/
23020105/
10000009 |
Water supply to International Market and Abakaliki capital City. |
1002 |
500,000,000 |
0 |
20,000,000 |
0 |
13,000,000 |
0 |
0 |
13,000,000
|
|
61054001/
23020105/
10000010 |
Construction of 3 Dams at the Rice Milling areas - Iboko, Ikwo and Oso Edda. |
1002 |
0 |
0 |
2,000,000 |
0 |
78,000,000 |
0 |
0 |
78,000,000
|
|
|
SUB-TOTAL |
|
7,641,000,000
|
15,000,000 |
2,722,000,000 |
435,510,000 |
2,268,825,000 |
2,300,000,000 |
1,800,000,000 |
8,040,000,000 |
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WATER RESOURCES |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
61054001 |
MINISTRY OF WATER RESOURCES |
|
|
|
|
|
|
|
|
|
|
WATER RESOURCES AND RURAL DEVELOPMENT |
|
|
|
|
|
|
|
|
61054001/
23020105/
10000011 |
State Wide Water Reticulation pipeline network |
1002 |
2,000,000,000 |
0 |
50,000,000 |
0 |
520,000,000 |
100,000,000 |
200,000,000 |
820,000,000
|
|
61054001/
23020105/
10000012 |
Construction of water Reservoir at Centinary City. |
1002 |
0 |
0 |
50,000,000 |
0 |
65,000,000 |
0 |
0 |
100,000,000
|
|
61054001/
23020105/
10000013 |
Purchase of 3No. Water Tanker. |
1002 |
0 |
0 |
0 |
0 |
65,000,000 |
0 |
0 |
100,000,000
|
|
61054001/
23020105/
10000014 |
Construction of water Reservoir at Centinary City. |
1002 |
0 |
0 |
0 |
0 |
32,500,000 |
0 |
0 |
50,000,000
|
|
61054001/
23020105/
10000015 |
Construction of Water Reservoir at Ikwo College of Education |
1002 |
0 |
0 |
50,000,000 |
0 |
65,000,000 |
50,000,000 |
0 |
150,000,000
|
|
61054001/
23020105/
10000016 |
Reticulation of water in Idda (Isicha Area) Community. |
1002 |
0 |
0 |
0 |
0 |
65,000,000 |
0 |
0 |
100,000,000
|
|
61054001/
23020105/
10000017 |
Laying of water pipeline at Centinary City Abakaliki. |
1002 |
0 |
0 |
33,000,000 |
0 |
65,000,000 |
0 |
0 |
100,000,000
|
|
61054001/
23020105/
10000018 |
Purchase of 1Nos Drilling Rigs. |
1002 |
0 |
0 |
0 |
0 |
100,000,000 |
0 |
0 |
200,000,000
|
|
|
SUB-TOTAL |
|
2,000,000,000 |
0 |
183,000,000 |
0 |
1,292,500,000 |
150,000,000 |
200,000,000
|
1,642,500,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WATER RESOURCES |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
61054001 |
MINISTRY OF WATER RESOURCES |
|
|
|
|
|
|
|
|
|
|
WATER RESOURCES AND RURAL DEVELOPMENT |
|
|
|
|
|
|
|
|
61054001/
23020105/
10000019 |
Drilling of Water Boreholes in each Community in the 13LGAs |
1002 |
0 |
0 |
0 |
0 |
325,000,000 |
0 |
0 |
325,000,000
|
|
61054001/
23020105/
10000020 |
Water Consumer enumeration survey and metering of Houses |
1002 |
0 |
0 |
0 |
0 |
19,500,000 |
0 |
0 |
19,500,000 |
|
61054001/
23020105/
10000021 |
Building of Water Laboratory and equipments |
1002 |
0 |
0 |
0 |
0 |
45,500,000 |
0 |
0 |
45,500,000 |
|
61054001/
23020105/
10000022 |
Water analysis test of Boreholes |
1002 |
0 |
0 |
0 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
61054001/
23020105/
10000023 |
Constituency projects for 24 Honourable Member |
1002 |
0 |
0 |
0 |
0 |
65,000,000 |
0 |
0 |
65,000,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
468,000,000
|
0 |
0 |
468,000,000
|
|
TOTAL CAPITAL EXPENDITURE MINISTRY OF WATER RESOURCES |
9,641,000,000
|
15,000,000
|
2,905,000,000
|
435,510,000
|
4,029,325,000
|
2,450,000,000
|
2,000,000,000
|
8,479,325,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
02 ECONOMIC |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE RURAL WATER SUPPLY AND SANITATION AGENCY (EB-RUWASSA) |
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
61054002 |
EB-RUWASSA |
|
|
|
|
|
|
|
|
|
|
|
WATER RESOURCES AND RURAL DEVELOPMENT |
|
|
|
|
|
|
|
|
61054002/
23020105/
10000001 |
Water Supply
1. Construction of 190No. Hand pump
Borehole in cholera affected communities.
2. Construction of 65No. Motorized
borehole.
3. Construction of 26No. Small Town water scheme
4. Completion of 118No. Drilled boreholes
across the State not yet installed with hand pump accessories. |
1005 |
80,000,000 |
0 |
60,000,000
65,000,000
26,000,000
24,000,000 |
0 |
45,500,000
32,500,000
13,000,000
9,750,000 |
185,500,000
72,000,000
35,000,000
32,500,000
|
190,000,000
74,000,000
41,900,000
39,000,000 |
421,000,000
178,500,000
86,900,000
81,500,000 |
|
61054002/
23010107/
10000002 |
Procurement of 2No. Rigs and compressors. |
1005 |
10,800,000 |
0 |
100,000,000 |
0 |
32,500,000 |
110,000,000 |
115,000,000 |
275,000,000
|
|
61054002/
23010139/
10000003 |
Procurement of Global positioning system equipment. |
1005 |
0 |
0 |
800,000 |
0 |
650,000 |
1,250,000 |
1,500,000 |
3,750,000
|
|
61054002/
23010139/
10000004 |
Procurement of borehole spare parts and components. |
1005 |
0 |
0 |
2,000,000 |
0 |
3,253,250 |
5,100,000 |
5,150,000 |
15,255,000
|
|
61054002/
23030105/
10000005 |
Rehabilitation of 2,503Nos non-functional boreholes across the State. |
1005 |
15,000,000 |
0 |
30,000,000 |
0 |
13,000,000 |
60,000,000 |
65,000,000 |
145,000,000
|
|
61054002/
23010133/
10000006 |
Procurement of survey Equipment |
1005 |
5,000,000 |
0 |
20,000,000 |
0 |
13,000,000 |
0 |
0 |
13,000,000
|
|
61054002/
23030105/
10000007 |
Rehabilitation of Drilling equipment including all field vehicles. |
1005 |
5,000,000 |
0 |
5,000,000 |
0 |
7,150,000 |
13,750,000 |
14,000,000 |
38,750,000
|
|
|
TOTAL CAPITAL EXPENDITURE EB-RUWASSA |
|
120,800,000 |
0 |
532,800,000 |
0 |
170,303,250 |
515,100.000 |
545,550,000 |
1,258,655,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
03 LAW AND JUSTICE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF JUSTICE |
|
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
26001001 |
MINISTRY OF JUSTICE |
|
|
|
|
|
|
|
|
|
|
|
REFROM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
26001001/
23010115/
13000001 |
Procurement of 2No Photocopying Machines (Big) |
1301 |
300,000 |
0 |
0 |
0 |
585,000 |
0 |
0 |
585,000 |
|
26001001/
23010139/
13000002 |
Procurement of 5Nos Air Conditioner. |
1301 |
300,000 |
0 |
0 |
0 |
650,000 |
0 |
0 |
650,000 |
|
26001001/
23010139/
13000003 |
Procurement of 5Nos. Refrigerator |
1301 |
200,000 |
0 |
0 |
0 |
227,500 |
0 |
0 |
227,500 |
|
26001001/
23010125/
13000004 |
Procurement of Law books to equip Ministry's library. |
1301 |
10,000,000 |
0 |
2,000,000 |
0 |
1,300,000 |
0 |
0 |
1,300,000 |
|
26001001/
23050106/
13000005 |
To purchase 1No. Hilux (Toyota). |
1301 |
0 |
0 |
0 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
26001001/
23010112/
13000006 |
Procurement of furniture for furnishing of MOJ Office at Centenary City. |
1301 |
0 |
0 |
0 |
0 |
9,750,000 |
0 |
0 |
9,750,000 |
|
26001001/
23020104/
13000007 |
Construction/Provision of post houses for the seven Judicial Divisions:
v. Ezzangbo
vi. Onueke
vii. Ohaozara |
1301 |
31,500,000 |
0 |
0 |
0 |
3,200,000 |
10,000,000 |
0 |
13,200,000 |
|
|
SUB-TOTAL |
|
42,300,000
|
0 |
2,000,000
|
0 |
30,712,500 |
10,000,000
|
0 |
40,712,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
03 LAW AND JUSTICE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF JUSTICE |
|
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
26001001 |
MINISTRY OF JUSTICE |
|
|
|
|
|
|
|
|
|
|
|
REFROM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
26001001/
23050101/
13000008 |
To publish laws of Ebonyi State and selected landmark, judgments of Court of
Ebonyi State, Federal High Court, Court of Appeal and Supreme Court quarterly. |
1301 |
5,000,000 |
0 |
8,000,000 |
0 |
3,900,000 |
0 |
0 |
3,900,000 |
|
26001001/
23050101/
13000009 |
To collate, streamline and publish all the Customary Laws applicable in Ebonyi
State. |
1301 |
2,000,000 |
0 |
0 |
0 |
195,000 |
0 |
0 |
195,000 |
|
26001001/
23010113/
13000010 |
Procurement of 4Nos Computers. |
1301 |
300,000 |
0 |
0 |
0 |
260,000 |
0 |
0 |
260,000 |
|
26001001/
23010114/
13000011 |
Procurement of 4Nos Computers Printers |
1301 |
0.00 |
0 |
0 |
0 |
156,000 |
0 |
0 |
156,000 |
|
26001001/
23010113/
13000012 |
Procurement of 4Nos UPS and stabilizer. |
|
0.00 |
0 |
0 |
0 |
156,000 |
0 |
0 |
156,000 |
|
|
SUB-TOTAL |
|
7,300,000 |
0 |
8,000,000 |
0 |
4,667,000 |
0 |
0 |
4,667,000 |
|
TOTAL CAPITAL EXPENDITURE, MINISTRY OF JUSTICE |
49,600,000 |
0 |
10,000,000 |
0 |
35,379,500 |
10,000,000 |
0 |
54,430,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
03 LAW AND JUSTICE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
JUDICIARY - HIGH COURT |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
26051001 |
EBONYI STATE HIGH COURTS |
|
|
|
|
|
|
|
|
|
|
|
REFROM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
26051001/
23010112/
13000001 |
Completion/Rehabilitation of:
a. Magristates' Court at Okposi, Afikpo and Uburu.
B. CJ's Court and High Court 1 Abakaliki with adjoining offices. |
1319 |
0.00 |
0.00 |
15,000,000 |
15,000,000 |
19,500,000 |
0 |
0 |
19,500,000 |
|
26051001/
23010112/
13000002 |
Completion/Rehabilitation of:
i. Magistrate's quarters at Afikpo and Onueke.
Ii. Existing Judge's Residential bungalow at Afikpo |
1319 |
0.00 |
0.00 |
15,000,000 |
15,000,000 |
13,000,000 |
0 |
0 |
13,000,000 |
|
26051001/
23010105/
13000003 |
Purchase of vehicles:
a. 7 units (Toyota Prado Jeeps) for 7 Judges.
B. 4 units of Toyoya Avensis for Magristrates, Chief Reg. and 3 Deputy Chief
Registrar. |
1319 |
0.00 |
0.00 |
100,000,000 |
0 |
110,000,000 |
0 |
0 |
110,000,000 |
|
26051001/
23010105/
13000004 |
Sinking of 7No. Motorized water boreholes at the 7 Divions at Abakaliki, Afikpo,
Onueke, Ikwo, Ivo, Ohaozara and Ezzamgbo and motorised reticulation of water. |
1319 |
0 |
0 |
15,000,000 |
0 |
9,750,000 |
12,500,000 |
0 |
27,500,000 |
|
26051001/
23010112/
13000005 |
Purchase of court room furniture and fittings for 8 High Courts at Abakaliki
within the administrative block. |
1319 |
0 |
0 |
18,900,000 |
0 |
10,000,000 |
19,100,000 |
0 |
29,100,000 |
|
26051001/
23010112/
13000006 |
Purchase of 46 nos. laptop computers with e-law reports for Judges, Magistrates
and key functionaries |
1319 |
0 |
0 |
16,100,000 |
0 |
11,765,000 |
0 |
0 |
11,765,000
|
|
|
SUB-TOTAL |
|
0.00 |
0 |
180,000,000
|
30,000,000 |
174,015,000 |
31,600,000 |
0 |
205,615,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
03 LAW AND JUSTICE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
JUDICIARY - HIGH COURT |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL
2017 - 2019 |
|
|
26051001 |
EBONYI STATE HIGH COURTS |
|
|
|
|
|
|
|
|
|
|
|
REFROM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
26051001/
23010112/
13000007 |
Purchase of office furniture and fittings for Judges’ and Magistrates’ chambers
Abakaliki |
1319 |
0.00 |
0.00 |
20,000,000 |
5,601,337.86 |
9,750,000 |
0 |
0 |
9,750,000 |
|
26051001/
23020118/
13000008 |
Construction of Staff canteen at the Judiciary Headquarters Abakaliki. |
1319 |
0.00 |
0.00 |
20,000,000 |
0 |
0 |
5,000,000 |
0 |
5,000,000 |
|
26051001/
23020101/
13000009 |
Construction of 2 Magistrate Court Buildings at Ebonyi and Ishielu LGAs. |
1319 |
0.00 |
0.00 |
30,000,000 |
0 |
19,500,000 |
30,000,000 |
10,000,000 |
70,000,000 |
|
26051001/
23020101/
13000010 |
Construction of:
a. High Court building at Isiaka, Ivo LGA.
B. Mag. Court building at Iboko, Edda, Onicha, Ikwo and Akaeze. |
1319 |
0.00 |
0.00 |
0 |
0 |
32,500,000 |
30,000,000 |
20,000,000 |
100,000,000 |
|
26051001/
23020101/
13000011 |
Construction of one storey building housing Ceremonial Court
hall and one High Court at Jud. Headquarters, Abakaliki. |
1319 |
0 |
0 |
0 |
0 |
14,245,000 |
20,000,000
|
10,000,000 |
70,000,000 |
|
26051001/
23020102/
13000012 |
Asphalting of the entire Judiciary premises at Abakaliki |
1319 |
0.00 |
0.00 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
5,601,337.86 |
75,985,000 |
85,000,000 |
40,000,000 |
200,985,000
|
|
|
TOTAL CAPITAL EXPENDITURE HIGH COURT |
0 |
0 |
250,000,000
|
35,601,337.86 |
250,000,000
|
116,600,000 |
40,000,000
|
406,600,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
03 LAW AND JUSTICE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
CUSTOMARY COURT OF APPEAL |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
26052001 |
CUSTOMARY COURT OF APPEAL |
|
|
|
|
|
|
|
|
|
|
REFROM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
26052001/
23010104/
13000001 |
Purchase of 6 Nos motorcycle for (2 per zone) in the Headquarters Abakaliki |
1301 |
0 |
0 |
900,000 |
0 |
975,000 |
0 |
0 |
975,000 |
|
26052001/
23010105/
13000002 |
Purchase of 1 Nos Toyota camry for CR |
1301 |
0 |
0 |
21,000,000 |
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
26052001/
23010105/ 13000003 |
Construction of 7No. Court hall at Ezza South, Onicha, Ivo, Ebonyi, Afikpo
South, Ohaozara and Ikwo LGAs |
1301 |
0 |
0 |
0 |
0 |
5,375,000 |
0 |
0 |
5,375,000 |
|
26052001/
23020105/ 13000004 |
Purchase of 2 Nos Hilux vehicle for inspectorate division and office of the CR
at Abakaliki |
1301 |
0 |
0 |
16,000,000 |
0 |
0 |
0 |
0 |
-
|
|
26052001/
23020105/ 13000005 |
Purchase of 2 Prado Jeeps for 2 Judges. |
1301 |
0 |
0 |
15,000,000 |
0 |
58,500,000 |
0 |
0 |
58,500,000
|
|
26052001/
23010105/ 13000006 |
Rehabilitation of court halls in Ohaozara (Ugwulangwu) |
1301 |
0 |
0 |
0 |
0 |
1,950,000 |
0 |
5,000,000 |
6,950,000 |
|
26052001/
23010105/ 13000007 |
Purchase of office furniture and fittings, tables, seats and cabinet shelves in
Abakaliki, Ohaukwu, Ikwo, and Onicha. |
1301 |
0 |
0 |
20,000,000 |
10,274,268.18 |
3,200,000 |
0 |
0 |
3,200,000 |
|
TOTAL CAPITAL EXPENDITURE CUSTOMARY COURT OF APPEAL |
0 |
0 |
72,900,000 |
10,274,268.18 |
80,000,000 |
0 |
5,000,000 |
85,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
03 LAW AND JUSTICE |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
JUDICIAL SERVICE COMMISSION |
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
18011001 |
JUDICIAL SERVICE COMMISSION |
|
|
|
|
|
|
|
|
|
|
REFROM OF GOVERNMENT AND GOVERNANCE |
|
|
|
|
|
|
|
|
18011001/
23020116/
13010001 |
Construction/landscaping drainage of office premises |
1301 |
0 |
0 |
5,000,000 |
0 |
0 |
11,000,000 |
12,100,000 |
23,100,000 |
|
18011001/
23010134/
13010002 |
Rehabilitation of office buildings (Re-roofing) |
1301 |
0 |
2,708,333.34 |
5,000,000 |
2,708,333.34 |
6,500,000 |
16,500,000 |
17,000,000 |
40,000,000 |
|
18011001/
23020112/
13010003 |
Purchase of office furniture and fittings |
1301 |
0 |
0.00 |
0 |
0 |
3,250,000 |
22,000,000 |
24,200,000 |
49,450,000 |
|
18011001/
23010130/
13010004 |
Purchase of 5No book shelves |
1301 |
0 |
0 |
900,000 |
900,000 |
650,000 |
2,200,000 |
2,400,000 |
5,250,000 |
|
18011001/
23010105/
13010005 |
Purchase 1 No official monetized vehicle Toyota Avensis saloon cars for
appointed chairman of the commission |
1301 |
0 |
0 |
14,000,000 |
0 |
8,000,000 |
29,700,000 |
32,400,000 |
70,100,000 |
|
18011001/
23010130/
13010006 |
Repair of Electrical equipment |
1302 |
0 |
0 |
0 |
0 |
1,300,000 |
0 |
0 |
1,300,000 |
|
18011001/
23020116/
13010007 |
Rehabilitation/Repair of motorised borehole |
1301 |
0 |
2,708,333.34 |
3,500,000 |
1,354,166.67 |
1,300,000 |
19,800,000 |
21,600,000 |
42,700,000 |
|
TOTAL CAPITAL EXPENDITURE JUDICIAL SERVICE COMMISSION |
0 |
5,416,666.68
|
28,400,000 |
4,962,500.01
|
20,000,000 |
101,200,000 |
109,700,000 |
231,900,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
04 REGIONAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
ABAKALIKI CAPITAL TERRITORY DEV., BOARD |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
63001001 |
ABAKALIKI CAPITAL TERRITORY DEV., BOARD |
|
|
|
|
|
|
|
|
|
HOUSING AND URBAN DEVELOPMENT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
63001001/
23050108/
06000001 |
Continuation of the preparation of Master Plan for Capital Territory |
601 |
250,000,000 |
0 |
250,000,000 |
0 |
97,500,000 |
50,000,000 |
0 |
147,500,000 |
|
63001001/
23050108/
06000002 |
Purchase of official vehicles 2 Nos: Toyota Hilux van |
601 |
0 |
0 |
22,000,000 |
0 |
20,000,000 |
0 |
0 |
20,000,000 |
|
63001001/
23010106/
06000003 |
Purchase of 3No photocopying machine |
601 |
|
|
|
0 |
320,000 |
0 |
0 |
320,000 |
|
63001001/
23050108/
06000004 |
Purchase of 6 No steel cabinet |
601 |
|
|
|
0 |
300,000 |
0 |
0 |
300,000 |
|
63001001/
23020104/
06000005 |
Purchase of 3No. of Motor cycle for zonal
inspectors. |
601 |
0 |
0 |
840,000 |
0 |
450,000 |
0 |
0 |
450,000 |
|
63001001/
23020105/
06000006 |
Construction of Borehole, overhead tanks and reticulation of water to office
toilets |
601 |
0 |
0 |
0 |
0 |
650,000 |
0 |
0 |
650,000 |
|
63001001/
23010139/
06000007 |
Purchase of 4Nos Refrigeration For Board Offices |
601 |
0 |
0 |
0 |
0 |
360,000 |
0 |
0 |
360,000 |
|
|
SUB-TOTAL |
|
250,000,000 |
0 |
273,590,000 |
0 |
119,580,000 |
50,000,000 |
0 |
252,870,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
04 REGIONAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
ABAKALIKI CAPITAL TERRITORY DEV., BOARD |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
63001001 |
ABAKALIKI CAPITAL TERRITORY DEV., BOARD |
|
|
|
|
|
|
|
|
|
HOUSING AND URBAN DEVELOPMENT |
|
|
|
|
|
|
|
|
|
63001001/
23010139/
06000008 |
Purchase of 8Nos of Air conditions for Board |
601 |
0 |
0 |
0 |
0 |
390,000 |
0 |
0 |
390,000 |
|
63001001/
23030114/
06000009 |
Heritage preservation construction of earth road around Juju Hill. |
601 |
0 |
0 |
10,000,000 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
63001001/
23030129/
06000010 |
Repair of pail loader given to ACTDB by Ministry of Works and Transport |
601 |
0 |
0 |
|
0 |
3,250,000 |
0 |
0 |
3,250,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
10,000,000
|
0 |
16,640,000 |
0 |
0 |
16,640,000 |
|
TOTAL CAPITAL BUDGET ABAKALIKI CAPITAL TERRITORY DEV. BOARD |
257,000,000 |
0 |
321,590,000 |
0 |
136,220,000 |
50,000,000 |
0 |
278,470,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF YOUTH DEVELOPMENT AND SPORTS |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
13001001 |
MINISTRY OF YOUTH DEVELOPMENT AND SPORTS |
|
|
|
|
|
|
|
|
|
YOUTH |
|
|
|
|
|
|
|
|
|
|
13001001/
23010115/
08000001 |
Painting and Decoration of wall (Mural art work and fencing of Abakaliki stadium
- EBOTRANS Hqtrs through Amusement Park, Ezza Road to Presco Junection. |
801 |
0 |
0 |
0 |
12,000,000 |
6,500,000 |
0 |
0 |
6,500,000 |
|
13001001/
23020112/
08000002 |
Construction of Mega Stadium at Centenary City. |
801 |
100,000,000 |
0 |
500,000,000 |
0 |
325,000,000 |
20,000,000 |
10,000,000 |
345,000,000 |
|
13001001/
23010115/
08000003 |
Rehabilitation of Sporting facilities such as table tennis court Badminton,
Volley ball court etc. at 27 Pilot schools |
|
|
|
|
|
65,000,000 |
0 |
0 |
65,000,000 |
|
13001001/
23010126/
08000004 |
Purchase of Sports Equipment such as
Volley ball, short put for 27 Pilot Schools. |
801 |
0 |
0 |
0 |
0 |
8,775,000 |
20,000,000 |
10,000,000 |
38,775,000 |
|
13001001/
23010126/
08000005 |
Purchase of Sports Equipment for Girls Technical College Agba football, table
tennis & javilin, discasshotput huddle stand etc. |
801 |
0 |
0 |
0 |
0 |
3,250,000 |
10,000,000 |
5,000,000 |
18,250,000 |
|
13001001/
23010119/
08000006 |
Cover stand at Abakaliki Stadium. |
801 |
0 |
0 |
0 |
0 |
42,250,000 |
0 |
0 |
42,250,000 |
|
13001001/
23010126/
08000007 |
Rehabilitation of facilities such as Multi-Purpose Hall, Security House,
Entrance gate at NYSC Orientation Camp, Afikpo. |
801 |
0 |
0 |
0 |
0 |
52,000,000 |
0 |
0 |
52,000,000 |
|
13001001/
23010119/
08000008 |
Purchase of 1No. Hiace Bus |
801 |
0 |
0 |
0 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
13001001/
23010119/
08000009 |
Purchase of 1No. Generating Set. |
801 |
0 |
0 |
0 |
0 |
5,000,000 |
50,000 |
10,000 |
8,060,000 |
|
TOTAL CAPITAL EXPENDITURE, MINISTRY OF YOUTH DEVELOPMENT AND SPORTS |
125,000,000 |
0 |
500,000,000 |
12,000,000 |
522,775,000 |
50,050,000 |
25,010,000 |
590,835,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE SPORTS COUNCIL |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
13051001 |
EBONYI STATE SPORTS COUNCIL |
|
|
|
|
|
|
|
|
|
|
ENHANCING SKILLS AND KNOWLEDGE |
|
|
|
|
|
|
|
|
|
13051001/
23010112/
05000001 |
Construction of hostel for camping in the studium |
517 |
0.00 |
0.00 |
50,000,000
|
0.00 |
0 |
0 |
0 |
0 |
|
13051001/
23020128/
05000002 |
Construction of Gymnasium |
517 |
5,000,000 |
0.00 |
24,550,000
|
0 |
0 |
0 |
0 |
0 |
|
13051001/
23010112/
05000003 |
Purchase of sports/game equipment |
517 |
|
|
5,000,000
|
0.00 |
0 |
0 |
0 |
0 |
|
13051001/
23010114/
05000004 |
Purchase of (1)No Bus |
517 |
100,000 |
0.00 |
15,000,000
|
0 |
0 |
0 |
0 |
0 |
|
13051001/
23010115/
05000005 |
Purchase of (1)No Computer set. |
517 |
100,000
|
0.00 |
100,000,000
|
0 |
0 |
0 |
0 |
0 |
|
TOTAL CAPITAL EXPENDITURE, EBONYI STATE SPORTS COUNCIL |
5,200,000 |
0 |
194,550,000 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WOMEN AFFAIRS AND SOCIAL DEVELOPMENT |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
14001001 |
MINISTRY OF WOMEN AFFAIRS AND SOCIAL DEVELOPMENT |
|
|
|
|
|
|
|
|
GENDER |
|
|
|
|
|
|
|
|
|
|
14001001/
23020102/
07000001 |
Construction of 6Nos 1 bedroom Self- contain flat with big dinning Hall and
Kitchen for Social Welfare Shelter. To serve as a stop over or temporary home
for repatriated or lost and found persons.
|
0713 |
0.00 |
0.00 |
20,000,000
|
0 |
13,000,000 |
20,000,000 |
10,000,000 |
80,000,000 |
|
14001001/
23010112/
07000002 |
Furnishing/equiping of 6 class Room Blocks for Creches for Nursing Mothers at
the Centenary City. |
0713 |
0 |
0 |
0 |
0 |
3,250,000 |
20,000,000 |
20,000,000 |
45,000,000 |
|
14001001/
23020118/
07000003 |
Completion of Fencing of the whole of the Ministry's Land at Remand Home,
Ugwuachara for security of the inmates and to avoid encroachment to the land. |
0713 |
0.00 |
0.00 |
30,000,000
|
0 |
6,500,000 |
20,000,000 |
20,000,000 |
60,000,000 |
|
14001001/
23020102/
07000004 |
Construction of Staff Quarters in the Rehabilitation Centre at Mile 50 for close
supervision of the trainees
i. Staff Quarters (5Nos. 2 bedroom
self-contain Flat)
ii. Kitchen
iii. Dinning Hall |
0713 |
0 |
0 |
20,000,000 |
0 |
13,000,000 |
20,000,000 |
20,000,000 |
60,000,000 |
|
14001001/
23020118/
07000005 |
Assiting the LGAs in Equipping of 3 Women Skill Acquisition Centres, 1 per
Senatorial Zone. Purchase of 20 Sewing Machines, 20 Dryers, 50 packet of
Chemicals for detergent, 30 Chairs, 10 Kneading Machines. |
0702 |
0 |
0 |
6,000,000 |
0 |
3,900,000 |
6,000,000 |
6,000,000 |
15,900,000 |
|
|
SUB-TOTAL |
|
0.00 |
0 |
76,000,000
|
0 |
39,650,000 |
66,000,000 |
56,000,000 |
320,000,000 |
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WOMEN AFFAIRS AND SOCIAL DEVELOPMENT |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
14001001 |
MINISTRY OF WOMEN AFFAIRS AND SOCIAL DEVELOPMENT |
|
|
|
|
|
|
|
|
GENDER |
|
|
|
|
|
|
|
|
|
|
14001001/
23020118/
07000006 |
Establishment of Tuck Shop at Centenary City to general IGR
i. Construction of Kiosk
ii. Selling of provision
iii. Snacks and Minerals
iv. Fast Foods
v. Stationeries
vi. Computer consumables etc. |
0702 |
0.00 |
0.00 |
|
0 |
26,000,000 |
40,000,000 |
40,000,000 |
106,000,000 |
|
14001001/
23020118/
07000007 |
State Government Empowerment for Women/ Ebonyi Women's Day Celebration. |
0705 |
0.00 |
0.00 |
80,000,000 |
15,000,000 |
130,000,000 |
200,000,000 |
200,000,000 |
530,000,000 |
|
14001001/
23020118/
07000008 |
Empowerment of Destitute, Orphans and Vulnerable Children and their Caregivers. |
0712 |
0.00 |
0.00 |
4,000,000 |
0 |
6,500,000 |
10,000,000 |
10,000,000 |
26,500,000 |
|
14001001/
23020118/
07000009 |
Construction of 3Nos. Of Soak Away Pits at Drop-in-Centre, Onueke, Ezza South
LGA. |
0713 |
5,500,000 |
0.00 |
5,000,000 |
0 |
3,250,000 |
2,000,000 |
2,000,000 |
7,250,000 |
|
14001001/
23010119/
07000010 |
Purchase of one 10KVA Stand Alone Generator Set to serve Youth Resource Centre,
Remand Home and Rehabilitation Centre. |
713 |
3,500,000 |
0.00 |
200,000 |
0 |
3,250,000 |
1,000,000 |
1,000,000 |
2,600,000 |
|
14001001/
23010129/
07000011 |
Equipping of the Skills Acquisition Centre at Remand Home:
i. Purchase of Learning Aids
ii. Purchase of Catering Equipment.
Iii. Barbing, Phone Repair, Shoe making and Hair Dressing Equipment etc. |
0713 |
5,000,000 |
0 |
0 |
0 |
1,300,000 |
1,000,000 |
- |
2,300,000 |
|
14001001/
23050104/
07000012 |
Government Counterpart Fund for Micro, Small and Medium Enterprise Development
Fund (MSMEDF) Scheme for Women. |
0705 |
0 |
0 |
0 |
0 |
32,500,000 |
10,000,000 |
10,000,000 |
52,500,000 |
|
|
SUB-TOTAL |
|
|
|
|
|
261,300,000 |
263,000,000
|
262,000,000
|
727,150,000 |
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WOMEN AFFAIRS AND SOCIAL DEVELOPMENT |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
14001001 |
MINISTRY OF WOMEN AFFAIRS AND SOCIAL DEVELOPMENT |
|
|
|
|
|
|
|
|
GENDER |
|
|
|
|
|
|
|
|
|
|
14001001/
23050104/
07000013 |
Construction and furnishing of 6 class room blocks for Creches for Nursing
mothers at the Centenary city. |
|
|
|
|
|
3,250,000 |
|
|
3,250,000 |
|
14001001/
23050104/
07000014 |
The Creches at the Centenary City. |
|
0 |
0 |
0 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
14001001/
23010108/
07000015 |
Purchase of 1No. Coaster Bus |
0713 |
0 |
0 |
10,000,000 |
0 |
20,000,000 |
0 |
0 |
13,000,000 |
|
14001001/
23020118/
07000016 |
Re-equipping of the Remand Home:
i. Mattresses
ii. Beds & Deddings
iii. Televisions, Refrigerators, Recreational facilities. |
0713 |
0 |
0 |
0 |
0 |
25,500,000 |
0 |
0 |
25,500,000 |
|
14001001/
23030118/
07000017 |
Renovation, Expansion of the Remand Home and Landscaping |
0713 |
0 |
0 |
0 |
0 |
3,250,000 |
0 |
0 |
3,250,000 |
|
14001001/
23020118/
07000018 |
Support assistance to Orphans and Vulnerable Children |
0713 |
0 |
0 |
0 |
0 |
3,250,000 |
5,000,000 |
5,000,000 |
13,250,000 |
|
|
SUB-TOTAL |
|
|
|
|
|
71,500,000 |
5,000,000 |
5,000,000
|
81,500,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF WOMEN AFFAIRS AND SOCIAL DEVELOPMENT |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
14001001 |
MINISTRY OF WOMEN AFFAIRS AND SOCIAL DEVELOPMENT |
|
|
|
|
|
|
|
|
GENDER |
|
|
|
|
|
|
|
|
|
|
14001001/
23020118/
07000019 |
Construction of Gate House with convenience and shower at the Drop-in Centre,
Izzikworo, Ezza South LGA |
0713 |
0 |
0 |
0 |
0 |
6,500,000 |
30,000,000 |
30,000,000 |
66,500,000 |
|
14001001/
23020118/
07000020 |
Construction of Drop-in Centre at Ezza South LGA and take-off grants for the
Centre |
0713 |
0 |
0 |
0 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
|
|
13,000,000 |
30,000,000 |
30,000,000 |
73,000,000 |
|
TOTAL CAPITAL EXPENDITURE, MINISTRY OF WOMEN AFFAIRS AND SOCIAL DEVELOPMENT |
|
|
|
|
385,450,000
|
364,000,000 |
353,000,000 |
1,102,450,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE SPECIAL ASSISTANTS TO THE GOVERNOR ON WOMEN & CHILD DEV. (NORTH,
SOUTH & CENTRAL) |
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
14002001 |
OFFICE OF THE SPECIAL ASSISTANTS TO THE GOVERNOR ON WOMEN & CHILD DEV. (NORTH,
SOUTH & CENTRAL) |
|
|
|
|
|
|
|
|
|
|
|
GENDER |
|
|
|
|
|
|
|
|
|
|
14002001/
23020118/
07000001 |
Procurement of 1Nos Hilux Pick-up for the three SA's @ N15,000,000 each |
0713 |
0 |
0 |
0 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
14002001/
23020118/
07000002 |
Office furniture and equipments for the 3 SA's |
0713 |
0 |
0 |
0 |
0 |
9,750,000 |
0 |
0 |
9,750,000 |
|
14002001/
23020118/
07000003 |
Flag off of the programme on indegent/vulnerable women and children |
0713 |
0 |
0 |
0 |
0 |
23,400,000 |
0 |
0 |
23,400,000 |
|
14002001/
23020118/
07000004 |
Launching of a mentorship program for young people (inspiring the young
generation programme) |
0713 |
0 |
0 |
0 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
14002001/
23020118/
07000005 |
Sensitization programme on female genital mutilation at zonal & LGA levels |
0713 |
0 |
0 |
0 |
0 |
19,500,000 |
0 |
0 |
19,500,000 |
|
14002001/
23020118/
07000006 |
Girl Child progammes |
0713 |
0 |
0 |
0 |
0 |
3,250,000 |
0 |
0 |
3,250,000 |
|
TOTAL CAPITAL EXPENDITURE OFFICE OF SA's TO THE GOVERNOR ON WOMEN AND CHILD DEV. |
0 |
0 |
0 |
0 |
77,400,000 |
0 |
0 |
77,400,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE RELIGIOUS WELFARE OF EBONYI STATE |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
11021007 |
OFFICE OF THE RELIGIOUS WELFARE OF EBONYI STATE |
|
|
|
|
|
|
|
|
NEEDY/SICK/POOR/CLERGY/WIDOWS |
|
|
|
|
|
|
|
|
|
11021004/
23020106/
13000001 |
Medical Intervention to indegent citizens through religious bodies. |
0713 |
0 |
0 |
0 |
0 |
468,000,000 |
0 |
0 |
468,000,000 |
|
TOTAL CAPITAL EXPENDITURE, OFFICE OF THE RELIGIOUS WELFARE OF EBONYI STATE |
|
|
|
|
468,000,000
|
-
|
-
|
468,000,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF EDUCATION |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
17001001 |
MINISTRY OF EDUCATION |
|
|
|
|
|
|
|
|
|
|
|
ENHANCING SKILLS AND KNOWLEDGE |
|
|
|
|
|
|
|
|
|
17001001/
23010112/
05000001 |
Procurement of secondary school furniture (desks) in 221 Secondary Schools
(SESOP) |
508 |
0.00 |
0.00 |
0.00 |
0 |
224,750,000 |
10,000,000 |
5,000,000 |
239,750,000 |
|
17001001/
23010113/
05000002 |
Provision of (60) Desktop, computers and
internet facilities (Satelite Dish, cables and subscription) at EMIS unit and 6
Educational Zones. |
517 |
40,000,000
|
0.00 |
30,000,000
|
0 |
200,000,000 |
20,000,000 |
10,000,000 |
230,000,000 |
|
17001001/
23010124/
05000003 |
Production of 5000 school census booklet and conduct of school census exercise
for 2016/2017. |
501 |
10,000,000
|
0.00 |
10,000,000
|
0 |
20,000,000 |
1,500,000 |
500,000 |
22,000,000 |
|
17001001/
23010124/
05000004 |
Procurement of science equipment (Barometers, Spectrometers, Human-skeletons
etc) for 221 Secondary Schools in the State (SESOP) |
505 |
30,000,000
|
0.00 |
30,000,000
|
0 |
60,000,000 |
30,000,000 |
20,000,000 |
110,000,000 |
|
17001001/
23010125/
05000005 |
Procurement of Library equipment (Cabinet shelf, catalogue, cabinet box,
standard book shelf etc) for schools and MOE headquarters (SESOP) |
512 |
30,000,000
|
0.00 |
20,000,000
|
0 |
20,000,000 |
20,000,000 |
10,000,000 |
50,000,000 |
|
17001001/
23030107/
05000006 |
Renovation of 10 Buildings for National Open University (NOUN) students. |
516 |
20,000,000
|
0.00 |
20,000,000
|
0 |
19,500,000 |
20,000,000 |
10,000,000 |
49,500,000 |
|
17001001/
23010112/
05000007 |
Provision of Furniture for National Open University (NOUN) Students. |
516 |
30,000,000
|
0.00 |
10,000,000
|
0 |
6,500,000 |
10,000,000 |
10,000,000 |
26,500,000 |
|
|
SUB-TOTAL |
|
160,000,000
|
-
|
120,000,000
|
|
550,750,000 |
111,500,000 |
65,500,000 |
727,750,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF EDUCATION |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
17001001 |
MINISTRY OF EDUCATION |
|
|
|
|
|
|
|
|
|
|
|
ENHANCING SKILLS AND KNOWLEDGE |
|
|
|
|
|
|
|
|
|
17001001/
23020107/
05000008 |
Construction of one (1) buiding each at GTC Abakaliki, Ehugbo and Agba
Technicals |
516 |
50,000,000 |
0 |
0 |
0 |
50,000,000 |
20,000,000 |
10,000,000 |
39,500,000 |
|
17001001/
23010113/
05000009 |
Procurement and installation of 333 Computers and Accessories in 223 Secondary
Schools in the State. |
502 |
30,000,000 |
0 |
0 |
0 |
20,000,000 |
10,000,000 |
10,000,000 |
40,000,000 |
|
17001001/
23010106/
05000010 |
Procurement of twelve (12) Hilux vans for Ministry of Education Headquarters and
zonal offices. |
502 |
30,000,000 |
0 |
90,000,000 |
0 |
58,500,000 |
90,000,000 |
90,000,000 |
238,500,000 |
|
17001001/
23010108/
05000011 |
Procurement of one (1)Nos Toyota Hiace buses for Ministry of Education
Headquarters, (SESOP) |
502 |
20,000,000 |
0 |
0 |
0 |
18,000,000 |
8,000,000 |
8,000,000 |
34,000,000 |
|
17001001/
23010124/
05000012 |
Printing of 1,000,000 continous Assessment and 350,000 Transfer Certificate
booklets for schools in the State. |
506 |
0 |
0 |
0 |
0 |
80,000,000 |
30,000,000 |
20,000,000 |
130,000,000 |
|
17001001/
23010113/
05000013 |
Computerization of WAEC registration (20 Computers needed, 3 per zone and 2 for
Ministry of Education Headquarters). |
517 |
30,000,000 |
0 |
2,500,000 |
0 |
5,000,000 |
2,500,000 |
2,500,000 |
7,500,000 |
|
17001001/
23020118/
05000014 |
Construction of one (1) Science Laboratory block and workshop building in Girls'
Technical College Agba. (SESOP) |
505 |
10,000,000 |
0 |
0 |
0 |
16,500,000 |
5,000,000 |
3,000,000 |
24,500,000 |
|
|
SUB-TOTAL |
|
170,000,000 |
0 |
92,500,000 |
0 |
248,000,000 |
165,500,000 |
143,500,000 |
557,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF EDUCATION |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL
2017 - 2019 |
|
17001001 |
MINISTRY OF EDUCATION |
|
|
|
|
|
|
|
|
|
|
|
ENHANCING SKILLS AND KNOWLEDGE |
|
|
|
|
|
|
|
|
|
17001001/
23030107/
05000015 |
Rehabilitation of 223 secondary school buildings in the State. |
504 |
150,000,000 |
0 |
150,000,000 |
0 |
300,000,000 |
150,000,000 |
150,000,000 |
600,000,000 |
|
17001001/
23010124/
05000016 |
Procurement of teaching aids and instructional materials for school. |
505 |
0 |
0 |
0 |
0 |
300,000,000 |
9,000,000 |
9,000,000 |
318,000,000 |
|
17001001/
23050101/
05000017 |
Implementation of State Education Sector Plan (SESP)/sector operational plan. |
516 |
30,000,000 |
0 |
40,000,000 |
0 |
20,000,000 |
10,000,000 |
10,000,000 |
40,000,000 |
|
17001001/
23010122/
05000018 |
Establishment of Agricultural Research grant in college of Agriculture Ishiagu,
College of Education Ikwo and EBSU |
505 |
0 |
0 |
0 |
0 |
195,500,000 |
300,000,000 |
300,000,000 |
795,500,000 |
|
17001001/
23030107/
05000019 |
Establishment of Teacher Corp program to facilitate cooperation between Ministry
of Education and SUBEB |
504 |
15,000,000 |
0 |
15,000,000 |
0 |
9,750,000 |
15,000,000 |
15,000,000 |
39,750,000 |
|
17001001/
23020107/
05000020 |
Establishment of special school to cater for people with special need at Okposi. |
504 |
0 |
0 |
0 |
0 |
650,000,000 |
300,000,000 |
200,000,000 |
1,150,000,000 |
|
|
SUB-TOTAL |
|
65,000,000 |
0 |
85,000,000 |
0 |
1,475,250,000 |
784,000,000 |
684,000,000 |
2,943,250,000 |
|
TOTAL CAPITAL EXPENDITURE, MINISTRY OF EDUCATION |
395,000,000
|
0 |
297,500,000
|
0 |
2,268,000,000 |
1,061,000,000 |
893,000,000 |
4,222,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE UNIVERSAL BASIC EDUCATION BOARD |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
17003001 |
EBONYI STATE UNIVERSAL BASIC EDUCATION BOARD |
|
|
|
|
|
|
|
|
|
ENHANCING SKILLS AND KNOWLEDGE |
|
|
|
|
|
|
|
|
|
17003001/
23020107
05000001 |
UBEC Counterpard fund to be used as listed below:
i. Construction and upgrading of 35Nos. Pilot JSS schools in the 13 LGAs in the
State
ii. Renovation and rehabilitation of 40Nos School buildings in primary schools
in the State.
Iii. Renovation and rehabilitation of 40Nos School buildings of JSS Schools in
the State.
iv. Construction of furniture for Primary and JSS e.g. Desks and provision of
white chalk board.
v. Construction of Fences of some schools in the State.
vi. Monitoring and supervision of Projects and schools in the State. (Vehicles
under logistics) |
0506 |
1,000,000,000
|
- |
4,000,000,000
|
872,527,306.83
|
3,000,000,000 |
2,000,000,000 |
2,000,000,000 |
8,000,000,000 |
|
17003001/
23020118/
05000002 |
Construction of 1staff canteen at SUBEB Headquarters |
0506 |
5,000,000
|
- |
- |
- |
6,500,000 |
10,000,000 |
5,000,000 |
25,000,000 |
|
17003001/
23030107/
05000003 |
Rehabilitation and upgrading of 3 primary schools to model primary school, one
in each zone of the State. |
0506 |
-
|
- |
- |
- |
0 |
200,000,000 |
200,000,000 |
400,000,000 |
|
|
SUB-TOTAL |
|
1,005,000,000
|
|
4,000,000,000
|
872,527,306.83
|
3,006,500,000 |
2,210,000,000 |
2,205,000,000 |
7,421,500,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE UNIVERSAL BASIC EDUCATION BOARD |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
17003001 |
EBONYI STATE UNIVERSAL BASIC EDUCATION BOARD |
|
|
|
|
|
|
|
|
|
ENHANCING SKILLS AND KNOWLEDGE |
|
|
|
|
|
|
|
|
|
17003001/
23010113/
05000004 |
Purchase of 7Nos Computer Desktop |
0506 |
2,000,000
|
0.00 |
0.00 |
0.00 |
970,000 |
5,000,000 |
3,000,000 |
3,970,000 |
|
17003001/
23010114/
05000005 |
Purchase of 7Nos Printer |
0506 |
0.00 |
0.00 |
0.00 |
0.00 |
487,500 |
0 |
0 |
487,500 |
|
17003001/
23010115/
05000006 |
Purchase of 2Nos Photocopying machine |
0506 |
0.00 |
0.00 |
0.00 |
0.00 |
1,300,000 |
0 |
0 |
1,300,000 |
|
17003001/
23020107/
05000007 |
Direct Intervention fund in primary and secondary schools in the State. |
0506 |
0.00 |
0.00 |
500,000,000
|
0.00 |
170,742,500 |
400,000,000 |
500,000,000 |
1,070,742,500 |
|
|
SUB-TOTAL |
|
2,000,000
|
0.00 |
500,000,000
|
0.00 |
173,500,000 |
405,000,000 |
503,000,000 |
1,076,500,000 |
|
TOTAL CAPITAL EXPENDITURE, EBONYI STATE UNIVERSAL BASIC EDUCATION BOARD |
7,000,000
|
0.00 |
4,500,000,000
|
872,527,306.83
|
3,180,000,000 |
26,150,000,000 |
2,708,000,000 |
32,038,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE LIBRARY BOARD |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
17008001 |
EBONYI STATE LIBRARY BOARD |
|
|
|
|
|
|
|
|
|
|
ENHANCING SKILLS AND KNOWLEDGE |
|
|
|
|
|
|
|
|
|
17008001/
23020105/
05000001 |
Construction/Provision of water facilities:
* Linkage to public water source
* Construction of three (3) overhead tanks stands for 3Nos of 3,000 liters of GP
tanks.
* Connection and provision of pipe born water to the Library complex. |
0513 |
3,000,000 |
- |
- |
- |
2,560,000 |
1,000,000 |
1,100,000 |
4,660,000 |
|
17008001/
23010112/
05000002 |
Procurement of office furniture/ fittings i.e. furnishing the Library Complex
* 1,500 reading tables
* 5,000 chairs for Library users
* 100 staff tables
* 100 chairs for staff
* 4Nos Split Air Conditioners
* etc |
0515 |
3,000,000 |
0 |
0 |
0 |
6,000,000 |
10,000,000 |
10,000,000 |
26,000,000 |
|
17008001/
23020126/
05000003 |
Acquisition and subscription for:
* Books and non books materials including professional,
* Foreign and local journal,
* Local newspapers and magazines etc. |
0516 |
3,000,000 |
0 |
0 |
0 |
3,300,000 |
6,000,000 |
5,000,000 |
14,300,000 |
|
|
SUB-TOTAL |
|
12,000,000 |
0 |
0 |
0 |
11,860,000 |
17,000,000 |
16,100,000 |
44,960,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE LIBRARY BOARD |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
17008001 |
EBONYI STATE LIBRARY BOARD |
|
|
|
|
|
|
|
|
|
|
ENHANCING SKILLS AND KNOWLEDGE |
|
|
|
|
|
|
|
|
|
17008001/
23020126/
05000004 |
Connection of the Library to internet services, this includes:
* File server,
* V-SAT-CB
* 2.4 Mtrs dish
* 5 watts Buct modern
* Sharon IGR 15 etc |
512 |
2,000,000 |
0 |
2,000,000 |
0 |
4,000,000 |
0 |
1,000,000 |
5,000,000 |
|
17008001/
23040101/
05000005 |
Preservation of the environment:
Landscaping/Tree Planting at the State Library Complex. |
512 |
5,000,000 |
0 |
3,000,000 |
0 |
1,650,000 |
1,000,000 |
2,000,000 |
4,650,000 |
|
17008001/
23010113/
05000006 |
Procurement of 50Nos of Computer desktop and accessories for e-library. |
512 |
7,700,000 |
0 |
0 |
0 |
7,150,000 |
5,000,000 |
2,500,000 |
14,650,000 |
|
17008001/
23010108/
05000007 |
Purchase of official 1No. 22 seater Bus for transportation of State Library
Books and Library Staff. |
512 |
0 |
0 |
8,000,000 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
17008001/
23050102/
05000008 |
Acquisition of non tangible assets:
* Computer Software
* Electronic Books |
512 |
0 |
0 |
0 |
0 |
3,250,000 |
0 |
0 |
3,250,000 |
|
|
SUB-TOTAL |
|
14,700,000 |
0 |
13,000,000 |
0 |
31,050,000 |
6,000,000 |
5,500,000 |
42,550,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE LIBRARY BOARD |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
17008001 |
EBONYI STATE LIBRARY BOARD |
|
|
|
|
|
|
|
|
|
|
ENHANCING SKILLS AND KNOWLEDGE |
|
|
|
|
|
|
|
|
|
17008001/
23020111/
05000009 |
Construction/Provision of Libraries:
* Children's Library and Bindery Unit at
Library Headquarter Abakaliki, Ebonyi LGA
* Construction of 3 Libraries in the
Zones (Afikpo and Onueke) in:
* Afikpo North
* Ezza South
* Ishielu |
512 |
0 |
0 |
0 |
3,283,100 |
4,000,000 |
10,500,000 |
25,000,000 |
41,500,000 |
|
17008001/
23010125/
05000010 |
Procurement of Library equipments:
* Shelves
* Filling cabinets
* Projectors,
* Book trolleys
* Card Cabinet
* Binding equipments etc
* In Library Hqtr and her zonal
Libraries. |
512 |
0 |
0 |
0 |
0 |
4,810,000 |
5,000,000 |
4,000,000 |
13,810,000 |
|
|
SUB-TOTAL |
|
|
|
|
3,283,100 |
8,810,000 |
15,500,000 |
29,000,000 |
63,725,000 |
|
TOTAL CAPITAL EXPENDITURE, EBONYI STATE LIBRARY BOARD |
23,700,000 |
0 |
13,000,000 |
3,283,100 |
51,220,000 |
41,000,000 |
53,100,000 |
166,500,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05: SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EXAMINATION DEVELOPMENT CENTER |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
17009001 |
EXAMINATION DEVELOPMENT CENTER |
|
|
|
|
|
|
|
|
|
|
ENHANCING SKILLS AND KNOWLEDGE |
|
|
|
|
|
|
|
|
|
17009001/
23010106/
05000001 |
Purchase of motor vehicle (Hilux) |
0515 |
0 |
0 |
8,000,000 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
17009001/
23010112/
05000002 |
Purchase of office furniture and
fittings. |
0515 |
0 |
0 |
1,000,000 |
0 |
650,000 |
2,000,000 |
2,000,000 |
4,650,000 |
|
17009001/
23010113/
05000003 |
Purchase of 6No. Computers |
0515 |
0 |
0 |
200,000 |
0 |
390,000 |
500,000 |
500,000 |
1,390,000 |
|
17009001/
23020118/
05000004 |
Construction of resource centre |
0515 |
0 |
0 |
0 |
0 |
6,500,000 |
10,000,000 |
10,000,00 |
26,500,000 |
|
17009001/
23010139/
05000005 |
Purchase of Marking machine. |
0515 |
0 |
0 |
20,000,000 |
3,500,000 |
11,375,000 |
15,000,000 |
15,000,000 |
41,375,000 |
|
17009001/
23010123/
05000006 |
Purchase of fire-extinguisher |
0515 |
0 |
0 |
100,000 |
|
65,000 |
50,000 |
500,000 |
615,000 |
|
TOTAL CAPITAL EXPENDITURE EXAMINATION DEVELOPMENT CENTRE |
0 |
0 |
40,000,000 |
3,500,000 |
33,980,000 |
27,550,000
|
28,000,000
|
89,530,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE AGENCY FOR MASS LITERACY, ADULT AND NON-FORMAL EDUCATION |
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
17010001 |
AGENCY FOR MASS LITERACY |
|
|
|
|
|
|
|
|
|
|
|
ENHANCING SKILLS AND KNOWLEDGE |
|
|
|
|
|
|
|
|
|
17010001/
23010124/
05000001 |
Procurement of Vocational Equipment for Skill acquisition Centre in Ezza South
Central. |
517 |
3,000,000 |
0 |
3,000,000 |
0 |
1,950,000 |
3,000,000 |
2,000,000 |
6,950,000 |
|
17010001/
23010124/
05000002 |
Literacy by radio programme
- Purchase of 2000 radio sets @ N4,750
each
|
516 |
0.00 |
0 |
2,606,000 |
0 |
2,600,000
|
3,000,000
|
2,500,000
|
8,100,000 |
|
17010001/
23050104/
05000003 |
International Literacy Day Celebration |
502 |
1,000,000 |
0 |
0 |
0 |
650,000 |
1,000,000 |
1,000,000 |
2,650,000 |
|
17010001/
23010112/
05000004 |
Purchase of office furniture and fittings viz:
1. 2No Steel cabinets
2. 2No. Office Tables
3. 2No Chairs. |
509 |
0.00 |
0 |
60,000 |
0 |
39,000 |
60,000 |
39,000 |
138,000 |
|
17010001/
23010119/
05000005 |
Purchase of 1Nos. Power Generating set |
502 |
0.00 |
0 |
80,000 |
0 |
60,000 |
120,000 |
0 |
180,000 |
|
|
SUB-TOTAL |
|
0.00 |
0 |
5,746,000 |
0 |
5,299,000 |
7,180,000 |
5,539,000 |
23,764,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE AGENCY FOR MASS LITERACY, ADULT AND NON-FORMAL EDUCATION |
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
17010001 |
AGENCY FOR MASS LITERACY |
|
|
|
|
|
|
|
|
|
|
|
ENHANCING SKILLS AND KNOWLEDGE |
|
|
|
|
|
|
|
|
|
17010001/
23010124/
05000006 |
Purchase of Teaching/Learning Aid Equipment:
1. 6Nos white board
2. Text books & Exercise books |
517 |
0 |
0 |
130,000 |
0 |
175,500 |
270,000 |
270,000 |
715,500 |
|
17010001/
23010139/
05000007 |
Purchase of other Office Equipment:
1. 3Nos TV sets
2. 3Nos Radio sets
3. 3Nos Air Considioners
4. 3Nos Ceiling fans |
517 |
0 |
0 |
124,000 |
0 |
154,700 |
238,000 |
238,000 |
630,700 |
|
|
SUB-TOTAL |
|
|
|
|
0 |
330,200 |
508,000 |
508,000 |
1,346,200 |
|
TOTAL CAPITAL EXPENDITURE, EBONYI STATE AGENCY FOR MASS LITERACY, ADULT AND
NON-FORMAL EDUCATION |
36,600,000 |
0 |
20,474,000 |
0 |
5,629,200 |
12,488,000 |
10,568,000
|
48,904,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE COLLEGE OF EDUCATION, IKWO |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
17019001 |
EBONYI STATE COLLEGE OF EDUCATION, IKWO |
|
|
|
|
|
|
|
|
|
ENHANCING SKILLS AND KNOWLEDGE |
|
|
|
|
|
|
|
|
|
17019001/
23020101/
05000001 |
Construction of standard Administrative 2-storey Office Block. |
510 |
100,000,000 |
0.00 |
20,000,000
|
0 |
65,000,000 |
75,000,000 |
75,000,000 |
215,000,000 |
|
17019001/
23020118/
05000002 |
High Rise Perimeter Fence and College Main Entrance Gate. |
510 |
30,000,000 |
0.00 |
25,000,000
|
0 |
19,500,000 |
50,000,000 |
0 |
69,500,000 |
|
17019001/
23020114/
05000003 |
Internal Roads within the Colledge. |
510 |
10,000,000 |
0.00 |
0.00 |
0 |
13,000,000 |
10,000,000 |
160,000,000 |
183,000,000 |
|
17019001/
23020101/
05000004 |
Production of Base Map and Master Plan of the College. |
510 |
0 |
0.00 |
0.00 |
0 |
9,750,000 |
- |
- |
9,750,000 |
|
17019001/
23010105/
05000005 |
i. Procurement of 2Nos Hilux for Security
patrol and works Department respectively.
|
510 |
30,000,000 |
0.00 |
16,000,000
|
0 |
15,000,000 |
- |
- |
15,000,000 |
|
17019001/
23030101/
05000006 |
Rehabilitation of 6Nos existing buildings. |
510 |
49,500,000 |
0.00 |
19,000,000
|
0 |
19,500,000 |
0 |
31,000,000 |
50,500,000 |
|
17019001/
23020118/
05000007 |
College Pavillion. |
510 |
20,000,000 |
0.00 |
10,000,000
|
0 |
65,000,000 |
55,000,000 |
0 |
120,000,000 |
|
17019001/
23020105/
05000008 |
Water Reticulation. |
510 |
26,500,000 |
0.00 |
0.00 |
0 |
3,250,000 |
0 |
18,000,000 |
21,250,000 |
|
TOTAL CAPITAL EXPENDITURE, EBONYI STATE COLLEGE OF EDUCATION, IKWO |
265,100,000 |
0.00 |
100,000,000 |
0 |
210,000,000 |
190,000,000 |
284,000,000 |
684,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05: SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE UNIVERSITY |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
17021001 |
EBONYI STATE UNIVERSITY |
|
|
|
|
|
|
|
|
|
|
|
ENHANCING SKILLS AND KNOWLEDGE |
|
|
|
|
|
|
|
|
|
17021001/
23020111/
05000001 |
Construction of a Standard University Library. |
0517 |
450,000,000
|
0.00 |
0 |
0.00 |
65,000,000
|
0 |
0.00 |
65,000,000 |
|
17021001/
23020101/
05000002 |
Completion of the Administrative Block |
0517 |
40,000,000
|
0.00 |
40,000,000 |
0.00 |
26,000,000 |
0.00 |
0.00 |
26,000,000 |
|
17021001/
23020105/
05000003 |
Construction of water facilities at the permanent site. |
0517 |
200,000,000
|
0.00 |
50,000,000 |
0.00 |
32,500,000 |
20,000,000 |
10,000,000 |
62,500,000 |
|
17021001/
23010112/
05000004 |
Furnishing of Admin. Block |
0517 |
-
|
0.00 |
0 |
0.00 |
39,000,000
|
0 |
0.00 |
39,000,000 |
|
17021001/
23010124/
05000005 |
Purchase of Laboratory/ Teaching Equipment. |
0517 |
310,000,000
|
0.00 |
0 |
0.00 |
97,500,000
|
0 |
0.00 |
97,500,000 |
|
17021001/
23010125/
05000006 |
Purchase of Library books and Equipment. |
0518 |
85,000,000
|
0.00 |
0 |
0.00 |
32,500,000
|
0 |
0.00 |
32,500,000 |
|
17021001/
23030114/
05000007 |
Landscaping of new structures |
0517 |
0.00 |
0.00 |
0.00 |
0.00 |
13,000,000
|
0.00 |
0.00 |
13,000,000
|
|
TOTAL CAPITAL EXPENDITURE, EBONYI STATE UNIVERSITY |
3,650,000,000
|
0.00 |
4,880,000,000 |
0.00 |
305,500,000
|
20,000,000 |
10,000,000 |
335,500,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
SECONDARY EDUCATION BOARD |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
17051000 |
SECONDARY EDUCATION BOARD |
|
|
|
|
|
|
|
|
|
|
ENHANCING SKILLS AND KNOWLEDGE |
|
|
|
|
|
|
|
|
|
17051000/
23010124/
05000001 |
Purchase of Teaching/learning Aid e.g. statutory records |
0505 |
10,000,000 |
5,641,500 |
0.00 |
0 |
2,000,000 |
48,310,000 |
53,140,000 |
103,450,000 |
|
17051000/
23010125/
05000002 |
Purchase of Library Books for 221 Sec. Schools across the State. |
0512 |
10,000,000 |
0.00 |
0.00 |
0 |
3,250,000 |
40,270,000 |
44,300,000 |
87,820,000 |
|
17051000/
23010125/
05000003 |
Purchase of Sporting/Game equipment for 31 Pilot Schools. |
0513 |
5,000,000 |
- |
- |
- |
10,010,000 |
2,000,000 |
0 |
12,010,000 |
|
17051000/
23020126/
05000004 |
Construction of ICT Lab in Pilot and Technical schools 31 pilot 3 Technical
schools. |
0503 |
0 |
0 |
0 |
0 |
106,535,000 |
121,000,000 |
121,000,000 |
348,535,000 |
|
17051000/
23010119/
05000005 |
Purchase of 31Nos power generating set to power the ICT as back up to
electricity. |
0503 |
0 |
0 |
0 |
0 |
44,330,000 |
33,280,000 |
0 |
101,480,000 |
|
17051000/
23010119/
05000006 |
Purchase of 2Nos Hilux vans for the Headquarter. |
0503 |
0 |
0 |
0 |
0 |
22,750,000 |
0 |
0 |
22,750,000 |
|
TOTAL CAPITAL EXPENDITURE SECONDARY EDUCATION BOARD |
80,000,000 |
5,641,500 |
-
|
0 |
188,875,000 |
244,860,000 |
218,440,000 |
676,045,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF HEALTH |
|
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
21001001 |
MINISTRY OF HEALTH |
|
|
|
|
|
|
|
|
|
|
|
IMPROVEMENT TO HUMAN HEALTH |
|
|
|
|
|
|
|
|
|
21001001/
23020106/
04000001 |
Completion of 5Nos General Hospitals |
0406 |
200,000,000 |
372,369,052.09 |
200,000,000 |
0 |
300,000,000 |
50,000,000 |
0 |
350,000,000 |
|
21001001/
23030106/
04000002 |
Rehabilitation of 8Nos General Hospitals. |
0406 |
200,000,000 |
0 |
300,000,000 |
0 |
300,000,000 |
100,000,000 |
0 |
400,000,000 |
|
21001001/
23010122/
04000003 |
Provision of drugs to General Hospitals. |
0403 |
0 |
0 |
100,000,000 |
0 |
200,000,000 |
100,000,000 |
50,000,000 |
350,000,000 |
|
21001001/
23020106/
04000004 |
Fencing of General Hospitals. |
0406 |
0 |
0 |
600,000,000 |
0 |
400,000,000 |
100,000,000 |
100,000,000 |
600,000,000 |
|
21001001/
23010122/
04000005 |
Landscaping of the General Hospitals. |
0406 |
0 |
0 |
0 |
0 |
455,000,000 |
400,000,000 |
400,000,000 |
1,255,000,000 |
|
21001001/
23010122/
04000006 |
Equipping the General Hospitals. |
0406 |
0 |
0 |
150,000,000 |
0 |
900,000,000 |
100,000,000 |
50,000,000 |
1,050,000,000 |
|
21001001/
23010122/
04000007 |
State Insurance Scheme |
0406 |
0 |
0 |
0 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
21001001/
23010122/
04000008 |
Provision of Water to the General Hospitals |
0406 |
0 |
0 |
0 |
0 |
45,500,000 |
0 |
0 |
45,500,000 |
|
21001001/
23010122/
04000009 |
Provision of electricity to the 13 general hospitals |
0406 |
0 |
0 |
0 |
0 |
355,000,000 |
0 |
0 |
355,000,000 |
|
21001001/
23010122/
04000010 |
Malaria Elimination Programme. |
0402 |
120,000,000 |
0 |
50,000,000 |
500,000 |
45,500,000 |
50,000,000 |
30,000,000 |
125,500,000 |
|
21001001/
23010122/
04000011 |
Epidemic Diseases Control |
0406 |
0 |
0 |
20,000,000 |
19,200,000 |
19,500,000 |
20,000,000 |
20,000,000 |
59,500,000 |
|
|
SUB-TOTAL |
|
520,000,000 |
372,369,052.09 |
2,220,000,000 |
19,700,000 |
3,027,000,000 |
920,000,000 |
650,000,000 |
4,597,000,000 |
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF HEALTH |
|
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
21001001 |
MINISTRY OF HEALTH |
|
|
|
|
|
|
|
|
|
|
|
IMPROVEMENT TO HUMAN HEALTH |
|
|
|
|
|
|
|
|
|
21001001/
23020106/
04000012 |
NIGEP Surveillance |
0406 |
0 |
0 |
0 |
0 |
1,300,000 |
1,000,000 |
1,000,000 |
3,300,000 |
|
21001001/
23020106/
04000013 |
Neglected Tropical Diseases (NTDs) |
0406 |
0 |
0 |
0 |
0 |
3,250,000 |
0 |
0 |
3,250,000 |
|
21001001/
23010122/
04000014 |
Free Maternal Health Care Services. |
0404 |
0 |
0 |
10,000,000 |
0 |
6,500,000 |
5,000,000 |
3,000,000 |
14,500,000 |
|
21001001/
23030106/
04000015 |
Rehabilitation 6Nos houses for Ex-leprosy patients/TB. |
0406 |
10,000,000 |
0 |
20,000,000 |
0 |
19,500,000 |
20,000,000 |
10,000,000 |
49,500,000 |
|
21001001/
23010122/
04000016 |
Support to Mission Hospitals |
0408 |
600,000,000 |
0 |
600,000,000 |
0 |
400,000,000 |
0 |
0 |
400,000,000 |
|
21001001/
23010122/
04000017 |
HIV/AIDS Intervention |
0406 |
0 |
0 |
3,000,000 |
0 |
3,250,000 |
10,000,000 |
5,000,000 |
18,250,000 |
|
21001001/
23010122/
04000018 |
School Health Services |
0401 |
0 |
0 |
0 |
0 |
6,500,000 |
5,000,000 |
2,000,000 |
13,500,000 |
|
21001001/
23010122/
04000019 |
Health Education Services |
0401 |
0 |
0 |
0 |
0 |
3,250,000 |
3,000,000 |
2,000,000 |
8,250,000 |
|
|
SUB-TOTAL |
|
610,000,000 |
0 |
641,000,000 |
0 |
443,550,000 |
44,000,000 |
23,000,000 |
510,550,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF HEALTH |
|
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
21001001 |
MINISTRY OF HEALTH |
|
|
|
|
|
|
|
|
|
|
|
IMPROVEMENT TO HUMAN HEALTH |
|
|
|
|
|
|
|
|
|
21001001/
23010122/
04000020 |
Production/Procurement of sanitrary equipment & enforcement documents |
0406 |
0 |
0 |
0 |
0 |
1,950,000 |
0 |
0 |
1,950,000 |
|
21001001/
23010122/
04000021 |
Construction of Ebonyi State Drug Distribution Centre. |
0406 |
0 |
0 |
0 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
21001001/
23020106/
04000022 |
Procurement of 2No. Toyota Hilux Director Medical Services Nursing inspection
fund. |
0406 |
0 |
0 |
0 |
0 |
20,000,000 |
2,000,000 |
0 |
22,000,000 |
|
21001001/
23020106/
04000023 |
Procurement of 2No. Toyota Hilux and one motorised social mobilization vehicle
to support the implementation of saving one million lives program. |
0406 |
0 |
0 |
0 |
0 |
29,250,000 |
0 |
0 |
29,250,000 |
|
21001001/
23020106/
04000024 |
Renovation & upgrading infrastructure in 65 5 per LGA out of 171 PHCs proposed |
0406 |
0 |
0 |
0 |
0 |
211,250,000 |
0 |
0 |
211,250,000 |
|
21001001/
23020106/
04000025 |
Equipping of 65 (5 per LGA) out of the 171 PHCs proposed |
0406 |
0 |
0 |
0 |
0 |
126,750,000 |
0 |
0 |
126,750,000 |
|
21001001/
23020106/
04000026 |
Fencing of 65 (5 per LGA) out of the 171 PHCs proposed |
0406 |
0 |
0 |
0 |
0 |
209,137,500 |
0 |
0 |
209,137,500 |
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
611,337,500 |
2,000,000
|
0 |
613,337,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF HEALTH |
|
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
21001001 |
MINISTRY OF HEALTH |
|
|
|
|
|
|
|
|
|
|
|
IMPROVEMENT TO HUMAN HEALTH |
|
|
|
|
|
|
|
|
|
21001001/
23010122/
04000027 |
Provision & reticulation of water in 65 (5 per LGA) out of the 171 PHCs
proposed. |
0406 |
0 |
0 |
0 |
0 |
42,250,000 |
0 |
0 |
42,250,000 |
|
21001001/
23010122/
04000028 |
Provision of alternative power source in 65 (5 per LGA) out of the 171 PHC
proposed. |
0406 |
0 |
0 |
0 |
0 |
21,125,000 |
0 |
0 |
21,125,000 |
|
21001001/
23020106/
04000029 |
Relocation of EPI State cold store from democracy estate to Centenary City
(restructiong to suit the store and reinstallation of the cold room) |
0406 |
0 |
0 |
0 |
0 |
3,250,000 |
2,000,000 |
0 |
5,250,000 |
|
21001001/
23020106/
04000030 |
Procurement of 65 tricycles (Keke) for 65 (5 per LGA) out of the 171 PHCs
proposed. |
0406 |
0 |
0 |
0 |
0 |
42,250,000 |
0 |
0 |
42,250,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
108,875,000 |
2,000,000
|
0 |
110,875,000 |
|
TOTAL CAPITAL EXPENDITURE MINISTRY OF HEALTH |
2,410,000,000 |
372,369,052.09 |
2,861,000,000 |
19,700,000 |
3,960,762,500
|
966,000,000 |
673,000,000 |
5,599,762,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI PRIMARY HEALTH CARE DEVELOPMENT AGENCY |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
23010122 |
MINISTRY OF HEALTH |
|
|
|
|
|
|
|
|
|
|
|
IMPROVEMENT TO HUMAN HEALTH |
|
|
|
|
|
|
|
|
|
23010122/
23010122/
04000001 |
Take off fund for PHC Agency & LGA PHC Authority |
0401 |
0 |
0 |
0 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
23010122/
23010122/
04000002 |
Nutrition programme |
0401 |
0 |
0 |
0 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
23010122/
23010122/
04000003 |
Reproductive health services & family planning |
0401 |
0 |
0 |
0 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
23010122/
23010122/
04000004 |
Provision of essential drugs in the State |
0401 |
0 |
0 |
0 |
0 |
21,125,000 |
0 |
0 |
21,125,000 |
|
23010122/
23010122/
04000005 |
Expanded programme on immunization activies (strengthening routine immunization
activities) |
0401 |
0 |
0 |
0 |
0 |
22,750,000 |
0 |
0 |
22,750,000 |
|
23010122/
23010122/
04000006 |
Capacity building & retraining of all cadres of health workers on the concept of
one PHC per ward. |
0401 |
0 |
0 |
0 |
0 |
16,900,000 |
0 |
0 |
16,900,000 |
|
23010122/
23010122/
04000007 |
Procurement of 2 project vehicles for monitoring & Supervision. |
0401 |
0 |
0 |
0 |
0 |
30,000,000 |
0 |
0 |
30,000,000 |
|
23010122/
23020118/
04000008 |
Procurement of office equipment & furniture for agency headquarters & LGA
offices |
0401 |
0 |
0 |
0 |
0 |
19,500,000 |
0 |
0 |
19,500,000 |
|
SUB-TOTAL |
0 |
0 |
0 |
0 |
142,775,000 |
0 |
0 |
142,775,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI PRIMARY HEALTH CARE DEVELOPMENT AGENCY |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
23010122 |
MINISTRY OF HEALTH |
|
|
|
|
|
|
|
|
|
|
|
IMPROVEMENT TO HUMAN HEALTH |
|
|
|
|
|
|
|
|
|
23010122/
23020105/
04000009 |
Conduct of supplemental immunization activities (campaigns activities towards
disease eradication, elimination & control example polio campaign. |
0401 |
0 |
0 |
0 |
0 |
22,750,000 |
0 |
0 |
22,750,000 |
|
23010122/
23010122/
04000010 |
Conduct of Biannual Maternal, newborn & child health weeks (May/June & Nov/Dec). |
0401 |
0 |
0 |
0 |
0 |
22,750,000 |
0 |
0 |
22,750,000 |
|
23010122/
23010122/
04000011 |
Vaccine security & Cold Chain logistics pushing vaccines from State to LGAs to
Health facilities) |
0401 |
0 |
0 |
0 |
0 |
32,500,000 |
0 |
0 |
32,500,000 |
|
23010122/
23010122/
04000012 |
Advocacy, communication & social mobilization activities geared towards
community sensitization towards ownership and participation. |
0401 |
0 |
0 |
0 |
0 |
22,750,000 |
0 |
0 |
22,750,000 |
|
23010122/
23030101/
04000013 |
Baby friendly Initiative serices promoting exclusive breastfeeding. |
0401 |
0 |
0 |
0 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
23010122/
23010122/
04000014 |
Safe motherhood services |
0401 |
0 |
0 |
0 |
0 |
22,750,000 |
0 |
0 |
22,750,000 |
|
|
SUB-TOTAL |
|
|
|
|
|
136,500,000 |
0 |
0 |
136,500,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI PRIMARY HEALTH CARE DEVELOPMENT AGENCY |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
23010122 |
MINISTRY OF HEALTH |
|
|
|
|
|
|
|
|
|
|
|
IMPROVEMENT TO HUMAN HEALTH |
|
|
|
|
|
|
|
|
|
23010122/
23030101/
04000015 |
Gender Health Services |
0401 |
0 |
0 |
0 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
23010122/
23010122/
04000016 |
Adolescent Health Services |
0401 |
0 |
0 |
0 |
0 |
6,500,000 |
0 |
0 |
6,500,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
0 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
TOTAL CAPITAL EXPENDITURE EBONYI STATE PRIMARY HEALTH CARE DEVELOPMENT AGENCY |
0 |
0 |
0 |
0 |
292,275,000 |
0 |
0 |
292,275,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
OFFICE OF THE SPECIAL ASSISTANTS TO THE GOVERNOR ON PRIMARY HEALTH CARE |
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
23010122 |
OFFICE OF THE SPECIAL ASSISTANTS TO THE GOVERNOR ON PRIMARY HEALTH CARE |
|
|
|
|
|
|
|
|
|
|
|
IMPROVEMENT TO HUMAN HEALTH |
|
|
|
|
|
|
|
|
|
23010122/
23010122/
04000001 |
Procurement of 3Nos. Hilux vehicles for community sensitization, monitoring &
supervision for the three SAs. |
0401 |
0 |
0 |
0 |
0 |
45,000,000 |
0 |
0 |
45,000,000 |
|
23010122/
23010122/
04000002 |
Procurement of 3Nos desktop computers |
0401 |
0 |
0 |
0 |
0 |
1,800,000 |
0 |
0 |
1,800,000 |
|
23010122/
23010122/
04000003 |
Enumeration ofr State Health Insurance Scheme |
0401 |
0 |
0 |
0 |
0 |
30,000,000 |
0 |
0 |
30,000,000 |
|
23010122/
23030101/
04000004 |
Production of IEC Materials for Health Awareness |
0401 |
0 |
0 |
0 |
0 |
10,000,000 |
0 |
0 |
10,000,000 |
|
23010122/
23010122/
04000005 |
Procurement of Office Furniture |
0401 |
0 |
0 |
0 |
0 |
9,000,000 |
0 |
0 |
9,000,000 |
|
TOTAL CAPITAL EXPENDITURE OFFICE OF THE SAs TO THE GOVERNOR ON PRIMARY HEALTH
CARE |
0 |
0 |
0 |
0 |
95,800,000 |
0 |
0 |
95,800,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
SCHOOL OF HEALTH TECHNOLOGY, NGBO |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
21026001 |
SCHOOL OF HEALTH TECHNOLOGY, NGBO |
|
|
|
|
|
|
|
|
|
IMPROVEMENT TO HUMAN HEALTH |
|
|
|
|
|
|
|
|
|
21026001/
23020106/
04000001 |
Completion of 2No. HSDP II classroom
block |
0406 |
50,000,000 |
0 |
50,000,000 |
0 |
20,000,000 |
10,000,000 |
5,000,000 |
35,000,000 |
|
21026001/
23020102/
04000002 |
Completion of 1No. Female Block. |
0406 |
0 |
0 |
25,000,000 |
0 |
20,000,000 |
5,000,000 |
2,000,000 |
27,000,000.00 |
|
21026001/
23040101/
04000003 |
Landscaping of the Premises of the school of Health. |
0406 |
0 |
0 |
6,000,000 |
0 |
3,500,000 |
2,000,000 |
1,000,000 |
6,500,000 |
|
21026001/
23020107/
04000004 |
Construction of 1No. Storey building to house lecturers halls and laboratory for
pharmacy department. |
0406 |
0 |
0 |
0 |
0 |
100,000,000 |
25,000,000 |
0 |
125,000,000 |
|
21026001/
23010141/
04000005 |
Procurement of Laboraty equipment for pharmacy and laboratory department. |
0406 |
0 |
0 |
20,000,000 |
0 |
6,500,000 |
10,000,000 |
0 |
16,500,000 |
|
TOTAL CAPITAL EXPENDITURE SCHOOL OF HEALTH TECHNOLOGY, NGBO |
0 |
0 |
150,000,000 |
0 |
150,000,000 |
52,000,000 |
8,000,000 |
210,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
SCHOOL OF NURSING AND MIDWIFERY, UBURU |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
21033001 |
SCHOOL OF NURSING, AND MIDWIFERY UBURU |
|
|
|
|
|
|
|
|
|
IMPROVEMENT TO HUMAN HEALTH |
|
|
|
|
|
|
|
|
|
21033001/
23010122/
04000001 |
Completion of on-going buildings at School of Nursing Uburu. |
0406 |
- |
- |
150,000,000 |
- |
200,000,000 |
100,000,000 |
50,000,000 |
350,000,000 |
|
21033001/
23010122/
04000002 |
Procurement of Office Equipment and Furnishing |
0406 |
- |
- |
50,000,000 |
- |
50,000,000 |
50,000,000 |
20,000,000 |
120,000,000 |
|
TOTAL CAPITAL EXPENDITURE SCHOOL OF NURSING, UBURU |
- |
- |
200,000,000 |
- |
250,000,000 |
150,000,000 |
70,000,000 |
470,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE AGENCY FOR CONTROL OF AIDS (EBOSACA) |
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
21033001 |
EBONYI STATE AGENCY FOR CONTROL OF AIDS |
|
|
|
|
|
|
|
|
|
IMPROVEMENT TO HUMAN HEALTH |
|
|
|
|
|
|
|
|
|
21033001/
23010122/
04000001 |
Maintenance/storage of HIV Prevention Commodities across the State |
0401 |
7,900,000 |
0 |
0 |
0 |
3,380,000 |
14,000,000 |
17,000,000 |
34,380,000 |
|
21033001/
23010122/
04000002 |
Procurement of HIV test/consumables/prevention commodities. |
0401 |
78,000,000 |
13,000,000 |
7,000,000 |
17,000,000 |
4,550,000 |
103,000,000 |
250,000,000 |
357,550,000 |
|
21033001/
23010122/
04000003 |
Payment of State Counterpart Fund contribution to the World Bank HIV/AIDs
project, USAIDs and other Development Partners & installation. |
0401 |
150,000,000 |
16,000,000 |
30,000,000 |
0 |
32,500,000 |
320,000,000 |
480,000,000 |
32,500,000 |
|
21033001/
23020126/
04000004 |
Procurement, installation, operation of M & E Data base equipment in the State. |
0401 |
47,000,000 |
0 |
0 |
0 |
3,900,000 |
11,500,000 |
9,250,000 |
3,900,000 |
|
TOTAL CAPITAL EXPENDITURE EBONYI STATE AGENCY FOR CONTROL OF AIDS |
357,900,000
|
88,000,000
|
80,390,000
|
17,000,000 |
44,330,000 |
543,890,000
|
862,640,000
|
428,330,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
EBONYI STATE HOSPITALS MANAGEMENT BOARD |
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
21102001 |
EBONYI STATE HOSPITALS MANAGEMENT BOARD |
|
|
|
|
|
|
|
|
|
IMPROVEMENT TO HUMAN HEALTH |
|
|
|
|
|
|
|
|
|
21102001/
23010106/
04000001 |
Procurement of vehicles (2 Hilux pickup van). |
0410 |
0.00 |
0.00 |
16,000,000 |
0 |
13,000,000 |
0 |
0 |
13,000,000 |
|
21102001/
23010105/
04000002 |
Purchase of 1 Hummer Bus SHMB HQ |
0410 |
0.00 |
0.00 |
0.00 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
21102001/
23010112/
04000003 |
Purchase of Office furniture & fittings |
0406 |
2,000,000 |
0.00 |
15,000,000
|
0 |
7,150,000 |
0 |
0 |
7,150,000 |
|
21102001/
23010113/
04000004 |
Procurement of 5Nos Computer sets. |
0406 |
200,000 |
0.00 |
500,000 |
0 |
325,000 |
0 |
0 |
325,000 |
|
21102001/
23010114/
04000005 |
Procurement of 5Nos Computer Printers |
0406 |
200,000 |
0.00 |
0.00 |
0 |
162,500 |
0 |
0 |
162,500 |
|
21102001/
23010115/
04000006 |
Procurement of 2Nos Photocopying machines. |
0406 |
100,000 |
- |
400,000 |
0 |
450,000 |
0 |
0 |
450,000 |
|
21102001/
23010139/
04000007 |
Purchase of 2Nos Air Conditioners. |
0406 |
0 |
0 |
0 |
0 |
5,000,000 |
0 |
0 |
5,000,000 |
|
21102001/
23010119/
04000008 |
Purchase of 2Nos. Power Genertating Sets for HMB/Civil staff Clinic 8KVA |
0406 |
0 |
0 |
0 |
0 |
390,000 |
0 |
0 |
390,000 |
|
21102001/
23010139/
04000009 |
Purchase of 1No. Multimedia projector and screen. |
0406 |
0 |
0 |
0 |
0 |
195,000 |
0 |
0 |
195,000 |
|
TOTAL CAPITAL EXPENDITURE EBONYI STATE HOSPITALS MANAGEMENT BOARD |
2,500,000 |
0 |
31,900,000 |
0 |
41,672,500 |
0 |
0 |
41,672,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF ENVIRONMENT |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL
2017 - 2019 |
|
|
35001001 |
MINISTRY OF ENVIRONMENT |
|
|
|
|
|
|
|
|
|
|
|
ENVIRONMENTAL IMPROVEMENT |
|
|
|
|
|
|
|
|
|
35001001/
23040106/
09000001 |
Installation of (30)nos specially designed mobile kiosk at designed location in
the metropolis |
0908 |
0 |
0 |
25,000,000 |
0 |
9,750,000 |
15,000,000 |
15,000,000 |
45,000,000 |
|
35001001/
23040101/
09000002 |
Forestation and reforestation scheme (tree planting) in Abakaliki Capital City. |
0914 |
0 |
0 |
2,000,000 |
6,293,000 |
6,500,000 |
2,000,000 |
2,000,000 |
10,500,000 |
|
35001001/
23040101/
09000003 |
Maintenance of Palms planted from 135 to Onuebonyi, Centenary City and Streets
of Abakaliki Metropolis. |
0905 |
0 |
0 |
0 |
0 |
19,500,000 |
50,000,000 |
50,000,000 |
119,500,000 |
|
35001001/
23040103/
09000004 |
Aforestation and Deforestation of trees across three (3) Zones. South, North and
Central. |
0901 |
0 |
0 |
0 |
0 |
65,000,000 |
100,000,000 |
50,000,000 |
215,000,000 |
|
35001001/
23040106/
09000005 |
Contract for the clearing of grasses, trimming of flowers, clearing of roadside,
drains and littered waste in fourteen (14) sanitation zones in the Abakaliki
metropolis |
0910 |
140,000,000 |
186,000,000 |
140,000,000 |
224,000,000 |
130,000,000 |
336,000,000 |
336,000,000 |
802,000,000 |
|
35001001/
23040106/
09000006 |
Clearing and dumping of waste at Umuoghara land |
0909 |
1,200,000 |
0 |
10,000,000 |
0 |
9,750,000 |
15,000,000 |
10,000,000 |
34,750,000
|
|
35001001/
23040106/
09000007 |
Installation of (30)nos specially designed mobile toilet at
designated public location in Abakaliki metropolis |
0910 |
0 |
0 |
0 |
0 |
13,000,000 |
15,000,000 |
15,000,000 |
43,000,000 |
|
|
|
|
SUB-TOTAL |
|
141,200,000
|
186,000,000
|
177,000,000
|
230,293,000
|
253,500,000 |
533,000,000 |
478,000,000 |
1,269,750,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF ENVIRONMENT |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
35001001 |
MINISTRY OF ENVIRONMENT |
|
|
|
|
|
|
|
|
|
|
|
ENVIRONMENTAL IMPROVEMENT |
|
|
|
|
|
|
|
|
|
35001001/
23040106/
09000008 |
Evacuation of refuse at the various dumps scattered across the state capital |
0909 |
200,000,000 |
250,000,000 |
147,900,000 |
0 |
195,000,000 |
250,000,000 |
250,000,000 |
695,000,000 |
|
35001001/
23020118/
09000009 |
Construction of mechanical base workshop for maintenance of waste
equipment/machines |
0909 |
0 |
0 |
0 |
0 |
10,000,000 |
5,000,000 |
5,000,000 |
20,000,000 |
|
35001001/
23040105/
09000010 |
Beautification of road side verge from
135 to Onuebonyi roundabout and interlock
of major streets in Abakaliki capital city |
0905 |
0 |
18,020,963.64 |
0 |
24,930,000 |
195,000,000 |
200,000,000 |
200,000,000 |
595,000,000 |
|
35001001/
23010107/
09000011 |
Procurement of waste equipment
1. Bulldozer
2. 1No. Tipper lorry
3. 1No. Excavator
4. 1No. Pay loader |
0909 |
100,000,000 |
58,940,000.00 |
30,000,000 |
0 |
65,000,000 |
50,000,000 |
50,000,000 |
165,000,000 |
|
35001001/
23040104/
09000012 |
Construction of integrated solid waste (Recycling plant, plant for conversion of
bio-degradable waste and landfill) at Umuoghara |
0909 |
100,000,000 |
86,823,460.64 |
500,000,000 |
0 |
130,000,000 |
200,000,000 |
100,000,000 |
430,000,000 |
|
35001001/
23040102/
09000013 |
Direct intervention in design and survey of soil erosion and flood sites across
the state for mitigation measures (NEWMAP) |
0915 |
150,000,000 |
150,000,000 |
100,000,000 |
0 |
325,000,000 |
500,000,000 |
500,000,000 |
1,325,000,000 |
|
|
SUB-TOTAL |
|
550,000,000 |
563,784,424.28 |
777,900,000 |
24,930,000
|
920,000,000 |
1,205,000,000 |
1,105,000,000 |
3,230,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF ENVIRONMENT |
|
|
|
|
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
35001001 |
MINISTRY OF ENVIRONMENT |
|
|
|
|
|
|
|
|
|
|
|
ENVIRONMENTAL IMPROVEMENT |
|
|
|
|
|
|
|
|
|
35001001/
23040106/
09000014 |
Ecological baseline study of all erosion
sites across the three(3) zones |
0915 |
0 |
0 |
5,000,000 |
0 |
6,500,000 |
3,000,000 |
3,000,000 |
12,500,000 |
|
35001001/
23050104/
09000015 |
Anniversaries/celebration; world environment day, National council environment |
0911 |
0 |
0 |
2,000,000 |
0 |
5,000,000 |
5,000,000 |
5,000,000 |
15,000,000 |
|
|
SUB-TOTAL |
|
0 |
0 |
7,000,000 |
0 |
11,500,000 |
8,000,000 |
8,000,000 |
27,500,000 |
|
TOTAL CAPITAL EXPENDITURE, MINISTRY OF ENVIRONMENT |
691,200,000
|
749,784,424.28
|
961,900,000 |
255,223,000
|
1,185,000,000 |
1,746,000,000 |
1,591,000,000 |
4,522,000,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EBONYI STATE 2017 – 2019 MEDIUM TERM EXPENDITURE FRAMEWORK AND THE 2017 CAPITAL
BUDGET
DETAILED CAPITAL EXPENDITURE |
|
SECTOR: |
05 SOCIAL |
|
|
|
|
|
|
|
|
|
|
MINISTRY/DEPARTMENT/AGENCY: |
MINISTRY OF LOCAL GOVT., CHIEFTAINCY MATTERS AND RURAL DEVELOPMENT |
|
|
|
ORGANIZATION/ ECONOMIC/ PROGRAM/ PROJECT CODE |
PROJECT DESCRIPTION |
PROGRAMME OBJECTIVE CODE |
BUDGET 2015 |
ACTUAL 2015 |
BUDGET 2016 |
ACTUAL 2016 |
BUDGET 2017 |
BUDGET 2018 |
BUDGET 2019 |
TOTAL |
|
2017 - 2019 |
|
51001001 |
MINISTRY OF LOCAL GOVT., CHIEFTAINCY MATTERS AND RURAL DEVELOPMENT |
|
|
|
|
|
|
|
HOUSING AND URBAN DEVELOPMENT |
|
|
|
|
|
|
|
|
|
51001001/
23020114/
06000001 |
Development of Rural Roads (Earth work and concrete in 13 LGAs). |
0601 |
300,000,000 |
288,648,736.33 |
462,000,000 |
0.00 |
190,000,000 |
55,000,000 |
11,000,000 |
256,000,000 |
|
51001001/
23010106/
06000002 |
Purchase of 1No. Hilux Van for project monitoring and supervision. |
0601 |
0 |
0 |
16,000,000 |
0 |
15,000,000 |
0 |
0 |
15,000,000 |
|
51001001/
23010108/
06000003 |
Purchase of 1No. Saloon Cars |
0601 |
0 |
0 |
17,000,000 |
0 |
8,500,000 |
0 |
0 |
8,500,000 |
|
51001001/
23020118/
06000004 |
Grants to 138 Communities for self-help Projects. |
0601 |
60,000,000 |
0 |
30,000,000 |
0 |
19,500,000 |
75,900,000 |
75,900,000 |
171,300,000 |
|
51001001/
23050104/
06000005 |
National Community Development Day Celebration. |
0601 |
9,000,000 |
0 |
5,000,000 |
0 |
1,950,000 |
5,500,000 |
5,500,000 |
12,950,000 |
|
51001001/
23050104/
06000006 |
Purchase of 90Nos Saloon cars for Traditional Rulers, State Govt. to pay 30% of
the Total cost. |
0601 |
0 |
0 |
0 |
0 |
135,000,000
|
0 |
0 |
450,000,000 |
|
TOTAL CAPITAL EXPENDITURE, MINISTRY OF LOCAL GOVT., CHIEFTAINCY MATTERS & RURAL
DEV. |
369,000,000 |
288,648,736.33 |
530,000,000 |
0 |
369,950,000 |
136,400,000 |
92,450,000 |
598,800,000 |
|